>> GREAT. WE'RE GOING TO GO AHEAD AND GET STARTED.

[00:00:02]

WELCOME EVERYONE TO OUR REGULAR COUNCIL MEETING.

TODAY IS TUESDAY, MAY 2ND, 2023.

I'M CALLING THE MEETING TO ORDER AND LETTING EVERYONE KNOW THAT NOTICE IS HEREBY GIVEN TO THE MEMBERS OF THE CITY COUNCIL AND TO THE GENERAL PUBLIC THAT AT THIS REGULAR MEETING, THE CITY COUNCIL MAY VOTE TO GO INTO EXECUTIVE SESSION, WHICH WILL NOT BE OPEN TO THE PUBLIC FOR LEGAL ADVICE AND DISCUSSION WITH THE CITY'S ATTORNEYS ON ANY ITEM LISTED ON THE FOLLOWING AGENDA.

ROLL CALL, PLEASE.

>> MAYOR DAGGETT.

>> HERE.

>> VICE MAYOR ASLYNN.

>> PRESENT.

>> COUNCIL MEMBER HARRIS.

>> HERE.

>> COUNCIL MEMBER HOUSE.

>> HERE.

>> COUNCIL MEMBER MCCARTHY.

COUNCIL MEMBER SWEET.

>> HERE.

>> COUNCIL MEMBER MATTHEWS.

>> CAN I SAY YES TWICE?

>> THANK YOU.

>> COUNCIL MEMBER SWEET, WOULD YOU LEAD US IN THE PLEDGE OF ALLEGIANCE?

>> WOULD BE MY HONOR. PLEASE STAND A FABLE

>> COUNCIL MEMBER HOUSE, WOULD YOU READ THE CITY'S MISSION STATEMENT?

>> YES, IT'S MY HONOR, THE MISSION OF THE CITY OF FLAGSTAFF IS TO PROTECT AND ENHANCE THE QUALITY OF LIFE FOR ALL.

>> THANK YOU. COUNCIL MEMBER HARRIS, WOULD YOU READ OUR LAND ACKNOWLEDGMENT?

>> CERTAINLY. THE FLAGSTAFF CITY COUNCIL HUMBLY ACKNOWLEDGES THE ANCESTRAL HOMELANDS OF THIS AREA'S INDIGENOUS NATIONS AND ORIGINAL STEWARDS.

THIS LAND STILL INHABITED BY NATIVE DESCENDANTS, BORDER MOUNTAINS SACRED TO INDIGENOUS PEOPLES.

WE HONOR THEM, THEIR LEGACIES, THEIR TRADITIONS, AND THEIR CONTINUED CONTRIBUTIONS.

WE CELEBRATE THEIR PAST, PRESENT, AND FUTURE GENERATIONS WHO WILL FOREVER KNOW THIS PLACE IS HOME.

>> THANK YOU. MOVING DOWN TO ITEM 4A,

[A. Consideration and Approval of Minutes: City Council Special Work Session of March 22, 2022, Regular Meeting of April 5, 2022, Regular Meeting of March 21, 2023, Special Meeting (Executive Session) of April 11, 2023, Special Meeting (Executive Session) of April 14, 2023, and Special Meeting (Executive Session) of April 25, 2023. STAFF RECOMMENDED ACTION: Approve the minutes of the City Council Special Work Session of March 22, 2022, Regular Meeting of April 5, 2022, Regular Meeting of March 21, 2023, Special Meeting (Executive Session) of April 11, 2023, Special Meeting (Executive Session) of April 14, 2023, and Special Meeting (Executive Session) of April 25, 2023.]

APPROVAL OF MINUTES FROM PREVIOUS MEETINGS.

DO ANY COUNCIL MEMBERS HAVE QUESTIONS OR COMMENTS ABOUT ANY OF THE MINUTES? I'LL ENTERTAIN A MOTION.

>> I'LL MOVE TO APPROVE.

>> THANK YOU. DO I HAVE A SECOND?

>> I'LL SECOND.

>> THANK YOU. ANY DISCUSSION? ALL THOSE IN FAVOR, AYE.

>> AYE.

>> ANY OPPOSED? MOVING DOWN TO ITEM NUMBER 5, PUBLIC PARTICIPATION.

[5. PUBLIC PARTICIPATION Public Participation enables the public to address the Council about an item that is not on the agenda. Comments relating to items that are on the agenda will be taken at the time that the item is discussed. If you wish to address the Council at tonight's meeting, please complete a comment card and submit it to the recording clerk as soon as possible. Your name will be called when it is your turn to speak. You may address the Council up to three times throughout the meeting, including comments made during Public Participation. Please limit your remarks to three minutes per item to allow everyone an opportunity to speak. At the discretion of the Chair, ten or more persons present at the meeting and wishing to speak may appoint a representative who may have no more than fifteen minutes to speak. ]

PUBLIC PARTICIPATION ENABLES THE PUBLIC TO ADDRESS THE COUNCIL ABOUT AN ITEM THAT IS NOT ON THE AGENDA.

COMMENTS RELATED TO ITEMS THAT ARE ON THE AGENDA WILL BE TAKEN AT THE TIME THAT THE ITEM IS DISCUSSED.

IF YOU WISH TO ADDRESS COUNCIL AT TONIGHT'S MEETING, PLEASE COMPLETE A COMMENT CARD AND SUBMIT IT TO THE RECORDING CLERK AS SOON AS POSSIBLE.

YOUR NAME WILL BE CALLED WHEN IT IS YOUR TURN TO SPEAK.

YOU MAY ADDRESS THE COUNCIL UP TO THREE TIMES THROUGHOUT THE MEETING, INCLUDING COMMENTS MADE DURING PUBLIC PARTICIPATION.

PLEASE LIMIT YOUR REMARKS TO THREE MINUTES PER ITEM TO ALLOW EVERYONE AN OPPORTUNITY TO SPEAK.

AT THE DISCRETION OF THE CHAIR, 10 OR MORE PERSONS PRESENT AT THE MEETING AND WISHING TO SPEAK MAY APPOINT A REPRESENTATIVE WHO MAY HAVE NO MORE THAN 15 MINUTES TO SPEAK.

WE DO HAVE ONE OF THOSE THIS EVENING, AND BECAUSE WE HAVE SUCH A BUSY AGENDA, I AM GOING TO ALLOW 10 MINUTES TO SPEAK.

PUBLIC PARTICIPATION.

SPENCER MORAN.

>> HI.

WELL, MY NAME IS SPENCER MORAN.

I'VE LIVED IN FLAGSTAFF FOR ABOUT A YEAR.

I GO TO NAU RIGHT NOW.

I WALK AROUND CAMPUS AND THE CITY OF LA AND I'VE NOTICED THAT AFTER THE WINTER STORMS HAVE PASSED, A LOT OF THE CROSSWALKS ARE IN NEED OF REPAINTING.

JUST ON MY WALK HERE, I PARKED IN DOWNTOWN AND WAS WALKING AROUND BEFORE I CAME HERE, AND ON THE ROAD OF WEST CARY AVE AND NORTH HUMPHREY STREET NEEDS MAJOR REPAINTING.

IT'S REALLY HARD TO SEE THAT THERE WAS EVEN CROSSWALK THERE TO BEGIN WITH.

I BELIEVE THAT CROSSWALKS NEED TO BE REPAINTED A LOT SOONER BECAUSE THEY WILL HELP PEDESTRIANS NOT GET HIT OR GET PUT IN HARM'S WAY.

[00:05:05]

CROSSWALKS ALSO JUST DON'T HELP THEM, BUT IT HELPS DRIVERS REALIZE THAT THEY NEED TO BE ON THE LOOKOUT FOR PEDESTRIANS THAT WILL CROSS.

AS YOU KNOW, IN THE CITY WE HAVE SOME CROSSWALKS THAT ARE ON A CONTINUOUS ROAD WITH NO STOP SIGNS FOR TWO WAYS AND A LOT OF THE PEOPLE IN NAU WALK AROUND EVERYWHERE AND I BELIEVE THAT'S IMPORTANT FOR THEM TO BE SAFE WHEN THEY WALK.

A FEW MONTHS AGO JUST OUTSIDE MY BUILDING, SOMEONE WAS HIT BY A CAR LUCKILY THEY HAD NO LASTING INJURIES BUT I BELIEVE THAT'S JUST VERY IMPORTANT TO ESTABLISH REGULAR MAINTENANCE FOR THOSE AT LEAST RIGHT AFTER THE SNOWSTORM AND THEY'RE HEAVILY DEGRADED FROM WHAT THEY WERE BEFORE TO YOU ENSURE THAT NOBODY ELSE GETS HURT. THANK YOU.

>> THANK YOU. CITY MANAGER, DID YOU TAKE NOTE OF THAT INTERSECTION THAT OUR SPEAKER SPOKE TO?

>> YES. THANK YOU.

>> THANK YOU. ONE THING THAT I DID FORGET TO MENTION, DURING PUBLIC PARTICIPATION, COUNCIL CAN'T RESPOND TO SPEAKERS.

JARED RUSSELL.

>> GOOD EVENING. I'M BRINGING UP A SIMILAR ISSUE, BUT INSTEAD WITH CROSSWALKS AND WE'RE JUST TALKING ABOUT THE POTHOLES THAT ARE IN FLAGSTAFF [LAUGHTER] I'M SURE MOST PEOPLE EXPERIENCED A POTHOLE ON THE WAY OVER HERE.

EVEN ON MY DRIVE AROUND IN TOWN, I NOTICED ONE BY SIENTA WAS LIKE THREE FEET BY THREE FEET.

I THINK IT'S TOUGH FOR SMALL CARS, THEY DON'T HAVE HIGH CLEARANCE AND IT CAN JUST CAUSE MAJOR DESTRUCTION.

I THINK AFTER THIS WINTER SEASON, JUST ABOUT FIXING THOSE POTHOLES AND I THINK JUST FILLING THEM IN IS JUST A SHORT-TERM SOLUTION TO A PROBLEM THAT NEEDS A LONG-TERM SOLUTION.

I BELIEVE THAT IT WOULD JUST BE BENEFICIAL TO EVERYBODY IN THE CITY SO WE JUST HAVE SAFE DRIVERS, IT'S NOT CAUSING ANY DAMAGE TO CARS, NOBODY IS GETTING INJURED, HOPEFULLY NO REX BECAUSE OF IT.

I JUST WANT TO LET THE CITY COUNCIL KNOW AND HOPEFULLY A SOLUTION TO THIS ISSUE FOR THE PEOPLE WHO LIVE AND WORK HERE. THAT'S IT, THANK YOU.

>> THANK YOU, JARED.

ZEIHA. DID I PRONOUNCE THAT CORRECTLY, MCKINNEY? SAY THAT AGAIN.

>> ZAISHA. [NOISE] MY NAME IS ZAISHA MCKINNEY AND I ATTEND NORTHERN ARIZONA UNIVERSITY.

TODAY I'LL BE BRINGING TO ATTENTION THE HORRIBLE TRAFFIC CONDITIONS WE UNDER HERE IN FLAGSTAFF.

WHAT CAN BE DONE TO CUT DOWN ON HEAVY TRAFFIC.

AS A RESIDENT, I'VE SEEN FIRSTHAND HOW TRAFFIC AFFECTS NOT ONLY CARS ON THE ROAD, BUT ALSO PEDESTRIANS.

[NOISE] SEPTEMBER 21, 2022, MY ROOMMATE WAS RETURNING FROM HER DORM FROM A CALCULUS CLASS WHEN SHE WAS MOWED DOWN IN THE CROSSWALK AT MILTON AND UNIVERSITY DRIVE BY BICYCLISTS.

ONE OPTION TO DECREASE THE DEMAND AND TRAFFIC WOULD BE BY IMPLEMENTING CONGESTION PRICING.

THIS MEANS DRIVERS ARE CHARGED AN EXTRA FEE TO TRAVEL ON ROADS AND BUSINESS DISTRICTS DURING PEAK HOURS.

DURING WINTER MONTHS, TRAFFIC CONDITIONS ARE ESPECIALLY BAD, LEAVING MANY CARS AND SEMI TRUCKS ON THE SIDE OF THE ROAD WITH EMERGENCY CREWS.

FLAGSTAFF METROPOLITAN PLANNING ORGANIZATION AND CONJUNCTION WITH ITS MEMBERS, THE CITY OF FLAGSTAFF, COCONINO COUNTY, THE ARIZONA DEPARTMENT OF TRANSPORTATION AND THE NORTHERN ARIZONA INTER GOVERNMENT PUBLIC TRANSPORTATION AUTHORITY HAVE DEVELOPED AND BEEN LOOKING TO IMPLEMENT THE 2040 RPT.

THIS REGIONAL TRANSPORTATION PLAN RECOMMENDS A VARIETY OF TRANSPORTATION INVESTMENTS [NOISE] TO BE MADE OVER THE NEXT 20 YEARS, INCLUDING AN EXPANDED ROAD NETWORK AND INCREASE LEVELS OF SERVICE OF TRANSIT, PEDESTRIAN, AND BICYCLE SYSTEMS. THIS WILL HELP IN MANY WAYS, INCLUDING PRESERVING THE ENVIRONMENT AND IMPROVING TRAVELERS SAFETY AND IMPROVING THE EFFICIENCY OF MOVING PEOPLE.

I URGE THE CITY COUNCIL TO LOOK INTO CONGESTION PRICES, AS WELL AS THE BLUEPRINT OF RPT IN ORDER TO DECREASE THE DEMAND AND TRAVEL, AND PROTECT THE CITIZENS OF FLAGSTAFF.

THERE'S SO MUCH MORE TO DISCUSS ON THIS ISSUE, BUT I DON'T WANT US TO TAKE UP ANY MORE OF YOUR TIME.

THANK YOU. [NOISE]

>> THANK YOU. ZAKAI MARTIN,

[00:10:05]

AND THEN DAPPER DREY.

>> AM ZAKAI MARTIN AND I ATTEND NORTHERN ARIZONA UNIVERSITY AND I'M A CONSTRUCTION MANAGEMENT MAJOR.

I WOULD LIKE TO BRING ATTENTION TO THE ISSUE OF POTHOLES IN OUR CITY AS WELL.

I'VE BEEN A RESIDENT OF FLAGSTAFF FOR THREE YEARS NOW AND I'VE EXPERIENCED A LOT OF POTHOLES AND MY TIME DRIVING ON THE ROADS.

IN FACT, A COUPLE OF MONTHS AGO WHILE I WAS DRIVING ON ROUTE 66 ON MY WAY HOME FROM WORK, I HIT A LARGE POTHOLE AND IT CAUSED MY TIRE TO POP.

I HAD TO GET ANOTHER TIRE FOR THAT.

A SOLUTION THAT I RESEARCHED WAS TO UTILIZE FOX YIELDS.

A FOX YIELDS IS A LIGHT APPLICATION OF A DILUTED SLOW SETTING ASPHALT EMOTION TO THE SURFACE OF AN AGED PAVEMENT SURFACE.

THIS HELPS PREVENT WATER INTRUSION, SLOW PAVEMENT DETERIORATION, AND IMPROVES AGGREGATE RETENTION.

I URGE THE CITY COUNCIL TO PRIORITIZE FIXING THESE POTHOLES AS SOON AS POSSIBLE TO ENSURE SAFETY OF ALL DRIVERS AND PREVENT UNNECESSARY DAMAGE TO THEIR VEHICLES.

THANK YOU FOR YOUR TIME AND ATTENTION TO THIS MATTER.

>> THANK YOU. DAPPER DREY, AND THEN JANET WESSELS.

>> THANK YOU MAYOR, COUNCIL, STAFF, AND EVERYBODY IN ATTENDANCE.

SOUNDS LIKE YOU'RE HEARING A LOT ABOUT STREETS, AM HERE FOR THE [NOISE] SAME THING.

AS NINE RAN OUT INTO TRAFFIC, ALMOST GOT HIT BY A CAR.

THANK GOODNESS. DIDN'T HAPPEN AND GREW UP IN EL PASO, TEXAS, FAR DIFFERENT FROM HERE.

THIRTY YEARS LATER, I WAS DOING MY BEST TO BE AS SAFE AS POSSIBLE.

WE'RE IN AS MUCH SAFETY AS I COULD, GOT RUN OVER BY A TOW TRUCK.

WE ALL KNOW, I'M LUCKY TO BE ALIVE, LUCKY TO BE STANDING IN FRONT OF YOU.

I PRETTY MUCH THINK THAT EVENTUALLY I PROBABLY AM DESTINED TO DIE BY VEHICULAR VIOLENCE.

IT'S CONSTANTLY, HOW DO WE MAKE CARS FASTER? HOW DO WE MAKE IT FOR CARS FASTER? HOW DO WE GET PEOPLE TO SPEND WHAT, TWO MINUTES LESS IN TRAFFIC, 10 MINUTES LESS IN TRAFFIC? IF ANYBODY WAS DRIVING THE NIGHT OF MAY 28, 2021, I SINCERELY APOLOGIZE FOR INCONVENIENCING YOU BY BLEEDING OUT IN THE STREET AND HAVING MY FRIEND DIE BESIDE ME.

REALLY, REALLY SORRY ABOUT THAT.

BUT WE CONTINUE TO PRIORITIZE CARS.

WE'LL CONTINUE TO DO IT, MAKE THEM FASTER, FIX THE POTHOLES. GREAT, COOL.

BUT AGAIN, FIRST, FIX THE CROSSWALKS, MAKE IT SAFE FOR EVERYBODY.

WE DID THE DOWNTOWN IMPROVEMENT DISTRICT, WHICH IS SUPPOSED TO BE OUR MOST PEDESTRIAN FAMILY PLACE IN TOWN 30 YEARS AGO AND HAD NOT IMPROVED SINCE.

YOU WANT TO TRY TO WALK OR YOU WANT TO TRY TO BE IN A WHEELCHAIR, GO BY PITA PIT.

THINK THAT LIKE PATIO SECTION WITH AN INCLINE CORNER IS GOOD FOR ANY TYPE OF PEDESTRIAN BESIDES ABLE-BODIED PEOPLE.

IF YOU'RE NOT ON A BIKE, IT'S BIKE MONTH. I GET THAT.

BUT TRY TO THINK OUTSIDE THE CAR, TRY TO NOT JUST ALWAYS DRIVE BY YOURSELF IN A VEHICLE.

[NOISE] VEHICLES ARE GETTING BIGGER, LOUDER, AND DUMBER, MUCH LIKE THE PEOPLE THAT ARE DRIVING THEM.

YOU HAVE A TV.

IT'S LIKE THIS SIZE FOR BACKUP SCREEN.

YOU DON'T THINK WE'RE DISTRACTED AND WE CAN'T DO ANYTHING ABOUT THE SIZE OF VEHICLES.

WE CAN'T DO ANYTHING ABOUT A LOT OF THESE LARGE THINGS, BUT WE CAN MAKE OUR STREETS SAFER FOR EVERYONE.

AS SOON AS SOMEBODY PARKS, THEY BECOME A PEDESTRIAN INSTANTLY IF THEY'RE LUCKY.

YES, I KNOW WE HAVE TO HAVE ACCESSIBILITY FOR FOLKS WHO CAN'T WALK.

I ALMOST WAS ONE OF THOSE FOLKS.

I KNOW PEDESTRIAN AND BIKE FRIENDLY.

ANY SPACES, DOWNTOWN SPACES.

DOWNTOWN WAS BUILT BEFORE CARS WERE THE PREVALENT MODE OF TRANSPORTATION.

CELEBRATE THAT, HONOR THAT.

WE HAVE TWO MILES OF HEAVILY PEDESTRIAN STREETS, AND THAT'S PRETTY MUCH FROM FMC TO NORTH CAMPUS, ON BEAVER AND SAN FRANCISCO.

THAT'S NOT THAT MUCH TO IMPROVE, TO MAKE IT SAFE, TO MAKE ALL THOSE INTERSECTIONS PEDESTRIAN FRIENDLY AND SAFE FOR EVERYBODY TO WALK AROUND.

LASTLY, WE CELEBRATE WHEN WE CLOSE STREETS, WHAT DO WE DO FOR FOURTH OF JULY? WHAT DO WE DO FOR NEW YEAR'S EVE? WHAT DO WE DO FOR FARMERS MARKET COMING UP ON SUNDAY? WE CLOSE STREETS.

[NOISE]

>> THANK YOU. JANET WESSELS AND TOM PEARSON.

>> AFTERNOON MAYOR, COUNCIL.

I'LL GIVE YOU A BREAK FROM THE TRAFFIC AND TELL YOU A COUPLE OF DATES THAT ARE OCCURRING THIS WEEK THAT YOU MAY OR MAY NOT KNOW ABOUT.

ONE IS THE TACO BOUT FUN RUN.

I'M HERE IN THE CAPACITY OF BOARD MEMBER OF THE HOPE OF PREGNANCY RESOURCE CENTER.

THEIR MISSION IS TO REACH OUT IN LOVE WITH LIFE-AFFIRMING SERVICES THAT EMPOWER PARENTS

[00:15:01]

TO CHOOSE LIFE [NOISE] FOR THEIR UNBORN BABIES.

THE INFORMATION ABOUT THAT CAN BE FOUND ON THEIR WEBSITE, HOPEPRC.NET\EVENTS.

IT'S THIS SATURDAY, THE SIXTH AT 8:00 AM AT BUFFALO PARK.

ALSO, THEY PROVIDE CONFIDENTIAL PREGNANCY TESTS, FREE ULTRASOUNDS, STI TESTING, OPTION INFORMATION, AS WELL AS FREE MATERIAL RESOURCES SUCH AS MATERNITY CLOTHES, BABY CLOTHES, DIAPERS, BABY SUPPLIES, PARENTING CLASSES, AND COMMUNITY RESOURCES.

THE SECOND THING THAT I WANTED TO LET YOU KNOW, AND I APOLOGIZE FOR GETTING THIS TOO LATE FOR THE MAYOR TO HAVE A PROCLAMATION, BUT THIS THURSDAY IS THE NATIONAL DAY OF PRAYER.

A NATIONAL DAY OF PRAYER HAS NOT ONLY BEEN A PART OF OUR HERITAGE SINCE IT WAS DECLARED BY THE FIRST CONTINENTAL CONGRESS IN 1775, BUT IT IS A PUBLIC LAW ESTABLISHED IN THE UNITED STATES CONGRESS IN 1952, APPROVED BY A JOINT RESOLUTION AND AMENDED BY CONGRESS AND PRESIDENT REAGAN WITH PUBLIC LAW 100/307 IN 1988, AFFIRMING THAT IT IS ESSENTIAL FOR US AS A NATION TO PRAY AND DIRECTING THE PRESIDENT OF THE UNITED STATES TO SET ASIDE AND PROCLAIM THE FIRST THURSDAY OF MAY ANNUALLY AS A NATIONAL DAY OF PRAYER.

IN OUR STATE AND ACROSS AMERICA, THE OBSERVANCE OF THE NATIONAL DAY OF PRAYER WILL BE HELD ON THURSDAY, MAY 4, 2023, WITH THE THEME, "PRAY FERVENTLY IN RIGHTEOUSNESS AND AVAILED MUCH." BASED ON THE VERSES IN JAMES 5:16, THE EFFECTIVE FERVENT PRAYER OF A RIGHTEOUS MAN AVAILS MUCH.

THERE ARE MANY PLACES YOU CAN JOIN THE PRAYER EFFORTS IN THE CITY.

I HAPPEN TO BELONG TO URBAN HOPE CHURCH AS THE PRAYER DIRECTOR THERE, YOU CAN JOIN US FROM 9:0Z AM TO 6:00 PM.

YOU CAN ALSO GO ONLINE TO THE NATIONAL DAY OF PRAYER.ORG AND THEY HAVE PRAYER RESOURCE GUIDES. THANK YOU FOR YOUR TIME.

>> THANK YOU, JANET. [APPLAUSE] TOM PEARSON AND THEN STEPHEN POOR.

TOM, YOU HAVE A GROUP WITH YOU TOO.

>> I DO.

>> COULD I HAVE EVERYONE STAND UP WHO'S IN YOUR GROUP?

>> STAND UP. [NOISE]

>> I THINK YOU HAVE ENOUGH TO TAKE 10 MINUTES.

[LAUGHTER]

>> MADAM MAYOR, COUNCIL MEMBERS, I THOUGHT THIS MIGHT BE A POWERPOINT PRESENTATION, BUT IT'S NOT, SO I HAVE A HANDOUT FOR EACH OF YOU.

IF YOU COULD FOLLOW ALONG WITH THAT, PLEASE.

AS I GO THROUGH THIS, I'M GOING TO READ IT TO GET THROUGH IT AS FAST AS I CAN.

THANK YOU FOR THIS OPPORTUNITY TO SPEAK TO YOU TODAY.

I WANT TO INTRODUCE A NEW GRASSROOTS COMMUNITY ORGANIZATION, FLAGSTAFF FIRST.

WE ARE THE UNHEARD TAXPAYERS, HOMEOWNERS, AND SMALL BUSINESS PEOPLE OF FLAGSTAFF AND COCONINO COUNTY.

I'M HERE TODAY BECAUSE WE HAVE DEEP CONCERNS ABOUT ELEMENTS OF FLAGSTAFF'S CARBON NEUTRALITY PLAN.

ALTHOUGH PARTS OF THE PLAN ARE DESIRABLE AND CONSTRUCTIVE, WE FIND THE PLANS MASSIVE ELECTRIC POWER INFRASTRUCTURE TRANSFORMATION HIGHLY PROBLEMATIC.

SPECIFICALLY, WE BELIEVE THE GOAL OF CONVERTING THE CITY'S ENERGY INFRASTRUCTURE TO ALL RENEWABLE POWER SOURCES AND ALL-ELECTRIC BUILDINGS IS GRAVELY MISGUIDED.

OUR CURRENT RESILIENT AND SUSTAINABLE MULTI-SOURCE POWER GRID WILL BE REDUCED TO TWO HIGHLY VARIABLE AND UNRELIABLE RENEWABLES, WIND AND SOLAR.

WE KNOW THE PLAN WILL COST TENS OF MILLIONS OF DOLLARS, BOTH DIRECTLY IN TAXES AND INDIRECTLY THROUGH CODES AND REGULATIONS IMPOSED ON HOMEOWNERS AND BUSINESSES.

THE PLAN WILL DRAMATICALLY INCREASE FLAGSTAFF'S ELECTRIC POWER DEMAND BY CONVERTING GOVERNMENT BUILDINGS, BUSINESSES, AND HOMES TO ALL-ELECTRIC HEATING AND APPLIANCES.

SIMULTANEOUSLY, TRANSPORTATION WILL TRANSITION TO ELECTRIC VEHICLES FOR GOVERNMENT, COMMERCIAL, AND PRIVATE USE.

ADOPTING THESE DRAMATIC CHANGES TO OUR ENERGY INFRASTRUCTURE WILL INCREASE THE RISK OF PROLONGED POWER OUTAGES AND GRID COLLAPSE, PRESENTING A CLEAR AND PRESENT DANGER TO OUR LIVES AND PROPERTY.

WHY ARE WE SPENDING OUR WAY OF LIFE? ACCORDING TO FLAGSTAFF'S CLIMATE ACTION AND ADAPTATION PLAN, FLAGSTAFF IS COMMITTED TO MEETING THE INTENTIONS OF THE PARIS AGREEMENT BY JOINING THE INTERNATIONAL EFFORT TO REDUCE CO_2 IN THE GLOBAL ATMOSPHERE.

BUT THERE IS A FATAL FLAW IN THAT COMMITMENT.

IT'S THE ASSUMPTION THAT THERE ACTUALLY IS A WORLDWIDE EFFORT AND THAT THE INTERNATIONAL COMMUNITY IS UNIFORMLY WORKING TOGETHER TO DRAMATICALLY REDUCE CO_2 IN THE ATMOSPHERE.

THAT ASSUMPTION IS ABSOLUTELY FALSE.

IN FACT, THE WORLD'S GREATEST POLLUTER, CHINA, IS PRODUCING MORE THAN TWICE THE CO_2 EMISSIONS OF THE US.

WHILE US EMISSIONS ARE REDUCING EACH YEAR, CHINA, INDIA, AND RUSSIA ARE DRAMATICALLY INCREASING CO_2 POLLUTION.

WHILE FLAGSTAFF'S GOAL TO ACHIEVE CARBON NEUTRALITY BY 2030,

[00:20:04]

CHINA IS RAPIDLY INCREASING CO_2 POLLUTION HAS ONLY AGREED TO LEVEL OFF ITS GROWING EMISSIONS BY THAT DATE.

THAT'S LEVEL OFF THE GROWTH, NOT ACHIEVE CARBON NEUTRALITY.

IN 2018 ALONE, CHINA WAS BUILDING OVER 60 COAL-FIRED POWER PLANTS.

THE DATA IS ABSOLUTELY CLEAR.

ANY ACTION THAT WE MIGHT TAKE TO REDUCE EMISSIONS IN FLAGSTAFF OR IN THE UNITED STATES, FOR THAT MATTER, IS COMPLETELY OVERWHELMED BY CHINA, INDIA, AND RUSSIA'S RAPID AND RABID EXPANSION OF CO_2 POLLUTION.

THE TRAJECTORY OF GLOBAL WARMING WILL NOT CHANGE WITHOUT DRAMATIC ACTION BY CHINA, AND THAT IS NOT HAPPENING FOR YEARS TO COME, IF EVER.

ALTHOUGH THE CARBON NEUTRALITY PLAN WOULD HAVE AN INFINITESIMAL IMPACT ON THE TRAJECTORY OF GLOBAL WARMING, ITS IMPLEMENTATION WILL DRAMATICALLY REDUCE THE SECURITY AND QUALITY OF LIFE OF FLAGSTAFF CITIZENS AND BUSINESSES.

THE GOAL OF THE CNP IS TO RADICALLY TRANSFORM OUR ENERGY INFRASTRUCTURE TO RENEWABLE SOURCES ONLY AND ELECTRIC CUSTOMERS ONLY.

A KEY COMPONENT OF THE PLAN IS BUILDING FUEL SWITCHING.

THIS MEANS ELIMINATING CARBON FUELS, NATURAL GAS, PROPANE, WOOD, ETC., FROM OUR HOMES AND BUSINESSES AND REPLACING THESE WITH ELECTRIC HEAT PUMPS AND APPLIANCES.

THIS RADICAL TRANSFORMATION WILL OCCUR IN BOTH NEW CONSTRUCTION AND BY CONVERSION OF EXISTING HOMES AND BUSINESSES.

THE CNP ESTABLISHES THE GOAL OF CARBON NET-ZERO CONSTRUCTION CODES FOR ALL NEW RESIDENTIAL AND COMMERCIAL BUILDINGS BY 2030, WITH AN INTERMEDIATE GOAL OF 2025.

FOR EXISTING HOMES AND BUSINESSES, THE CNP DECLARES, "THIS PLAN ENVISIONS AND SUPPORTS PERFORMING HOME ENERGY AND ELECTRIFICATION RETROFITS ON 12,500 HOMES, THAT'S 50 PERCENT OF EXISTING HOUSING STOCK, IN ADDITION TO A SIGNIFICANT NUMBER OF BUILDING RETROFITS IN THE COMMERCIAL SECTOR." A SIMILAR DRAMATIC SHIFT IS PLANNED FOR TRANSPORTATION THROUGH THE ELECTRIC MOBILITY PORTION OF THE CARBON NEUTRALITY PLAN.

AS CNP SAYS, THE FUTURE OF MOBILITY IS ELECTRIC.

FLAGSTAFF'S FIRST ELECTRIC BUSES ARE UP AND RUNNING, THAT'S THE FIRST STEP IN TRANSITIONING ALL CITY, SCHOOL, AND UNIVERSITY BUSES TO ELECTRIC.

AT THE SAME TIME, 20% OF CITY VEHICLES WILL BE ELECTRIC BY 2030.

FINALLY, THE CNP INCLUDES BUILDING A CHARGING INFRASTRUCTURE AND MAKING NEW REGULATIONS AND INCENTIVES TO PROMOTE PRIVATE ELECTRIC VEHICLES, INCLUDING CARS, BIKES, AND SCOOTERS.

ALL OF THESE TRANSFORMATIONS TO ELECTRIC POWER IN HOMES, BUSINESSES, GOVERNMENT BUILDINGS, BUSES, GOVERNMENT VEHICLES, PRIVATE VEHICLES WILL DRAMATICALLY INCREASE FLAGSTAFF'S ELECTRIC POWER DEMAND.

UNFORTUNATELY, THE CARBON NEUTRALITY PLAN DOES NOT QUANTIFY THIS INCREASE OR THE COST OF THE NEW INFRASTRUCTURE REQUIRED TO SUPPORT IT.

ALTHOUGH WE DON'T KNOW THE MAGNITUDE OF THE FUTURE POWER DEMANDS, THE CNP IS CLEAR THAT ONLY RENEWABLE POWER SOURCES ARE IN VISION, 100% OF MUNICIPAL ELECTRICITY USE WILL BE FROM RENEWABLES BY 2025, 68% OF COMMUNITY ELECTRICITY WILL COME FROM ZERO-CARBON ENERGY BY 2030, AND FINALLY, CITY COUNCIL ESTABLISHED A GOAL, 100% RENEWABLE ELECTRICITY BY 2050.

THE CNP IDENTIFIES TWO RENEWABLE SOURCES FOR FLAGSTAFF, WIND AND SOLAR.

BOTH, HOWEVER, ARE PROBLEMATIC IN NORTHERN ARIZONA.

AS WE ALL KNOW FROM OUR ENERGY BILLS WITH OUR COLD WINTERS AND MILD SUMMERS, PEAK ELECTRICAL DEMAND IS IN THE WINTER.

UNFORTUNATELY, WINTER IS WHEN DAYLIGHT IS SHORTER AND SOLAR OUTPUT IS THAT A MINIMUM.

SHORTER DAYLIGHT HOURS, OVERCAST SKIES, SNOW ON SOLAR PANELS ALL CONSPIRE TO REDUCE POWER PRODUCTION.

WIND POWER TOO IS VULNERABLE TOO IN WINTER.

THIS PERFECT STORM OF MINIMUM ENERGY AVAILABLE WHILE DEMAND IS AT A MAXIMUM THREATENS BROWNOUTS, BLACKOUTS, AND EVEN A COLLAPSE OF THE GRID.

THE CARBON NEUTRALITY PLAN GOAL OF ALL-ELECTRIC HOMES AND BUSINESSES PROVIDES NO BACKUP, NO ALTERNATIVE POWER SOURCES.

FLAGSTAFF COULD BE LARGELY COLD AND DARK FOR DAYS WITH ALL THE HUMAN SUFFERING THAT GOES WITH THIS SCENARIO.

ENERGY DIVERSITY EQUALS SUSTAINABILITY.

DON'T DESTROY FLAGSTAFF'S DIVERSE AND RESILIENT ENERGY ECOSYSTEM.

IT'S RELIABLE AND SUSTAINABLE THROUGHOUT THE YEAR, 24/7/365.

WELL, IF TRANSFORMING OUR ENERGY ECOSYSTEM TO 100% ELECTRIC BILLINGS AND RENEWABLES ENERGY ISN'T THE WAY AHEAD, WHAT IS?

[00:25:02]

FOR THE ANSWER WE NEED LOOK NO FURTHER THAN THE CLIMATE ACTION AND ADAPTATION PLAN OF 2018.

THE KEY DIFFERENCE IN THIS DOCUMENT IS ADAPTATION.

THE CAAP CORRECTLY IDENTIFIES THE THREE MAJOR THREATS TO FLAGSTAFF, WILDFIRES, FLOODING, AND DROUGHT.

WE NEED TO PUT FLAGSTAFF FIRST AND PLACE THESE THREATS AT THE TOP OF THE CITY'S PRIORITY LIST.

WE CAN EXPAND OUR LIMITED RESOURCES ON THE VAIN HOPE THAT ACHIEVING CARBON NEUTRALITY WILL SOLVE THESE PROBLEMS. THESE THREATS ARE WHAT WE SHOULD BE FOCUSING OUR MANPOWER, TIME, EFFORT, AND RESOURCES ON.

WE KNOW FIRSTHAND THAT WILDFIRES ARE TERRIBLE DESTROYERS OF LIFE AND PROPERTY.

FLAGSTAFF AREA WILDFIRES INCLUDE SCHULTZ FIRE 2010, MUSEUM FIRE 2019, TUNNEL FIRE 2022, HAYWIRE FIRE 2022, PIPELINE FIRE 2022, FOR A TOTAL OF 67,942 ACRES.

HAD THESE WILDFIRES EITHER BEEN PREVENTED OR QUICKLY SUPPRESSED, ALMOST TWO MILLION TONS OF CO_2 WOULD NEVER HAVE ENTERED THE ATMOSPHERE.

ADDITIONALLY, OVER 76,000 TONS OF CARBON DIOXIDE WOULD HAVE BEEN SEQUESTERED BY THOSE TREES EACH YEAR.

DEFEATING WILDFIRES, THERE'S NOT ONLY THE BEST WAY OF PRESERVING LIVES AND PROPERTY IN FLAGSTAFF, IT'S ALSO THE BEST WAY OF REDUCING THE AMOUNT OF CO_2 IN THE ATMOSPHERE.

WE MUST MAKE PREVENTION, DETECTION, AND RAPID SUPPRESSION OF WILDFIRES OUR PARAMOUNT OBJECTIVE.

WITH LEADERSHIP AND DETERMINATION, FLAGSTAFF CAN BECOME A LEADING CENTER FOR FOREST PRESERVATION.

LET'S BEGIN BY CO-SPONSORING WITH THE COUNTY FOREST SERVICE AND UNIVERSITY A MAJOR CONFERENCE ON WILDFIRE PREVENTION, DETECTION, AND SUPPRESSION.

WE MUST BRING TO BEAR ALL THE KNOWLEDGE AND NEW TECHNOLOGY AVAILABLE TO DEFEAT THE SCOURGE OF WILDFIRE.

HERE'S JUST ONE IDEA.

PHYSICIAN FIREFIGHTING AIRCRAFT AT PULLIAM AIRPORT DURING FIRE SEASON.

FILLED ALREADY ROOM, LOADING FACILITY, HAVE PILOTS, CREWS ON ALERT STATUS READY TO LAUNCH.

FIRES THEY CAN BE OVER THE FIRES IN MINUTES.

LOCATING AIRCRAFT LOCALLY ALSO INCREASES THE SALTY RATE. SORRY.

>> THANK YOU, MR. PIERSON.

>> STACY. [APPLAUSE] IF MR. PIERSON GIVES THAT DOCUMENT AS AN ELECTRONIC DOCUMENT, CAN IT BE MADE AVAILABLE TO THE PUBLIC? IS THERE A WAY FOR THE PUBLIC TO ACCESS IT?

>> MAYOR, LET ME GET BACK TO YOU ON THAT.

I DON'T KNOW THAT I HAVE A DIRECT ANSWER RIGHT NOW. MY APOLOGIES.

>> THANK YOU.

>> STEPHEN POOR AND THEN KYLIE FLICK.

>> THANK YOU MAYOR, VICE MAYOR, COUNCIL.

WE SPENT A LITTLE TIME TOGETHER IN SOME RETREATS THIS YEAR REGARDING BUDGETS AND AFTER CAREFUL CONSIDERATION AND I THOUGHT I'D COME TO YOU AND OFFER YOU A LITTLE TOOL POSSIBLY ON HOW DO YOU DECIDE HOW TO SPEND ALL THAT MONEY AND ALL THOSE PROJECTS.

I DIG DEEP DOWN INTO MY PAST AND I BRING UP DR. THOMAS SOWELL, THE AMERICAN ECONOMIST, WHO SUGGESTS YOU COULD JUST ANSWER THREE QUESTIONS, DECIDE ANYTHING.

THOSE ARE COMPARED TO WHAT, AT WHAT COST, AND WHAT EVIDENCE DO YOU HAVE? THE ONE THING I WANT TO TALK ABOUT TODAY IS THE $56 MILLION THAT'S ON THE TABLE TO SPEND FOR USGS BUILDING.

COMPARED TO WHAT, THE TREASURER LAID OUT AN AWFUL LOT OF PROJECTS THAT ARE ALIGNED WITH THE MISSION OF THE CITY.

THEY'RE ALIGNED WITH THE GOALS OF THE CITY.

BUT BEING A COMMERCIAL LANDLORD, I DON'T THINK THAT FITS IN ANY WORD THE MISSION STATEMENT.

I THINK YOU SHOULD TAKE THAT INFORMATION AND COME BACK AND HAVE YOUR STAFF TELL YOU.

WE'RE GOING TO SIGN A FIVE-YEAR LEASE AND SPENT $56 MILLION.

SOMEONE, PLEASE TELL ME MANNA FROM HEAVEN, YOU'RE GOING TO MAKE A RETURN ON YOUR INVESTMENT.

TELL ME WHAT THAT RETURN ON INVESTMENT IS, THAT'S WHAT YOU SHOULD BE GETTING FROM STAFF.

WHAT'S THE CAP RATE? THAT'S WHAT YOU SHOULD BE GETTING FROM STAFF.

WHEN THOSE NUMBERS COME BACK NEGATIVE EVEN BEFORE THEN, YOU SHOULD CONSIDER SELLING THAT PROPERTY.

LET SOME COMMERCIAL DEVELOPER DO IT.

YOU HAVE WHAT? OVER A BILLION DOLLARS OF PROJECTS THAT WERE OUTLINED THAT ARE GOING TO BE FUNDED.

I THINK YOU CAN SPEND THAT $56 MILLION BETTER ON THE MISSION OF WHAT YOU ALL STAND UP FOR.

YOU COULD ALSO SELL TO THE COURTHOUSE, GET OUT OF THE REAL ESTATE BUSINESS.

YOU BARELY HAVE ENOUGH STAFF, AS YOU POINTED OUT, YOUR STAFF TURNOVER IS GREAT.

YOU'RE WORKING ON THAT. I APPRECIATE THAT.

BUT THIS IS ONE AREA YOU DON'T NEED TO INVEST IN.

[00:30:03]

YOU'RE NOT GOING TO MAKE RETURN.

THAT'S NOT THE MISSION OF THE CITY.

PLEASE CONSIDER GETTING OUT OF THE COMMERCIAL REAL ESTATE BUSINESS. THANK YOU.

>> THANK YOU, MR. POOR. KYLIE FLICK.

>> HELLO. MY NAME IS KYLIE FLICK AND I WOULD LIKE TO THANK YOU FOR THIS OPPORTUNITY TO SPEAK TO YOU.

I'D LIKE TO BRING ATTENTION A SIMILAR TOPIC TO THOSE AHEAD OF ME, BUT ADDRESSING IT FROM A DIFFERENT PERSPECTIVE REGARDING THE POTHOLES AND COLLISIONS HAPPENING DUE TO THEM AFTER THE WINTER STORMS. I WOULD LIKE TO SPECIFICALLY BRING ATTENTION TO THE BEGINNING OF THE I-I7 TEAM IN ADDITION TO THESE STREETS BROUGHT INTO ATTENTION BEFORE ME.

WELL, THIS MAY NOT NECESSARILY BE A FLAGSTAFF ISSUE AS FAR AS THE I-17 GOES.

AS A STUDENT OF NYU AND A TEMPORARY RESIDENT OF FLAGSTAFF DURING MOST OF THE YEAR, AND DRIVING A VERY SMALL CAR.

ME AND MY ROOMMATE HAVE ALSO ALMOST GOTTEN IT INTO MULTIPLE CAR ACCIDENTS DUE TO IT AND THE DAMAGE AND POSSIBLE DAMAGE TO HER CAR.

THIS IS A VERY DANGEROUS EXPERIENCE FOR US AND PROBLEM.

WITH MY RESEARCH, NOT ONLY WHAT WE'RE PAVEMENT OVERLAYS, SEALANT AND OR ARE STRONGER AND MORE RESILIENT SOLUTION HELP US DRIVE DOWN ARIZONA, BE MUCH SAFER FOR STUDENTS IN SMALL CARS FROM DAMAGING THEIR CARS AND, OR GETTING INTO ACCIDENTS.

BUT IT ALSO IS IMPORTANT TO BRING UP HOW MANY STUDENTS ARE NEWER DRIVERS AND MAY NOT BE ABLE TO GO OVER THESE POTHOLES AS EASILY AS SOME OTHER PEOPLE.

I URGE THE COUNCIL TO BRING THE POTHOLES TO ATTENTION OF THOSE WHO CAN HELP PROVIDE A MORE SUSTAINABLE AND PERMANENT SOLUTION TO OUR WEATHER BOUND STREETS. THANK YOU FOR YOUR TIME.

>> THANK YOU. THAT IS ALL I HAVE AND THERE'S NOBODY ONLINE FOR PUBLIC PARTICIPATION.

>> MAYOR, THERE IS NOT.

>> THANK YOU. WE WILL MOVE DOWN TO PROCLAMATIONS, IF COUNCIL COULD JOIN ME DOWN AT THE FRONT.

[BACKGROUND] FOR THE FIRST PROCLAMATION.

>> [INAUDIBLE]

>> DO WE HAVE MEMBERS OF THE CODA COMMISSION HERE FOR THIS PROCLAMATION? COME ON DOWN.

>> JOIN US.

>> THANK YOU.

>> IT'S MY HONOR TO READ THIS PROCLAMATION.

THE CITY OF FLAGSTAFF IS PROUD TO JOIN

[A. Proclamation: Asian American and Native Hawaiian/Pacific Islander Heritage Month]

THE DEPARTMENT OF COMMERCE AND OUR NATION AND RECOGNIZING MAY AS THE ASIAN-AMERICAN AND NATIVE HAWAIIAN PACIFIC ISLANDER HERITAGE MONTH, ALSO KNOWN AS ASIAN-AMERICAN PACIFIC ISLANDER HERITAGE MONTH.

DURING THIS HERITAGE MONTH, WE REFLECT UPON AND CELEBRATE THE REMARKABLE ROLE OF THE AANHPI COMMUNITY IN OUR NATION'S HISTORY.

THE CITY OF FLAGSTAFF ALSO HONORS THE RICH CULTURAL TRADITIONS AND PROUD ANCESTRY OF AANHPI COMMUNITY FOR THE STRENGTHS AND DIVERSIFICATION OF OUR COMMUNITY.

THE 2023 THEME, ADVANCING LEADERS THROUGH OPPORTUNITY, IS A CONTINUATION OF THE ADVANCING LEADERS THEME SERIES, WHICH STARTED IN 2021.

THE AANHPI COMMUNITY HAS PLAYED A SIGNIFICANT ROLE IN FLAGSTAFF EXPLORING OPPORTUNITIES AND IS MADE UP OF CULTURALLY AND LINGUISTICALLY DIVERSE PEOPLE REPRESENTING POPULATIONS FROM MANY COUNTRIES AND ISLANDS.

THE MONTH OF MAY WAS CHOSEN TO OBSERVE AANHPI HERITAGE MONTH TO COMMEMORATE THE FIRST JAPANESE PERSONS WHO CAME TO THE COUNTRY IN MAY OF 1843 AND TO MARK THE MAY 1869 COMPLETION OF THE TRANSCONTINENTAL RAILROAD, WHICH INVOLVED THE LABOR OF MANY CHINESE IMMIGRANTS.

SO TOO THE CITY OF FLAGSTAFF'S FOUNDATION WAS DEVELOPED BY THE CONTRIBUTION OF THE AANHPI COMMUNITY WHO ADVANCED THROUGH STRATEGIC LEADERSHIP, INNOVATION, CRITICAL THINKING, AND CREATING EFFECTIVE TEAMWORK AND SERVICE TO OUR COMMUNITY.

THIS ADVANCEMENT OF OPPORTUNITY IS STILL SUPPORTED BY THEIR CARING NEIGHBORHOODS, RICH CULTURE, AND FAMILY-OWNED BUSINESSES.

[00:35:02]

THE CITY OF FLAGSTAFF REFLECTS ON THE HISTORICAL STIGMA SURROUNDING THE AANHPI COMMUNITY AND FOCUSES ON CHANGE THROUGH EMBRACING DIVERSITY, EQUITY, AND INCLUSION TO REDUCE THE BARRIERS TO PROFESSIONAL PROGRESSION IN OUR COMMUNITY.

AS WE FROWN ON THE HATE CRIMES AGAINST THE AANHPI COMMUNITY DURING THE PANDEMIC, THE CITY OF FLAGSTAFF CONTINUES TO ENGAGE IN COUNTER-DISCRIMINATION AND FOCUSES ON PUBLIC SAFETY AND EDUCATION TO RAISE AWARENESS AND INCREASE EMOTIONAL INTELLIGENCE AMONG MANY.

THE AANHPI COMMUNITY PLAYS AN INTEGRAL ROLE IN THE SHAPING, DEVELOPING, AND CREATION OF THE FUTURE OF ALL SECTORS OF OUR CITY.

THEREFORE, THROUGH THE AANHPI HERITAGE MONTH, THE NARRATIVES AND ROLES OF THE AANHPI COMMUNITY WILL BE HEARD, SHARED, AND VALUED IN OUR CITY, AMERICAN HISTORY, LITERATURE, AND EDUCATION.

THE FLAGSTAFF CITY COUNCIL ESTABLISHED THE COMMISSION ON DIVERSITY AWARENESS TO ADVISE THE CITY COUNCIL ON ISSUES AND METHODS IN PROMOTING DIVERSITY AWARENESS WITHIN THE CITY OF FLAGSTAFF AND IN FULFILLING THAT CHARGE.

THE COMMISSION ON DIVERSITY AWARENESS SUPPORTS THE DESIGNATION OF MAY 2023 AS ASIAN-AMERICAN AND NATIVE HAWAIIAN PACIFIC ISLANDER HERITAGE MONTH IN UNISON WITH NATIONAL AND STATEWIDE OBSERVANCES.

THEREFORE I, KHARA HOUSE, ON BEHALF OF BECKY DAGGETT, MAYOR OF THE CITY OF FLAGSTAFF, DO PROCLAIM MAY 2023 AS ASIAN-AMERICAN AND NATIVE HAWAIIAN PACIFIC ISLANDER HERITAGE MONTH IN THE CITY OF FLAGSTAFF.

[APPLAUSE].

>> LETS GRAB A PHOTO.

>> ONE, TWO, THREE.

ONE MORE. ONE, TWO, THREE. PERFECT.

>> YOU'RE SURE YOU DON'T WANT TO SAY ANYTHING.

>> NO, THANKS.

[BACKGROUND]

>> [NOISE] CAN I HAVE THE FLAGSTAFF BIKING ORGANIZATION COME UP AND ANYONE WHO WANTS TO RECEIVE THIS? [LAUGHTER] I'LL BE READING THE PROCLAMATION FOR BIKE MONTH IN FLAGSTAFF.

[B. Proclamation: Bike Month]

BICYCLING REPRESENTS ONE OF THE MOST ENVIRONMENTALLY RESPONSIBLE, CLEAN, EFFICIENT, ECONOMIC, AND HEALTHY FORMS OF TRANSPORTATION.

THE CITY OF FLAGSTAFF AND FLAGSTAFF BIKING ORGANIZATION RECOGNIZE THE IMPORTANCE OF A BICYCLE-FRIENDLY COMMUNITY.

BIKE MONTH RAISES PUBLIC AWARENESS ABOUT THE NEED TO IMPROVE BICYCLE INFRASTRUCTURE IN THE COMMUNITY, TO ENCOURAGE MORE PEOPLE TO COMMUTE BY BICYCLE.

BICYCLING IMPROVES AIR QUALITY, REDUCES GREENHOUSE GAS EMISSIONS, AND SUPPORTS FLAGSTAFF'S CARBON NEUTRALITY GOALS.

BICYCLING ENHANCES MOBILITY AND HELPS MANAGE TRAFFIC CONGESTION.

BICYCLING IS AN EXCELLENT LOW-IMPACT AEROBIC ACTIVITY THAT IMPROVES HEALTH AND REDUCES STRESS.

RIDING A BICYCLE HELPS ALL OF US CONNECT TO OUR COMMUNITY AND FEEL A SENSE OF PLACE.

NOW, THEREFORE, I COUNCIL MEMBER MIRANDA SWEET, IN LIEU OF MAYOR BECKY DAGGETT, DO HEREBY PROCLAIM MAY 2023 AS BIKE MONTH IN FLAGSTAFF.

[APPLAUSE] [BACKGROUND]

>> ONE, TWO, THREE. ONE MORE FOR GOOD MEASURE. ONE, TWO, THREE. PERFECT.

>> [BACKGROUND] I'LL BE REALLY QUICK. I JUST WANT TO ENCOURAGE EVERYBODY TO TAKE THE BICYCLING CHALLENGE IN [INAUDIBLE] IT RIDES THROUGH THE FLAGSTAFFBIKING.ORG WEBSITE.

IF YOU GO TO FLAGSTAFFBIKING.ORG, YOU'LL SEE OUR WHOLE LIST OF EVENTS THIS MONTH, AND WE HAVE A LOT GOING ON.

IT'S GOING TO BE A LOT OF FUN, SO PLEASE PARTAKE, GET INVOLVED AND RIDE YOUR BIKE.

THANK YOU. [APPLAUSE]

>> DO WE HAVE A MUNICIPAL CLERK OR TWO WHO WOULD LIKE TO COME DOWN? [APPLAUSE]

[00:40:08]

THIS IS THE 54TH ANNUAL PROFESSIONAL MUNICIPAL CLERKS WEEK PROCLAMATION.

[C. Proclamation: Municipal Clerk Week]

THE MUNICIPAL CLERK IS A TIME-HONORED AND VITAL PART OF LOCAL GOVERNMENT THAT EXISTS THROUGHOUT THE WORLD.

THE MUNICIPAL CLERK POSITION IS THE OLDEST AMONG PUBLIC SERVANTS.

MUNICIPAL CLERKS PROVIDE THE PROFESSIONAL LINK BETWEEN THE CITIZENS, THE LOCAL GOVERNING BODIES, AND AGENCIES OF GOVERNMENT AT OTHER LEVELS.

MUNICIPAL CLERKS HAVE PLEDGED TO BE EVER MINDFUL OF THEIR NEUTRALITY AND IMPARTIALITY, RENDERING EQUAL SERVICE TO ALL.

MUNICIPAL CLERKS SERVE AS THE INFORMATION CENTER ON FUNCTIONS OF LOCAL GOVERNMENT AND COMMUNITY.

MUNICIPAL CLERKS CONTINUALLY STRIVE TO IMPROVE THE ADMINISTRATION OF PUBLIC DUTIES THROUGH PARTICIPATION AND EDUCATION PROGRAMS, SEMINARS, WORKSHOPS, AND THE ANNUAL MEETINGS OF THEIR STATE, PROVINCIAL, COUNTY, AND INTERNATIONAL PROFESSIONAL ORGANIZATIONS.

IT IS MOST APPROPRIATE THAT WE RECOGNIZE THE ACCOMPLISHMENTS OF MUNICIPAL CLERKS.

NOW, THEREFORE, I BECKY DAGGETT, MAYOR OF FLAGSTAFF, ARIZONA, DO RECOGNIZE THE WEEK OF APRIL 30TH THROUGH MAY 6, 2023, AS MUNICIPAL CLERKS WEEK, AND FURTHER EXTEND APPRECIATION TO OUR OWN CITY CLERK TEAM FOR THE VITAL SERVICES THEY PERFORM AND THEIR EXEMPLARY DEDICATION TO THE CITY OF FLAGSTAFF.

[APPLAUSE] [BACKGROUND].

>> ONE, TWO, THREE. ONE MORE. ONE, TWO, THREE. PERFECT.

>> WOULD YOU LIKE TO SAY SOMETHING?

>> SURE. I JUST WOULD LIKE TO THANK THE MAYOR AND COUNCIL FOR THIS RECOGNITION.

I WOULD JUST LIKE TO SAY THAT THE CITY OF FLAGSTAFF IS BLESSED TO HAVE A FANTASTIC TEAM OF MUNICIPAL CLERKS, AND I'M APPRECIATIVE OF ALL THE WORK THAT THEY DO TO FURTHER OUR CITY.

THANK YOU.

[APPLAUSE] [BACKGROUND] MOVING DOWN TO ITEM NUMBER 7, COUNCIL LIAISON REPORTS.

[7. COUNCIL LIAISON REPORTS]

LET'S START DOWN HERE WITH COUNCIL MEMBER HOUSE.

JUST ONE THIS WEEK.

THE HOUSING COMMISSION CANCELED IN DEFERENCE TO OUR BUDGET MEETINGS LAST WEEK.

BUT CODA WAS ABLE TO MEET.

I THINK THAT SAME WEEK OR THE WEEK BEFORE AND ENGAGED IN A LOT OF GREAT CONVERSATIONS ABOUT THE APPROVAL OF THE AAA AND HPI HERITAGE MONTH PROCLAMATION.

BUT THEY ALSO ARE WORKING ON CONTINUED EFFORTS FOR WOMEN'S EQUITY AND CONCERNS WITH HOUSING DISCRIMINATION.

THEY WERE ALSO ENGAGING IN WITH VARIOUS COMMUNITY LEADERS AND GROUPS THAT ARE CONTINUING THE CONVERSATION REGARDING CELEBRATORY FLAGS FOR THE CITY OF FLAGSTAFF AND ENHANCING THE CITY'S ENGAGEMENT WITH OUR RICH RANGE OF DIVERSE COMMUNITIES. THAT'S ALL FOR ME.

THANK YOU. COUNCIL MEMBER SUITE.

I HAVE NOTHING TONIGHT. THANK YOU.

COUNCIL MEMBER MATTHEWS.

HE HAD TO HOP OFF THE CALL.

VICE MAYOR.

SURE. I DO HAVE A COUPLE OF UPDATES THIS WEEK.

LAST WEEK, DURING OUR ONE OF OUR COUNCIL MEETINGS.

THE TOURISM COMMISSION MET, SO I WASN'T ABLE TO JOIN THEM, BUT I DID GET AN UPDATE FROM OUR TEAM.

THERE WAS TALK ABOUT THE FIRST FRIDAY, ART WALKS, BLUES AND Q'S TICKETS ARE SELLING OUT FAST.

I WANTED TO MENTION THAT THERE WERE PRESENTATIONS ABOUT AIRPORT STAFF, ALL THINGS AIRPORT.

JULIE SCHULKLE WITH CREATIVE LIKE STEPS ART X FESTIVAL, AND REGULAR UPDATES FROM FROM LOWELL ON ATTRACTIONS AND THEN AROUND FLAGSTAFF.

FOR THE MONTH OF MARCH, 2023, THE ATTRACTIONS WERE TRENDING STRONGLY AND SIMILARLY TO MARCH 2022, AND OBVIOUSLY THE BIG INCREASE WAS WITH SNOWBALL SKI RESORT THIS YEAR.

I WANTED TO MAKE A SHOUT OUT, I BELIEVE TODAY'S THE LAST DAY TO REGISTER FOR NATIONAL ECOTOURISM WEEK SERVICE DAY, WHICH WILL BE ON MAY 10TH.

WE CAN GET YOU A LINK FOR THAT IF YOU'RE INTERESTED.

[00:45:04]

BE SURE TO JUST APPROACH ONE OF US AND FOLLOW UP ABOUT THAT.

FRIDAY, AGAIN, WE WERE IN A BUDGET RETREAT, SO I WASN'T ABLE TO ATTEND THE COCONINO PLATEAU WATER ADVISORY COUNCIL MEETING.

I'M THE CHAIR OF THAT GROUP, BUT MY CO-CHAIR, PETER FURMAN, WHO'S THE CITY COUNCIL MEMBER IN THE CITY OF SEDONA, WAS ABLE TO TAKE ON THAT MEETING.

WE'VE BEEN IN DISCUSSIONS ABOUT A STRATEGIC RETREAT.

IT'S BEEN A FEW YEARS SINCE WE'VE HAD THOSE DEEP SPIRITUAL CONVERSATIONS ABOUT WHO WE ARE AND WHERE WE'RE GOING AND HOW WE WANT TO BEST REPRESENT THE COMMUNITY AND UTILIZE OUR BUDGETARY APPARATUS.

PETE IS A REALLY INTERESTING GUY BY THE WAY, HE USED TO BE THE CITY MANAGER FOR SAN JOSE, CALIFORNIA.

NOW HE'S THE CITY COUNCIL PERSON IN SEDONA.

HE WAS ALMOST AN ASTRONAUT TOO, SO A FABULOUS GUY TO GET TO KNOW.

I WENT ON A RIDE ALONG WITH PAUL MOOD, FLAG STUFFS, NEW CITY ENGINEER.

IT WAS A REALLY NICE OPPORTUNITY AND A PRIVILEGE TO GET TO SHOW HIM ALL OF MY FAVORITE POTHOLES.

[LAUGHTER] WE TALKED A LOT ABOUT A LOT OF THE CAPITAL PROJECTS COMING UP, A LOT OF NEW DEVELOPMENT HAPPENING.

I WAS ABLE TO SHARE WITH HIM SOME OF THE BLIND SPOTS HE STILL HAS AS A NEW EMPLOYEE HERE WITH THE CITY.

HE WAS ABLE TO SHARE WITH ME PLENTY OF UPDATES ABOUT THE PROJECTS THAT ARE ONGOING INCLUDING THAT MILTON BEULAH ROUNDABOUT THAT'S GOING IN, THE SUBSIDENCE ISSUES THAT ARE GOING ON IN YOUR STATION FIVE ON THE 180, THE ROUNDABOUT THAT'S GOING IN ON CEDAR AND LOCK IT NEXT TO MEMS. LOTS OF REALLY GOOD CONVERSATIONS AND ON THE GROUND, OPPORTUNITIES TO GET TO KNOW THINGS.

I'M ALMOST DONE HERE.

ONE OTHER THING I WANTED TO MENTION IS LATER THIS WEEK I'LL BE MEETING WITH A VERY ECLECTIC GROUP ABOUT A TRIP TO ALBUQUERQUE THAT I'LL BE JOINING IN EARLY JUNE WHERE WE ARE GOING TO PRESENT AS THE CITY OF FLAGSTAFF LOA OBSERVATORY, THE US NATIONAL NAVAL OBSERVATORY, ON OUR DARK SKY LIGHTING SUCCESSES TO THE INTERNATIONAL ASTRONOMICAL ASSOCIATION IN ALBUQUERQUE.

IT'S A REALLY NEAT OPPORTUNITY TO HAVE A MEETING WITHIN A MEETING AND REALLY SPREAD OUR KNOWLEDGE AND OUR EXPERIENCES AND SELL OUR IDEAS ABOUT DARK SKIES AND HOW TO APPROPRIATELY DO THAT AND WHAT IT MEANS FOR LOCAL ECONOMIES AND NIGHTTIME STAR GAZING AROUND THE COUNTRY.

VERY MUCH LOOKING FORWARD TO THAT. I'LL LEAVE IT THERE.

THANK YOU. VICE MAYOR, COUNCIL MEMBER HARRIS.

NOTHING AT THIS TIME.

THANK YOU. COUNCIL MEMBER MATTHEWS.

I'M GOING TO PASS MY NON TILL NEXT WEEK BECAUSE I KNOW WE'RE GOING TO HAVE A BUSY REST OF THE AFTERNOON.

NOTHING FROM ME.

LET'S MOVE ON TO APPOINTMENTS.

ONCE AGAIN, THE NOTICE THAT THE CITY COUNCIL CAN GO INTO EXECUTIVE SESSION, WHICH WILL NOT BE OPEN TO THE PUBLIC FOR THE PURPOSE OF DISCUSSING OR CONSIDERING EMPLOYMENT, ASSIGNMENT, APPOINTMENT, PROMOTION, DEMOTION, DISMISSAL, SALARIES, DISCIPLINING, OR RESIGNATION OF A PUBLIC OFFICER, APPOINTEE, OR EMPLOYEE OF ANY BODY.

ITEM 8A, THIS IS FOR THE OPEN SPACES COMMISSION,

[A. Consideration of Appointments: Open Spaces Commission. STAFF RECOMMENDED ACTION: Make three appointments to terms expiring April 2026.]

AND I BELIEVE THAT COUNCIL MEMBER SWEET HAS THE FIRST APPOINTMENT.

THANK YOU, MAYOR. THANK YOU TO EVERYONE THAT DID SHOW INTEREST IN THIS COMMISSION, A LOT OF GREAT APPLICANTS.

IT WAS A TOUGH CALL, BUT I WOULD LIKE TO MOVE TO A POINT NOW, WHITE TO A TERM EXPIRING APRIL 2026.

I'LL SECOND.

ANY DISCUSSION? ALL THOSE IN FAVOR? AYE.

AYE.

ANY OPPOSED? WELCOME BACK, NAT. COUNCIL MEMBER MATTHEWS.

THANK YOU, MAYOR. I AGREE WITH COUNCIL MEMBERS SWEET.

THIS WAS A GREAT LIST OF APPLICANTS AND WE REALLY APPRECIATE THE COMMUNITY INTEREST AND IT WAS A HARD FIELD TO DETERMINE, BUT I AM WANTING TO NOMINATE JACQUELINE THOMAS TOO, AND I DON'T KNOW THE TERM, BUT TO FILL THAT SEAT.

TO A TERM EXPIRING APRIL 2026 ON THE OPEN SPACES COMMISSION.

OKAY.

IS THAT GOOD ENOUGH, CITY ATTORNEY? DO I HAVE A SECOND? SECOND.

ANY DISCUSSION? ALL THOSE IN FAVOR? AYE.

AYE. ANY OPPOSED?

[00:50:01]

I HAVE THE THIRD APPOINTMENT, AND I WOULD LIKE TO APPOINT BRUCE FOX TO A TERM ON THE OPEN SPACES COMMISSION EXPIRING APRIL 2026.

CAN I GET A SECOND? I'LL SECOND.

ANY DISCUSSION? ALL THOSE IN FAVOR? [OVERLAPPING] AYE.

ANY OPPOSED? THANK YOU VERY MUCH.

WELCOME TO THESE THREE MEMBERS.

NEXT IS 8B,

[B. Consideration of Appointments: Northern Arizona Intergovernmental Public Transportation Authority (NAIPTA) Transit Advisory Committee (TAC) Citizen Representative Alternate. STAFF RECOMMENDED ACTION: Make one appointment to a term expiring May 2026.]

NORTHERN ARIZONA INTERGOVERNMENTAL PUBLIC TRANSPORTATION AUTHORITY, WHICH IS NAPTA, TRANSIT ADVISORY COMMITTEE, CITY REPRESENTATIVE, ALTERNATE.

I WOULD LIKE TO NOMINATE CARLTON JOHNSON TO A TERM EXPIRING MAY 2026.

I'LL SECOND.

THANK YOU. ANY DISCUSSION? ALL THOSE IN FAVOR? AYE.

ANY OPPOSED? WE ARE MOVING DOWN.

[9. CONSENT ITEMS All matters under Consent Agenda are considered by the City Council to be routine and will be enacted by one motion approving the recommendations listed on the agenda. Unless otherwise indicated, expenditures approved by Council are budgeted items.]

ITEM NUMBER 9 ARE CONSENT ITEMS. ALL MATTERS UNDER CONSENT AGENDA ARE CONSIDERED BY THE CITY COUNCIL TO BE ROUTINE AND WILL BE ENACTED BY ONE MOTION APPROVING THE RECOMMENDATIONS LISTED ON THE AGENDA.

UNLESS OTHERWISE INDICATED, EXPENDITURES APPROVED BY COUNCIL, OUR BUDGETED ITEMS. WE HAVE ITEM A, B, AND C. DOES ANYONE ON COUNCIL WANT TO PULL OUT ANY OF THESE ITEMS? I WILL TAKE A MOTION.

MOVE TO APPROVE THE CONTINGENT.

DO WE HAVE A SECOND? I WILL SECOND.

THANK YOU. ANY DISCUSSION? ALL THOSE IN FAVOR? AYE.

AYE.

ANY OPPOSED? WE HAVE MOVED ONTO ROUTINE ITEMS. ITEM NUMBER 10A CONSIDERATION AND APPROVAL OF

[A. Consideration and Approval of Contract: Approval of First Amendment for GMP 2 for Construction Phase I Maintenance Repair Services with Hunter Contracting Co. for a Guaranteed Maximum Price (GMP) in the amount of $3,220.380.87 for the Inner Basin Waterline Restoration Project. STAFF RECOMMENDED ACTION: Approve First Amendment 1 for GMP 2 for Construction Phase I Maintenance Repair Services with Hunter Contracting Co. for a GMP of $3,220,380.87 and a contract duration of 130-calendar days for a total Agreement amount of $3,410,074.87; and Authorize the City Manager to execute the necessary documents.]

CONTRACT APPROVAL OF FIRST AMENDMENT FOR GMP TO FOR CONSTRUCTION PHASE ONE, MAINTENANCE REPAIR SERVICES WITH HUNTER CONTRACTING COMPANY FOR A GUARANTEED MAXIMUM PRICE IN THE AMOUNT OF $3,220,380.87 FOR THE INNER BASIN WATERLINE RESTORATION PROJECT.

MAYOR, VICE MAYOR, MEMBERS OF COUNCIL, DAVID PETERSON, CAPITAL IMPROVEMENT PROJECT MANAGER.

HERE TONIGHT WITH A REALLY BRIEF PRESENTATION ON GM P2 FOR THE INNER BASIN WATERLINE PROJECT.

FIRM. THOSE TWO TOGETHER ARE DESIGN BUILD TEAM AND THEN MEMBERS OF THEIR COCONINO COUNTY AND THEN MYRIAD OF CITY STAFF AS WELL.

SPOILER ALERT, THIS IS PROBABLY THE MOST EXCITING SLIDE IN THE ENTIRE PRESENTATION.

I WANTED TO SHARE, AND UNFORTUNATELY, STACY BK IS ON A MUCH DESERVED VACATION THIS WEEK.

SHE WOULD HAVE BEEN THRILLED TO BE HERE AS SHE WAS INSTRUMENTAL IN GETTING THIS FUNDED.

DO CONGRATULATE HER IF YOU SEE HER IN PASSING.

BUT THE ARIZONA DEPARTMENT OF FORESTRY AND FIRE MANAGEMENT AS 100% FUNDED THIS PROJECT.

IT ISN'T A REIMBURSABLE NATURE, SO IS FRONT PAID BY WATER SERVICES ACCOUNT AND THEN REIMBURSED BY DFFM AND IT'S TO NOT TO EXCEED A $16.1 MILLION VALUE.

THAT VALUE CAME FROM THE 30% DESIGN ENGINEER ESTIMATE.

THAT WAS THE DESIGN-BUILD TEAM THAT WAS USED FOR THE CONSTRUCTION POST THE SCHULZ FIRE.

THEY HAVE A VERY GOOD UNDERSTANDING OF WHAT THEY'RE DEALING WITH UP THERE AND THAT'S WHERE THAT NUMBER CAME FROM IF YOU'RE CURIOUS.

IN THE DETAILS OF GMP-2, WE HAVE A CONTRACT AMOUNT OF THE LITTLE OVER $3.22 MILLION AND IF PERIOD OF ABOUT 130 CALENDAR DAYS FOR THE WORK TO TAKE PLACE.

THE SCOPE OF WORK FOR THIS IS

[00:55:01]

A 90% DESIGN EFFORT AND THEN BEGINNING THE MAINTENANCE REPAIR.

I WANT TO DIFFERENTIATE HERE THAT THERE'S MAINTENANCE CONSTRUCTION AND THEN THERE'S RESTORATION CONSTRUCTION.

THE MAINTENANCE CONSTRUCTION CAN TAKE PLACE UNDER OUR ROAD USE PERMIT THAT'S CURRENTLY IN PLACE WITH THE FOREST SERVICE.

BUT THE RESTORATION CONSTRUCTION IS WHAT WE'RE WORKING ON WITH THE FOREST SERVICE NOW TO GET A DECISION MEMO, TO HAVE THE CLEARANCES, TO GO UP THERE TO INSTALL A NEW INFRASTRUCTURE.

THAT NEW INFRASTRUCTURE CONSTRUCTION WILL COME AS PART AS GMP-3, WHICH I'LL TOUCH ON HERE IN A COUPLE OF SLIDES BUT I WANTED TO DIFFERENTIATE THE TWO THAT WE HAVE THE AUTHORIZATION NOW, HOPEFULLY WITH THIS GMP TO GET UP THERE, MAINTAIN THE ROAD, GET ACCESS FOR PASSIVE ACCESS FOR EQUIPMENT, AND THEN HOPEFULLY IT'D BE ABLE TO CONNECT OUR WATER LINE THAT HAS AN ROBUST SNOWPACK THIS YEAR.

WE'D LIKE TO START CONVEYING THAT WATER BACK TO TOWN.

IN PART OF THAT ALSO IS A COUPLE OF SUB CONSULTANTS HERE WE HAVE ERROR CHECK MAPPING, WHICH WILL COME IN FOR A VISIBLE SPECTRUM IMAGERY AS WELL AS LIDAR IMAGERY AND THEN WE HAVE TO GROUND TRUTH THAT WITH SURVEYING SERVICES, THAT'S PART OF THAT AS WELL.

THEN WE ALSO HAVE IN VIRAL SYSTEMS THAT'S COME ALONG TO THE TEAM TO HELP US GAIN THE CULTURAL AND ENVIRONMENTAL CLEARANCES THAT WE NEED FOR APPROVAL THROUGH THE FOREST SERVICE.

THEN IT JUST WANTED TO GIVE THE COUNCIL A HEADS UP THAT WE'LL BE BACK AGAIN ON 3RD JULY WITH TWO MORE CONTRACTS.

WE'LL BE ASKING FOR GMP-3 AT THAT TIME, AS WELL AS THE INSPECTION SERVICES CONTRACT.

BOTH OF THOSE ITEMS WILL BECOME IN BEFORE YOU IN THE BEGINNING OF JULY, THE INSPECTION SERVICES CONTRACT BECAUSE WE DON'T HAVE THE CAPACITY AT THE CITY WITH ALL THE PROJECTS GOING ON TO HAVE A FULL TIME PERSON UP THERE INSPECTING THE MATERIALS THAT ARE GOING IN THE GROUND, MAKING SURE THAT THE PROCESS OF THAT MATERIAL GOING IN THE GROUND IS COPACETIC.

WHAT WE HAVE TO DO IS WE HAVE TO OUTSOURCE THAT TO A CONSULTANT.

THAT CONSULTANT IS BEING SELECTED BY A STATEMENT OF QUALIFICATION COMMITTEE THAT WILL BE REVIEWED AND WE'LL HAVE THAT FINAL NUMBER FOR COUNSEL ON JULY 3RD.

REMEMBER THIS SLIDE FROM A PRESENTATION BACK IN JANUARY, WE WENT THROUGH THE GOOD, THE BAD AND THE UGLY FROM THE INSIGHTS THAT WERE VERY MINIMALLY IMPACTED TO THIS ONE THAT IS THE WORST IMPACTED.

I JUST WANTED TWO SLIDES AFTER THIS, WE'LL DEAL WITH THIS SITE PARTICULAR.

I JUST WANTED TO CONJURE UP MEMORIES OF THIS, THIS SIDE AS I GO FORWARD, I'M STANDING IN THAT YELLOW CIRCLE TO GIVE YOU A LITTLE IDEA OF THE SCALE OF THIS EROSION CHANNEL AND ON THE RIGHT SIDE YOU CAN SEE ONE OF THE TWO SPOTS THAT WE KNOW OF AS OF LAST SEPTEMBER WHERE THE WATERLINE IS BROKEN.

AGAIN, THAT WATER THAT'S COMING OUT OF THAT IS COLLECTED FROM SPRING BOXES UP THERE THAT IS NOT WELL WATERED, THAT'S BEING PUMPED, THAT WAS SHUT OFF WHEN WE KNEW THE SYSTEM WAS COMPROMISED.

AGAIN, THE IMAGES HERE WE HAVE A LITTLE BIT MORE DIMENSION IN HERE.

WE'RE LOOKING AT ABOUT A 50 FOOT WIDE CHANNEL, 25 FOOT DEEP.

BUT I THINK THE IMAGES THAT ARE MOST IMPRESSIVE ON THIS SLIDE ARE THE BOTTOM LEFT.

YOU CAN SEE PRE AND POST PIPELINE FIRE AND ON THE LEFT SIDE IT'S A LITTLE GRAINY, BUT YOU CAN SEE THAT THE ROAD ALIGNMENT IS THERE, BUT THERE'S NO CHANNEL.

ON THE RIGHT SIDE THAT'S THAT IN SIZE CHANNEL TAKEN FROM AERIAL IMAGERY.

ONE OF THE THINGS THAT OUR DESIGN ENGINEER WORKS ON AS THEY LOOK AT WHAT INFRASTRUCTURE IS NEEDED AT DIFFERENT POINTS IS THEY HAVE TO DO SOME HYDROLOGICAL MODELING.

IN THAT CASE, THEY HAVE TO APPLY A CERTAIN AMOUNT OF WATER.

IN THIS CASE IT'S A 50 YEAR STORM EVENT.

THEY DRAPE THAT OVER THE WATERSHED THAT DRAINS INTO POINT I AND THEN WE'VE ZOOMED IN ON THE RIGHT SIDE OF THIS SLIDE.

THE HOTTER COLOR TEMPERATURES ON THIS EARTH, HOTTER COLOR PIXELS ON THIS IMAGE ARE MORE FLOW.

THE MODEL FLOW AT THIS POINT IS ABOUT 627 CUBIC FEET PER SECOND.

IT'S PROBABLY EASIER TO VISUALIZE 4,700 GALLONS OF WATER PER SECOND GOING BY AT THIS POINT.

THAT HAS A TREMENDOUS AMOUNT OF ENERGY AND POWER.

THAT'S WHY WE SEE THAT BIG INCISED CANYON.

KNOWING THIS, THEY CAN GO TO THEIR ENGINEERING TEAM AND THEY CAN COME UP WITH A DESIGN THAT ALLOWS THEM TO ANCHOR IN PLACE THAT INFRASTRUCTURE SO THERE'S THE WATERLINE AND THE ROADWAY DOESN'T BECOME COMPROMISED.

WANT TO SHOW THAT THIS IS CONCEPTUAL.

ALL THE DESIGN TO DATE AND IN ONE OF THE REASONS WE'RE DOING IT THROUGH 90% DESIGN WITH THIS GMP IS THAT OUR FIELD VISITS ARE SCHEDULED FOR THE END OF MAY TO GO UP THERE.

WE HAVEN'T HAD BOOTS ON THE GROUND, A SURVEY OR ASSESS THESE SITES YET BECAUSE WE HAVEN'T HAD ACCESS DUE TO OUR SNOWPACK.

WHEN WE ARE ABLE TO GET UP THERE, WE CAN CONFIRM THAT THESE DESIGNS ARE SUITABLE FOR EACH OF THESE 45 POINTS GOING FORWARD.

BUT RIGHT NOW THE CONCEPTUAL DESIGN THAT WE HAVE IS WHAT'S SHOWN ON THE SCREEN HERE.

AS WE KNOW RIGHT NOW, THERE'LL BE TWO LOCATIONS WHERE WE'RE RELOCATING THE ROAD AND BECAUSE THE UPHILL SIDE OR THE LEFT SIDE OF THIS IMAGE IS UPHILL IT'S THE KACHINA PEAKS WILDERNESS BOUNDARY, WHICH LITERALLY TAKES AN ACT OF CONGRESS TO DO ANY WORK INSIDE OF.

WE'RE SHIFTING THE ROAD DOWNHILL BECAUSE WE HAVE ALMOST APPROVAL THROUGH THE FOREST SERVICE ONCE THE PERMITTING PROCESS IS DONE TO SHIFT THAT ROAD SO WE DON'T COMPROMISE OR HAVE TO DO INFRASTRUCTURE WITHIN THE WILDERNESS BOUNDARY,

[01:00:02]

WHICH WE'RE NOT ALLOWED TO DO.

BY SHIFTING THAT ROAD DOWN, WE CAN ARMOR THAT.

WE CAN ALSO CREATE A PLACE FOR THE ENERGY TO DISSIPATE AND SPREAD OUT IN THE WATER AS WELL AS THE DEBRIS AND THEN WE ALSO HAVE SPLASH PAD OR AN APRON HERE, THIS BIG CONCRETE SLAB ON THE BOTTOM AND WHAT THAT DOES IS IT HELPS TO DISSIPATE THE WATER SO THAT THERE'S NO UNDERMINE OR HEAD CUTTING BACK UNDER THE INFRASTRUCTURE SO THAT WE'RE BACK HAVING THIS CONVERSATION AGAIN AND WHAT WENT WRONG WITH THE DESIGN.

WE APPRECIATE THAT WE HAVE VERY KNOWLEDGEABLE DESIGNERS THAT HAVE DEALT A LOT WITH FLOODING AND NATIONAL PARKS AND OTHER AREAS SIMILAR TO THIS REALLY UNIQUE ENVIRONMENT.

ALONG WITH THAT, WE'RE ALSO GOING TO BACKFILL BETWEEN THE EXISTING ROAD AND THE NEW ROAD.

YOU CAN SEE IN THIS PROFILE UP HERE WE HAVE THIS LONG FLAT AREA.

AGAIN, THIS ISN'T TO PREVENT DEBRIS FROM COMING ACROSS THE ROAD, BUT IT IS CREATING A SYSTEM WHERE IT CAN BE PLOWED, ARE GRADED OFF THE ROAD EASILY AND THE WATER CAN PASS OVER WITHOUT HAVING TO COMPROMISE THE ROAD OR THE WATERLINE.

THAT WAS A LOT OF INFO, BUT I'M HAPPY TO ANSWER ANY QUESTIONS OR COMMENTS YOU HAVE REGARDING THE PROJECT. THANK YOU FOR YOUR TIME.

>> THANK YOU. ANY COMMENTS OR QUESTIONS FROM COUNCIL? COUNCIL MEMBER MATTHEWS?

>> THANK YOU, MAYOR. I JUST WANTED TO SAY HOW HAPPY I AM TO SEE THIS MOVING FORWARD BECAUSE THIS WAS SO SHOCKING WHEN WE SAW IT FIRST COME TO US.

I'M VERY RELIEVED TO SEE THAT WE HAVE A PLAN AND WE'RE MOVING FORWARD, SO THANK YOU.

>> THANK YOU.

>> ANY OTHER QUESTIONS? DO WE HAVE A MOTION? COUNCIL MEMBER HOUSE?

>> I MOVE TO APPROVE THE FIRST AMENDMENT FOR GMP-2 FOR CONSTRUCTION PHASE 1 MAINTENANCE REPAIR SERVICES WITH HUNTER CONTRACTING COMPANY FOR A GMP OF $3,220,380.87 AND A CONTRACT DURATION OF 130 CALENDAR DAYS FOR A TOTAL AGREEMENT AMOUNT OF $3,410,074.87, AND AUTHORIZE THE CITY MANAGER TO EXECUTE THE NECESSARY DOCUMENTS.

>> THANK YOU. TO HAVE A SECOND.

>> I'LL SECOND.

>> THANK YOU. ANY DISCUSSION? ALL THOSE IN FAVOR?

>> AYE.

>> AYE.

>> ANY OPPOSED? MOVING ON TO ITEM 11B, CONSIDERATION AND ADOPTION OF RESOLUTION NUMBER 2023-19, A RESOLUTION APPROVING THE CITY OF FLAGSTAFF'S 2023 ANNUAL ACTION PLAN AND AUTHORIZING THE SUBMISSION TO THE US DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT.

>> MAYOR?

>> YES, DID I SKIP?

>> I BELIEVE WE MISSED 11A, ORDINANCE 202305.

>> YES, WE DID.

MY APOLOGIES.

WE ARE DOWN TO ITEM NUMBER 11A,

[A. Consideration and Adoption of Ordinance No. 2023-05: An Ordinance of the City Council of the City of Flagstaff, amending Flagstaff City Code, Title 14 Human Relations, Chapter 14-02 Civil Rights, Section 14-02-001-0006 Complaint Procedures, to allow a verified charge to be filed within one hundred and eighty (180) calendar days after the alleged violation occurred; providing for repeal of conflicting ordinances, severability, authority for clerical corrections, and establishing an effective date. STAFF RECOMMENDED ACTION: At the May 2, 2023 Council Meeting: 1) Read Ordinance No. 2023-05 by title only for the first time 2) City Clerk reads Ordinance No. 2023-05 At the May 16, 2023 Council Meeting: 4) Read Ordinance No. 2023-05 by title only for the final time 5) City Clerk reads Ordinance No. 2023-05 6) Adopt Ordinance No. 2023-05]

CONSIDERATION AND ADOPTION OF ORDINANCE NUMBER 2023-05, AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF FLAGSTAFF, AMENDING THE FLAGSTAFF CITY CODE TITLE 14, HUMAN RELATIONS CHAPTER 14-02 CIVIL RIGHTS SECTION 14-02-001-006, COMPLAINT PROCEDURES TO ALLOW A VERIFIED CHARGE TO BE FILED WITHIN 180 CALENDAR DAYS AFTER THE ALLEGED VIOLATION OCCURRED, PROVIDING FOR REPEAL OF CONFLICTING ORDINANCES, SEPARABILITY, AUTHORITY FOR CLERICAL CORRECTIONS, AND ESTABLISHING AN EFFECTIVE DATE.

>> GOOD AFTERNOON, MAYOR, MEMBERS OF COUNCIL, CHRIS ROTE, MANAGEMENT ANALYST IN PUBLIC AFFAIRS.

THIS IS A PRETTY STRAIGHTFORWARD ORDINANCE.

IT WOULD SIMPLY AMEND THE STATUTE LIMITATIONS OF SOME WANTS TO FILE A CIVIL RIGHTS COMPLAINT.

CURRENTLY IT'S 90 DAYS IN THE CITY OF FLAGSTAFF AND THERE'S NO EXEMPTIONS FOR ANY REASONS.

THIS WOULD AMEND IT TO BE 180 DAYS.

THAT IS BOTH IN LINE WITH STATE AND FEDERAL RULES FOR THEIR COMPLAINT PROCESSES.

THIS DOUBLES THAT PERIOD, PUTS US IN LINE WITH THE STATE AND FEDERAL RULES.

THE OTHER NOTE I HAVE ON THIS FOR A REASON THAT IT WAS RECOMMENDED BY OUR STAFF HERE IS THAT THESE COMPLAINTS THAT WE GET FROM INDIVIDUALS ARE OFTEN VERY EMOTIONALLY CHARGED.

IT'S DIFFICULT TO GET TO THE POINT WHERE THEY WANT TO FILE THESE COMPLAINTS, SO IT CAN TAKE A LITTLE BIT OF TIME TO GET THEMSELVES TOGETHER AND PUBLIC DOCUMENTS HERE THEY WANT, SO GIVE ME ANOTHER 90 DAYS CAN BE BENEFICIAL FOR THAT REASON.

THE OTHER ONE IS THAT IF THERE'S A SITUATION WHERE THERE'S ONGOING INCIDENT SUCH AS UNEMPLOYMENT WHERE A PERSON IS BEING DISCRIMINATED, AGAIN, IT'S NOT A REPEATED BASIS.

OUR ORDINANCE CURRENTLY ONLY ALLOWS THE INSTANCES THAT

[01:05:02]

HAPPENED IN THE LAST 90 DAYS TO BE CONSIDERED.

IF A PERSON IS EXPERIENCING THAT DISCRIMINATION FOR MONTHS AND MONTHS ON END AND THEY COME TO US CURRENTLY, WE GO BACK 90 DAYS AND ANYTHING BEFORE THAT WE CAN'T EVEN LOOK AT.

THIS JUST EXTENDS THAT 180 DAYS.

HAPPY TO TAKE ANY QUESTIONS. I DON'T HAVE A POWERPOINT OR ANYTHING FOR YOU.

IT'S PRETTY SIMPLE.

>> THANK YOU. ANY QUESTIONS OR COMMENTS FROM COUNCIL? IT SHOULD BE NOTED FOR MEMBERS OF THE AUDIENCE THAT WE HEARD THIS ITEM ON MARCH 5 OF THIS YEAR AND ADOPTED THE ORDINANCE.

THIS WAS JUST ONE PART THAT WE WANTED TO COME BACK TO.

I'M LOOKING FOR A MOTION TO READ THE ORDINANCE.

COUNCIL MEMBER MATTHEWS.

>> THANK YOU, MAYOR. I MOVE THAT WE READ ORDINANCE NUMBER 2023-05 BY TITLE ON, ONLY FOR THE FIRST TIME.

>> DO WE HAVE A SECOND?

>> I'LL SECOND.

>> THANK YOU. ANY DISCUSSION? ALL THOSE IN FAVOR?

>> AYE.

>> ANY OPPOSED? CITY CLERK?

>> AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF FLAGSTAFF, AMENDING FLAGSTAFF CITY CODE TITLE 14, HUMAN RELATIONS CHAPTER 14-02 CIVIL RIGHTS, SECTION 14-02-001-0006.

COMPLAINT PROCEDURES, TO ALLOW A VERIFIED CHARGE TO BE FILED WITHIN 180 CALENDAR DAYS AFTER THE ALLEGED VIOLATION OCCURRED, PROVIDING FOR REPEAL OF CONFLICTING ORDINANCES, SEPARABILITY AUTHORITY FOR CLERICAL CORRECTIONS, AND ESTABLISHING AN EFFECTIVE DATE.

>> THANK YOU. NOW WE'RE MOVING DOWN. THANK YOU, CHRIS.

>> THANK YOU.

>> NOW WE'RE MOVING DOWN TO ITEM NUMBER 11B,

[B. Consideration and Adoption of Resolution No. 2023-19: A resolution approving the City of Flagstaff's 2023 Annual Action Plan and authorizing its submission to the U.S. Department of Housing and Urban Development (HUD) STAFF RECOMMENDED ACTION: 1) Read Resolution No. 2023-19 by title only 2) City Clerk reads Resolution No. 2023-19 (if approved above) 3) Adopt Resolution No. 2023-19]

CONSIDERATION AND ADOPTION OF RESOLUTION NUMBER 2023-19, A RESOLUTION APPROVING THE CITY OF FLAGSTAFF 2023 ANNUAL ACTION PLAN AND AUTHORIZING ITS SUBMISSION TO THE US DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT.

>> GOOD AFTERNOON, MAYOR AND COUNCIL.

THANKS FOR HAVING ME TODAY.

I'M HERE TO ASK YOU FOR A RESOLUTION APPROVING THE SUBMISSION OF OUR 2023 COMMUNITY DEVELOPMENT BLOCK GRANT ANNUAL ACTION PLAN TO THE US DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT.

THANKS SO MUCH FOR ALL OF YOUR GREAT FEEDBACK ON THE FUNDING RECOMMENDATIONS WE BROUGHT TO YOU AND PRESENTED DURING THE APRIL 18TH MEETING.

AS A REMINDER, YOU CAN SEE ON YOUR SCREEN HERE THE FINAL ALLOCATIONS THAT WE INTEND TO SUBMIT TO HUD WITH OUR ANNUAL ACTION PLAN.

THAT PLAN IS DUE TO HUD ON MAY 15TH, AND I'M JUST HERE TO ANSWER ANY QUESTIONS YOU MIGHT HAVE ABOUT THIS YEAR'S RECOMMENDED ALLOCATION.

>> THANK YOU. CHRISTINE. ANY QUESTIONS? DID YOU HAVE ANYTHING ELSE, CHRISTINE?

>> NOPE, THAT WAS IT. IF YOU GUYS ARE ABLE TO PASS THAT RESOLUTION FOR US AND WE CAN SUBMIT OUR PLAN.

>> WE'LL SEE WHAT WE COULD DO.

[LAUGHTER] COUNCIL MEMBER, SWEET.

>> I MOVE TO READ RESOLUTION NUMBER 2023-19 BY TITLE ONLY.

>> I'LL SECOND.

>> THANK YOU. COUNCIL MEMBER HOUSE.

ANY DISCUSSION? ALL THOSE IN FAVOR?

>> AYE.

>> ANY OPPOSED.

>> A RESOLUTION OF THE FLAGSTAFF CITY COUNCIL APPROVING THE CITY OF FLAGSTAFF COMMUNITY DEVELOPMENT BLOCK GRANT 2023 ANNUAL ACTION PLAN AND AUTHORIZING IT SUBMISSION TO THE UNITED STATES DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT.

>> THANK YOU. CAN I GET MUCH? COUNCIL MEMBER, SWEET.

>> I MOVE TO ADOPT RESOLUTION NUMBER 2023-19.

>> I'LL SECOND.

>> THANK YOU. ANY DISCUSSION? ALL THOSE IN FAVOR?

>> AYE.

>> AYE.

>> AYE.

>> ANY OPPOSED? MOVING DOWN TO ITEM 11C,

[C. Consideration and Adoption of Resolution No. 2023-22: A resolution approving Binding Waivers of Enforcement for twelve parcels of land located in the City of Flagstaff. STAFF RECOMMENDED ACTION: 1) Read Resolution No. 2023-22 by title only 2) City Clerk reads Resolution No. 2023-22 by title only (if approved above) 3) Adopt Resolution No. 2023-22]

CONSIDERATION AND ADOPTION OF RESOLUTION NUMBER2023-22, A RESOLUTION APPROVING BINDING WAIVERS OF ENFORCEMENT FOR 12 PARCELS OF LAND LOCATED IN THE CITY OF FLAGSTAFF.

>> GOOD AFTERNOON, MAYOR AND COUNCIL CHRISTINA RUBALCAVA, SENIOR ASSISTANT CITY ATTORNEY, HERE TO DISCUSS SOME BINDING WAIVERS OF ENFORCEMENT.

ON NOVEMBER 17TH OF 2020, THE FLAGSTAFF CITY COUNCIL ADOPTED ORDINANCE 2020-28, WHICH MADE VARIOUS AMENDMENTS TO THE FLAGSTAFF ZONING CODE.

THESE AMENDMENTS MADE CERTAIN CHANGES THAT REGULATE HIGH OCCUPANCY HOUSING, WE CALL THEM THE HOH AMENDMENTS.

SOME OF THOSE CHANGES INCLUDED REQUIRING A CONDITIONAL USE PERMIT FOR HOH,

[01:10:02]

RESTRICTING HOH OF FOUR UNITS OR MORE TO THE PEDESTRIAN SHED OF AN ACTIVITY CENTER AND ADDING PARKING, BEDROOM, BATHROOM, AND OTHER REGULATIONS.

IN FEBRUARY OF THIS YEAR, THE CITY RECEIVED PROP 207 CLAIMS ON BEHALF OF 12 PARCELS OF LAND AND THE OWNERS CLAIM THAT AS A RESULT OF THE HOH CODE AMENDMENTS, THEIR PROPERTIES LOST A COLLECTIVE $20 MILLION.

ARS.12-1134, ALSO KNOWN INFORMALLY AS PROP 207, PROVIDES THAT IF THE EXISTING RIGHTS TO USE DIVIDE SELLER POSSESS PRIVATE REAL PROPERTY ARE REDUCED BY THE ENACTMENT OR APPLICABILITY OF ANY LAND USE LAW ENACTED AFTER THE DATE THE PROPERTY IS TRANSFERRED TO THE OWNER, AND THAT ACTION REDUCES THE FAIR MARKET VALUE OF THE PROPERTY, THEN THE OWNER IS ENTITLED TO JUST COMPENSATION FROM THE CITY.

THE LANDOWNER MUST MAKE A WRITTEN DEMAND FOR A SPECIFIC AMOUNT OF JUST COMPENSATION, AND THE CITY THEN HAS 90 DAYS TO PAY, AMEND THE LAW OR PERMANENTLY WAVE ENFORCEMENT OF THE NEW LAND USE LAW ON THE LANDOWNERS PARCEL.

IF THE CITY DOES NOT ADD TO THE LANDOWNER MAY FILE A CLAIM FOR JUST COMPENSATION AND SUPERIOR COURT WITHIN THREE YEARS FROM THE DATE THAT THE LAND USE LAW TOOK EFFECT.

JUST COMPENSATION FOR DIMINUTION IN VALUE IS THE REDUCTION OF FAIR MARKET VALUE FOR THE PROPERTY RESULTING FROM THE LAND USE LAW, AND FAIR MARKET VALUE IS THE MOST LIKELY PRICE WHICH THE LAND WOULD BRING IF EXPOSED FOR SALE ON THE OPEN MARKET.

IF APPROVED BY COUNCIL, THE CITY WILL AGREE AND DECLARED THAT THE HOH ZONING CODE AMENDMENTS WILL NOT BE ENFORCED TO ANY PORTION OF THE 12TH PROPERTIES IDENTIFIED IN THE BINDING WAIVER OF ENFORCEMENT WHICH IS ATTACHED IN THE STAFF SUMMARY AS EXHIBITED TO THE RESOLUTION.

WITH THAT, I'M HERE FOR ANY QUESTIONS.

>> THANK YOU. ANY QUESTIONS? COUNCIL? I WILL ENTERTAIN A MOTION.

COUNCIL MEMBER HOUSE.

>> I MOVE TO READ RESOLUTION NUMBER 2023-22 BY TITLE ONLY.

>> I'LL SECOND. THANK YOU.

ANY DISCUSSION? ALL THOSE IN FAVOR.

>> AYE.

>> AYE.

>> ANY OPPOSED? CITY CLERK?

>> A RESOLUTION OF THE FLAGSTAFF CITY COUNCIL APPROVING BINDING WAIVERS OF ENFORCEMENT FOR 12 PARCELS OF LAND WITHIN THE CORPORATE LIMITS OF THE CITY OF FLAGSTAFF.

>> THANK YOU.

>> I MOVE TO ADOPT RESOLUTION NUMBER 2023-22.

>> I'LL SECOND. THANK YOU.

ANY DISCUSSION? ALL THOSE IN FAVOR?

>> AYE.

>> AYE.

>> ANY OPPOSED? MOVING ON TO 11 D,

[D. Consideration and Adoption of Resolution No. 2023-17: A resolution of the Flagstaff City Council, approving the First Amendment to the Transit Service Intergovernmental Agreement by and between the City of Flagstaff and the Northern Arizona Intergovernmental Public Transportation Authority STAFF RECOMMENDED ACTION: 1) Read Resolution No. 2023-17 by title only 2) City Clerk reads Resolution No. 2023-17 by title only (if approved above) 3) Adopt Resolution No.2023-17]

CONSIDERATION AND ADOPTION OF RESOLUTION NUMBER 2023-17, A RESOLUTION OF THE FLAGSTAFF CITY COUNCIL APPROVING THE FIRST AMENDMENT TO THE TRANSIT SERVICE INTERGOVERNMENTAL AGREEMENT BY AND BETWEEN THE CITY OF FLAGSTAFF AND THE NORTHERN ARIZONA INTERGOVERNMENTAL PUBLIC TRANSPORTATION AUTHORITY.

>> MAYOR, VICE MAYOR, MEMBERS OF COUNCIL, DAVID PETERSON, CAPITAL IMPROVEMENT PROJECT MANAGER.

I'M HAPPY TO SAY THAT THIS DOCUMENT HAS BEEN IN THE WORKS FOR SEVERAL YEARS.

I'M REALLY THANKFUL TO THE MOUNTAIN LINE TEAM FOR MAKING THIS POSSIBLE.

WHAT THIS REALLY DOES IS JUST ENSHROUDED THE TEAMWORK THAT WE HAVE AND THEIR CONTRIBUTION TO THE PROJECT FOR THE DESIGN AND THE CONSTRUCTION OF THEIR TWO BUS LANES, AS WELL AS THE BUS STOPS THAT ARE ON THE NEW BEULAH PORTION OF THE PROJECT.

THEN WE ALSO HAVE PART OF THIS AS THE RESOURCE SHARING AGREEMENT.

WHEN WE ARE BACK AT BEFORE COUNCIL PRESENTING THE GMP BACK IN DECEMBER FOR THE PROJECT, WE TALKED ABOUT THOSE VALUE ENGINEERING EFFORTS.

WE WERE ABLE TO TAKE THAT THE 50,000 CUBIC YARDS THAT WE'RE PRODUCING AS PART OF THE BIOLA UNIVERSITY PROJECT, AND SHARE THAT WITH MOUNTAIN LINE IN A WAY THAT BENEFITS THE CITY AND MOUNTAIN LINE TO HELP THEM CONSTRUCT THEIR NEW COMMERCIAL DRIVER'S LICENSE COURSE ON SOUTH CAMPUS OF NTU, AS WELL AS THE DOWNTOWN CONNECTION CENTER.

THIS JUST IN SHROUDS THAT AGREEMENT INTO PLACE.

THERE'S AN EXHIBIT A THAT SHOWS THE EXTENT OF THE PROJECT, AND THEN EXHIBIT B DOES THE BREAKDOWN OF ALL THE COSTS.

I'LL SPARE YOU FROM GOING DOWN ALL THOSE NUMBERS, BUT THERE IS A PERCENTAGE THAT WAS CALCULATED BASED ON THE COST THAT MOUNTAIN LINE HAS AS A COMPARISON TO THE TOTAL GMP VALUE, AND THAT PERCENTAGE WAS APPLIED ACROSS ALL SPECTRUMS OF THE BUDGET TO IT.

IF YOU'RE WONDERING WHERE THAT 1.610, I THINK IS THE NUMBER THAT WAS APPLIED.

ANY QUESTIONS ON THAT? I'M HAPPY TO ENTERTAIN THOSE. THANK YOU.

>> THANK YOU. ANY QUESTIONS OR COMMENTS? LOOKS LIKE COUNCIL IS GOOD.

CAN I GET A MOTION?

>> I MOVE TO READ RESOLUTION 2023-17 BY TITLE ONLY.

>> THANK YOU. ANY SECOND?

>> I'LL SECOND.

>> THANK YOU. ANY DISCUSSION? ALL THOSE IN FAVOR?

>> AYE.

>> AYE.

>> ANY OPPOSED? CITY CLERK.

>> A RESOLUTION OF THE FLAGSTAFF CITY COUNCIL APPROVING THE FIRST AMENDMENT TO TRANSIT

[01:15:02]

SERVICE INTERGOVERNMENTAL AGREEMENT BY IN-BETWEEN THE CITY OF FLAGSTAFF AND THE NORTHERN ARIZONA INTERGOVERNMENTAL PUBLIC TRANSPORTATION AUTHORITY.

>> THANK YOU.

>> THANK YOU.

>> I MOVE TO ADOPT RESOLUTION NUMBER 2023-17.

>> SECOND?

>> I'LL SECOND.

>> THANK YOU. ANY DISCUSSION? ALL THOSE IN FAVOR?

>> AYE.

>> AYE.

>> AYE.

>> ANY OPPOSED? MOVING DOWN, I REALIZED THAT MOST OF THE AUDIENCE IS PROBABLY HERE FOR INFORMATIONAL ITEMS TO FROM MAYOR, COUNCIL, AND STAFF AT THE END OF THE AGENDA, BUT WE DO NEED TO GET THROUGH THESE PUBLIC HEARING ITEMS, SO 12A 1 AND 2,

[i. Consideration and Adoption of Resolution No. 2023-20 and Ordinance No. 2023-12: A Resolution of the City of Flagstaff, Coconino County, Arizona, declaring as a public record that certain document filed with the City Clerk entitled "NAH Health Village Phase 1 Specific Plan" and an Ordinance of the City Council of the City of Flagstaff, Coconino County adopting the NAH Health Village Phase 1 Specific Plan to guide the development of 172.62 acre of real property and to provided specific development requirements for 93.39 acres generally located at 1120 W Purple Sage Trail. STAFF RECOMMENDED ACTION: At the May 2, 2023, Council Meeting: 1) Hold Public Hearing 2) Read Resolution No. 2023-20 by title only 3) City Clerk reads Resolution No. 2023-20 by title only (if approved above) 4) Read Ordinance No. 2023-12 by title only for the first time 5) City Clerk reads Ordinance No. 2023-12 by title only (if approved above) At the May 16, 2023, Council Meeting: 6) Adopt Resolution No. 2023-20 7) Read Ordinance No. 2023-12 by title only for the final time 8) City Clerk reads Ordinance No. 2023-12 by title only (if approved above) 9) Adopt Ordinance No. 2023-12]

WE'RE FIRST GOING TO HAVE A PRESENTATION FROM STAFF, AND THEN THE APPLICANT IS GOING TO GIVE A PRESENTATION.

COUNCIL WILL ASK QUESTIONS, AND THEN WE WILL OPEN IT UP FOR PUBLIC COMMENT.

BUT FIRST, BEFORE WE DO ANY OF THIS, I AM GOING TO OPEN THE PUBLIC HEARING.

[NOISE] TIFFANY.

>> THANK YOU SO MUCH, MAYOR AND COUNCIL.

WE WERE GOING TO PLAY A LITTLE JOKE AND INTRODUCE PICKLEBALL, BUT [LAUGHTER] JUST KIDDING.

TONIGHT WE ARE HERE TO TALK ABOUT THE NAH HEALTH VILLAGE, WHICH IS A PHASE 1 SPECIFIC PLAN, AS WELL AS A PHASE 1 CONCEPT ZONING MAP AMENDMENT.

BEFORE WE GET STARTED, I'D JUST LIKE TO SAY THAT IT REALLY DOES TAKE A TEAM TO MAKE A CASE LIKE THIS AND TO BRING IT BEFORE YOU ALL TODAY.

I THINK ALMOST EVERYBODY IN CITY HALL AND OUT IN THE BOUNDS OF THE CITY EVERYWHERE PROBABLY TOUCHED THIS CASE IN SOME DEGREE OR HELD MY HAND OR TALKED ME THROUGH AND EDUCATED ME ON HOW TO BEST BRING THIS CASE TO YOU ALL TODAY.

I WANT TO SHOUT OUT AND IF I FORGOT ANYBODY, I'M SO SORRY, BUT WE REALLY DO WORK WITH THE MOST AMAZING GROUP OF PEOPLE HERE IN FLAGSTAFF.

WITH THAT, WE'LL GET STARTED.

THIS IS THE NAH HEALTH VILLAGE.

THE PROPERTY IS LOCATED AT 1120 WEST PURPLE SAGE TRAIL.

THE PROPOSED USE FOR PHASE 1 IS UP TO 1.15 MILLION SQUARE FEET OF HOSPITAL AND MEDICAL OFFICES, AS WELL AS 31.2 ACRES OF OPEN SPACE AND CIVIC SPACE.

PHASE 2 WILL INCLUDE SUPPORTING USES, WHICH INCLUDE APPROXIMATELY 315 RESIDENTIAL DWELLING UNITS AS PART OF A MIXED-USE DEVELOPMENT, APPROXIMATELY 230,000 SQUARE FEET OF NON-RESIDENTIAL USES, AND APPROXIMATELY 250,000 SQUARE FEET OF RESEARCH AND DEVELOPMENT USES.

THIS REQUEST INCLUDES THE ADOPTION OF A NEW SPECIFIC PLAN FOR APPROXIMATELY 172.6 ACRES AND THE CONCEPT ZONING MAP AMENDMENT OF 98.39 ACRES FROM RURAL RESIDENTIAL AND ESTATE RESIDENTIAL TO HIGHWAY COMMERCIAL FOR 63 ACRES, AND PUBLIC FACILITIES FOR 35.21.

THOSE ARE ALL GROSS ACRES.

I'LL TRY NOT TO GET CONFUSED BETWEEN THE GROSS AND THE NET.

ALSO, WE'RE ADDING THREE PARCELS UNDER THE RESOURCE PROTECTION OVERLAY.

I DON'T WANT TO FORGET THAT. HERE IS WHERE THE PROPERTY IS LOCATED.

IT'S THIS FAINT BLUE OUTLINE.

IT DOES SIT NORTH OF TUTHILL COUNTY PARK.

IT IS ACROSS I17 FROM PONDEROSA TRAILS AS WELL AS THE CITY OF FLAGSTAFF AIRPORT.

THE HOSPITAL SITE ITSELF IS TO THE EAST OF AN AREA OF LAND THAT IS LARGE LOT SINGLE-FAMILY RESIDENTIAL, AND IT'S TO THE SOUTH OF BOTH VACANT LAND AND A COUNTY HOLDING PARCEL AREA KNOWN AS MOUNTAIN DELL.

THE PURPOSE OF A SPECIFIC PLAN IS TO PROVIDE A GREATER LEVEL OF DETAIL FOR GEOGRAPHIC AREA OR ELEMENT OF THE REGIONAL PLAN AND TO PROVIDE FOR THE SYSTEMATIC IMPLEMENTATION OF THE REGIONAL PLAN.

SPECIFIC PLANS CAN BE ADOPTED AS MASTER PLANS FOR DEVELOPMENT WHEN THEY ACCOMPANY A REQUEST FOR REZONING.

THE DEVELOPMENT OF SPECIFIC PLANS IS ESSENTIAL FOR THE IMPLEMENTATION OF THE FLAGSTAFF REGIONAL PLAN AND ITS VISION.

THESE PLANS ARE NECESSARY TO FURTHER DETERMINE THE NATURE AND SCALE OF ACTIVITY CENTERS, CORRIDORS, AND NEIGHBORHOODS, AS WELL AS THE CROSS-SECTIONS AND ALIGNMENT OF FUTURE CORRIDORS AND THE PRIORITY AND GOALS IN A PARTICULAR AREA.

THE PLANNING FRAMEWORK FOR THIS SPECIFIC PLAN DIVIDES THE TOTAL 172.6 ACRES SITE INTO SEVEN LAND-USE AREAS.

THIS IS AGAIN SETTING WHAT THAT PLANNING FRAMEWORK WILL BE FOR THE ENTIRE HEALTH VILLAGE.

[01:20:04]

THIS WOULD INCLUDE LAND-USE AREAS 1A AND 1B.

THOSE ARE THE AREAS IN GREEN, 35.2 ACRES.

THEY ARE INCLUDED IN THIS PORTION OF THE REZONING REQUEST.

LAND-USE AREA 2A WHICH IS A 17-ACRE SITE.

IT IS INTENDED FOR MIXED-USE.

IT IS LOCATED ON THE FAR NORTH PORTION OF THE PROPERTY.

LAND USE AREA 2B WHICH IS JUST OVER 63 ACRES.

IT IS THE MAIN LOCATION OF THE HOSPITAL.

THIS IS ALSO A PARCEL SUBJECT TO THE REZONING THAT YOU'RE LOOKING AT TONIGHT, THEN YOU HAVE LAND-USE AREA 2C, WHICH IS PART OF THAT OVERALL HOSPITAL ISLAND BUT WILL BE A SEPARATE BLOCK.

IT WILL ALSO BE REZONED AT A SEPARATE TIME.

IT IS LIKELY INTENDED FOR A HOSPITAL BUT COULD BE SOME OTHER TYPE OF COMMERCIAL USE OR IT IS LIKELY INTENDED FOR A HOTEL BUT COULD BE SOME OTHER COMMERCIAL USE.

FURTHER SOUTH, WE HAVE LAND USE AREA 2D, ABOUT 25 ACRES, WHICH IS ALSO INTENDED FOR MORE SUPPORTING COMMERCIAL USES.

THEN LAND-USE AREA 3, JUST UNDER 30 ACRES INTENDED FOR RESEARCH AND DEVELOPMENT USES, AFFILIATED WITH THE HOSPITAL AND SELF-SUPPORTING AS WELL.

THIS SPECIFIC PLAN, ARIZONA REVISED STATUTE, PROVIDES THE AUTHORITY FOR THE SCOPE FOR MUNICIPALITIES TO ADOPT A SPECIFIC PLAN.

THEY MAY BE ADOPTED EITHER THROUGH AN ORDINANCE OR THROUGH A RESOLUTION.

IN THIS CASE, WE'RE LOOKING AT ADOPTING THIS PARTICULAR SPECIFIC PLAN THROUGH ORDINANCE.

THE ARIZONA REVISED STATUTES ALLOWS THE SPECIFIC PLAN TO CREATE REGULATIONS DETERMINING THE LOCATION OF BUILDINGS AND OTHER IMPROVEMENTS WITH RESPECT TO EXISTING RIGHTS OF WAY FLOODPLAINS AND PUBLIC FACILITIES.

IT ALSO ALLOWS THE SPECIFIC PLAN TO CREATE REGULATIONS OF THE USE OF LAND, BUILDINGS, AND STRUCTURES, INCLUDING THE HEIGHT AND BULK OF BUILDINGS AND STRUCTURES AND THE OPEN SPACES AROUND THOSE BUILDINGS.

WE'LL TALK QUICKLY ABOUT WHAT THE ZONING CODE MODIFICATIONS ARE THAT YOU'LL SEE WITHIN THIS SPECIFIC PLAN.

THE FIRST IS IN REGARD TO SITE PLANNING DESIGN STANDARDS.

IN THIS PARTICULAR CASE, THE CITY OF FLAGSTAFF SITE PLANNING DESIGN STANDARDS ARE LOOKING FOR A BUILDING FORWARD DESIGN.

WE WANT TO GET THE BUILDINGS AS CLOSE AS POSSIBLE TO THE STREET, ONE, BECAUSE OF THE ACCESSIBILITY FOR TRANSIT FOR BIKES AND PEDESTRIANS, INSTEAD OF HAVING LARGE PARKING FIELDS IN FRONT OF BUILDINGS.

IN THIS CASE, THE HOSPITAL LOCATION IS IN CLOSE PROXIMITY TO I17 AS WELL AS THE EXISTING AIRPORT.

HOSPITALS, I AM TOLD ARE SENSITIVE TO NOISE AND SOUND.

FOR THAT REASON, THE APPLICANTS HAVE REQUESTED TO STRAY FROM OUR TYPICAL SITE PLANNING DESIGN STANDARDS TO ALLOW THE BUILDING TO BE SET BACK FURTHER, WHICH WOULD ALLOW A LARGER PARKING FIELD TO BE LOCATED IN FRONT OF THE BUILDING.

ADDITIONALLY, ARCHITECTURAL DESIGN STANDARDS ARE PROPOSED TO BE MODIFIED.

THIS INCLUDES MODIFYING THE BUILDING MATERIALS TO ALLOW EIFS OR STUCCO AS MORE OF A PRIMARY BUILDING MATERIAL.

THIS IS FOR THE LARGEST PORTION OF THE BUILDING, THE PATIENT TOWER, WHICH IS ALSO THE TALLEST PORTION OF THE BUILDING.

WHILE STUCCO IS NOT A PRIMARY MATERIAL FOR THE CITY OF FLAGSTAFF, IT DOES WORK WELL ON A BUILDING OF THIS HEIGHT.

IN TERMS OF GIVING THE BUILDING DEFINITION, A LOT OF OUR OTHER SMALLER GRAIN MATERIALS ARE LOST ON A BUILDING OF THIS PARTICULAR HEIGHT.

ADDITIONALLY, NAH GUIDELINES MODIFY OUR BUILDING AND MASSING SCALES.

THE PROPOSED BUILDING IS DOING A GOOD JOB OF BREAKING ITSELF DOWN IN TERMS OF MASSING, BUT IT DOESN'T MEET OUR SPECIFIC ARTICULATION STANDARDS, WHICH CAN BE DIFFICULT TO ACHIEVE, ESPECIALLY WITH THIS PARTICULAR TYPE OF USE.

ADDITIONALLY, THE SPECIFIC CODE IS LOOKING TO AMEND OUR BICYCLE PARKING STANDARDS BY ENHANCING OR INCREASING OUR REQUIRED BICYCLE PARKING AND INCLUDING BICYCLE PARKING SPACES THAT ARE COVERED, INCLUDED WITHIN THE GARAGE.

ALSO, NAH IS PROPOSING TO ALTER THE DEFINITION OF MEETING FACILITIES PUBLIC OR PRIVATE TO INCLUDE THE POSSIBILITY OF A CONFERENCE CENTER OR CONVENTION CENTER.

THIS IS A USE THAT'S NOT CLEARLY CALLED OUT IN OUR CODE.

IT WAS GREAT THAT THIS WAS BROUGHT TO LIGHT.

I HOPE TO BRING THOSE FORWARD TO YOU IN A FUTURE CODE AMENDMENT SO THAT WE CAN MAKE SURE THAT THIS IS USED PROPERLY AND ADEQUATELY COVERED BY OUR CODE.

NEXT STEP, WE HAVE SPECIFIC STANDARDS OR MODIFICATIONS TO THE ZONING DISTRICTS THEMSELVES.

IN TERMS OF THE PUBLIC FACILITIES ZONE, IT'S ABOUT THE USES THAT ARE ALLOWED IN THE ZONE.

NAH IS PROPOSING TO AMEND THE ALLOWED USES OF THE PF ZONE TO PROHIBIT THE DEVELOPMENT OF LIBRARIES, MUSEUMS, RESIDENTIAL USES, CEMETERIES, GOVERNMENT OFFICES, GOVERNMENT SERVICE MAINTENANCE FACILITIES, AND MUNICIPAL AIRPORTS.

ALL OTHER LISTED USES REMAIN THE SAME.

[01:25:02]

NONE OF THE PF ZONE BUILDING FORM AND PROPERTY DEVELOPMENT STANDARDS ARE MODIFIED BY THE SPECIFIC PLAN.

ADDITIONALLY TO THE HIGHWAY COMMERCIAL ZONE STANDARDS, NAH PROPOSED TO AMEND THE USES OF THE HC ZONE BY PROHIBITING MOST OF THE USES THAT ARE NOT COMPATIBLE WITH THE PROPOSED HOSPITAL AND ACC USES, ACC, AMBULATORY CARE CENTER.

THE HOSPITAL IS MODIFIED FROM REQUIRING A CONDITIONAL USE PERMIT TO BEING A PERMITTED USE.

WE'VE GONE THROUGH A LOT OF WORK.

THE THOUGHT PROCESS HERE IS THAT AN ADDITIONAL CONDITIONAL USE PERMIT REALLY DOESN'T GET US ANYTHING ADDITIONAL.

WERE DOING LOTS OF PUBLIC OUTREACH, LOTS OF PUBLIC HEARINGS, AND COMMENTS.

AN ADDITIONAL USE PER MINUTE AT THIS POINT PROBABLY DOESN'T HELP US MUCH IN THIS PROCESS.

ONE NEW USE HAS BEEN ADDED.

ALL OTHER LISTED USES ARE LISTED ONLY AS PERMISSIBLE AS AN ACCESSORY USE.

A RESTAURANT, FOR EXAMPLE MOST HOSPITALS DO HAVE A CAFE, THEY HAVE A PLACE FOR PEOPLE TO EAT AT.

THERE'S A NUMBER OF USES BECAUSE THE HOSPITAL ITSELF IS THIS LITTLE ISLAND OF WHICH AND THEN THIS MIXED-USE BUILDING OR ALL OF THESE DIFFERENT THINGS OCCUR.

THOSE USES WILL STILL BE ALLOWED.

THEY'LL JUST BE CONSIDERED ACCESSORY TO THE PRIMARY USE OF THE HOTEL AND MEDICAL OFFICES.

ONE NEW USE IS ADDED AND THAT INCLUDES THE AIRPORTS LANDING STRIPS BECAUSE THERE IS A HELIPAD AND THERE'S A HELIPAD AT THE EXISTING HOSPITAL SITE, THERE WILL BE A HELIPAD LOCATED HERE.

THAT HELIPAD WILL BE LOCATED ON THE TOP OF THE TALLEST TOWER OF THIS BUILDING.

ALSO IN TERMS OF THE HIGHWAY COMMERCIAL ZONES STANDARDS, THE BUILDING FORM AND PROPERTY DEVELOPMENT STANDARDS ARE MODIFIED TO ALLOW A MAXIMUM BUILDING HEIGHT OF 160 FEET.

I KNOW THAT COUNCIL HAS SPECIFICALLY REQUESTED THE DIMENSIONS AND HOW THAT HEIGHT BREAKS OUT.

THE APPLICANT IS PREPARED TO PROVIDE THAT INFORMATION TO YOU AS THEIR SITE PLAN, WHICH IS CURRENTLY BEING REVIEWED BY STAFF, IS NOT PART OF THIS APPLICATION.

ADDITIONALLY, SO THEY CAN GO OVER THE HEIGHT AND THE REASONINGS FOR THE HEIGHT, THE PROPOSAL, THEY DO A MUCH BETTER JOB AT EXPLAINING THEIR BUILDING THAN I EVER CAN.

BUT THE APPLICANT HAS ALSO PROVIDED A VIEWSHED ANALYSIS, STAFF'S PRIMARY CONCERN AND LOOKING AT A BUILDING OF A TALLER HEIGHT IS WHAT WILL BE THE ULTIMATE VIEWSHED ANALYSIS IMPACT TO THE SURROUNDING COMMUNITY.

WHEN I RUN IT THROUGH SOME PICTURES FOR YOU REALLY QUICKLY, THIS IS OF COURSE, WE'RE LOOKING UP IN THE AIR DOWN AT THE HOSPITAL, BUT I THINK IT GIVES YOU A GREAT IMAGE OF THE SITE OVERALL, BECAUSE TO REALLY SEE THE SITE AS A WHOLE, YOU'D HAVE TO BE LOOKING UP DOWN TOWARDS THE PROJECT.

YOU CAN SEE THE MAIN HOSPITAL TOWER RUNNING EAST, WEST.

YOU CAN SEE THE AMBULATORY CARE CENTER OUT IN FRONT.

YOU CAN SEE THE HOSPITAL, AND YOU CAN SEE THE VARIATIONS IN HEIGHT MODULATION AND ARTICULATION.

LET'S TALK ABOUT WHERE THIS BUILDING WILL BE VISIBLE FROM.

THIS VIEWPOINT IS FROM MOUNTAIN DELL.

BECAUSE OF THE DIFFERENTIAL AND TYPOGRAPHY AND THE LENGTH OF DISTANCE, IT IS UNLIKELY THAT ANY PORTION OF EVEN THE TALLEST PORTIONS OF THIS HOSPITAL WILL BE SEEN FROM MOUNTAIN DELL OR FROM THAT PARTICULAR COMMUNITY.

THIS IS ONE OF THE LOCATIONS WHERE THE BUILDING WOULD MOST LIKELY BE VISIBLE, AND THIS IS FROM SINCLAIR WASH TRAIL, WHICH DOES RUN THROUGH THE SUBJECT PROPERTY.

THIS IS AN EXISTING TRAIL.

THIS TRAIL WILL BE SURROUNDED BY AT LEAST 10 ACRES OF OPEN SPACE, BUT THE HOSPITAL WILL BE VISIBLE FROM THIS LOCATION.

THIS IS LOOKING FROM GETAWAY TRAIL THAT IS DIRECTLY WEST.

THIS IS THE RESIDENTIAL AREA.

IT IS LIKELY THERE WILL BE SOME PIECES OR PLACES WHERE SOME OF THE BUILDING COULD BE VISIBLE, YOU'RE NOT SEEING A LOT HERE.

AGAIN, I THINK IT'S GOING TO BE DIFFERENT BASED ON HOW CLOSE YOU ARE WITHIN THE VICINITY TO THE HOSPITAL ITSELF.

HERE ARE VIEWS BASICALLY ADJACENT TO THE SITE.

FROM WOODY MOUNTAIN ROAD, IT'S NOT THAT THE BUILDING IS INVISIBLE.

IT WILL OBVIOUSLY BE VISIBLE FROM CERTAIN LOCATIONS AND IS CERTAINLY GOING TO BE LOW VISIBLE FROM THE ADJACENT STREETS.

WOODY MOUNTAIN ROAD, YOU'RE GOING TO SEE THIS LENGTH OF BUILDING.

THEY'VE ADDED IN THAT PROPOSED FUTURE TOWER EXTENSION, WHICH WOULD BE AN ADDITIONAL BED TOWER SOMETIME IN THE FUTURE.

THIS IS FROM THE PARKING LOT INSIDE FORT TED HILL, WHICH ACCESSES THE BIKE PARK.

YOU CAN SEE THAT VERY LITTLE OF THE PROPOSED HOSPITAL IS SHOWN FROM INSIDE THIS PARTICULAR AREA, FORT TED HILL.

IT DOESN'T MEAN THAT FROM ALL AREAS THAT IT WOULD NOT BE VISIBLE.

AGAIN, IT'S GOING TO JUST DEPEND ON YOUR ELEVATION AND THE TREE LINE OF WHAT YOU'RE GOING TO SEE.

[01:30:02]

LASTLY FROM PONDEROSA TRAILS, VERY LITTLE VISIBILITY OF THE PROPOSED HOSPITAL.

WHERE YOU'RE REALLY GOING TO SEE THAT HOSPITAL IS WHEN YOU'RE ON I17 AND WHEN YOU'RE ON THE IMMEDIATE SURROUNDING STREETS.

THAT'S WHERE IT'LL BE THE MOST VISIBLE.

IN TERMS OF SPECIFIC PLANS, SPECIFIC PLANS ARE REQUIRED TO DO A CERTAIN SET OF COMMUNITY SERVICES IMPACT ANALYSIS.

YOU'LL BE MOST CALM, MOST FAMILIAR WITH THESE TYPES OF IMPACT ANALYSIS THAT ARE AFFILIATED WITH REZONING BECAUSE THAT'S WHAT WE SEE MOST OF THE TIME.

IN TERMS OF REZONINGS YOU'RE SEEING TRANSPORTATION IMPACT ANALYSIS, STORM-WATER IMPACT ANALYSIS, AND WATER AND SEWER.

IN THIS CASE, A SPECIFIC PLAN REQUIRES A MUCH BROADER COMMUNITY SERVICE IMPACT ANALYSIS, INCLUDING POLICE AND FIRE.

YOU CAN SEE THAT WE HAVE REACHED OUT TO OUR POLICE DEPARTMENT AND CONSULTED ON THIS PARTICULAR PROJECT.

A SPECIFIC IMPACT ANALYSIS WAS NOT REQUIRED, BUT THE FEEDBACK PROVIDED IS THAT THE NEW HOSPITAL WILL BE ABOUT 4.6 MILES FROM THE CURRENT HEADQUARTERS COMPARED WITH A DISTANCE OF 1.8 MILES TO THE CURRENT MEDICAL FACILITY.

THIS MAY RESULT IN RESPONSE TIMES A COUPLE OF MINUTES SLOWER THAN CURRENTLY PROVIDED AND THE EXTRA DISTANCE WILL HAVE MARGINAL COST IMPACT TO THE DEPARTMENT.

IT WAS LITTLE CONCERN HERE IN TERMS OF THE OVERALL SEPARATION OR THE RELOCATION OF THIS PARTICULAR FACILITY.

NEXT STEP, WE HAVE A FIRE IMPACT ANALYSIS.

THERE WERE THREE DIFFERENT ANALYSES DONE IN REGARD TO FIRE.

THE FIRST IS IN REGARD TO WILDLAND FIRE RISK ASSESSMENT.

BECAUSE OF COURSE, WE'RE TAKING A FACILITY NOW THAT'S CURRENTLY WITHIN OUR URBAN CORE AND WE'RE MOVING IT OUT TO THE EXTERIOR FRIENDS ADJACENT TO THE WILDLAND URBAN INTERFACE.

THE RESULTS OF THIS STUDY PROVIDE RECOMMENDATION, MITIGATION MEASURES FOR FUEL MANAGEMENT.

A LOT OF THIS WORK HAS ALREADY OCCURRED ONSITE.

IF YOU'VE TRAVELED BY IT IN THE RECENT PAST, YOU'LL SEE THAT THINNING WORK HAS OCCURRED.

I KNOW THAT THERE HAVE BEEN CONCERNS IN THE PAST ABOUT THAT MEANING WORK HAS ALREADY COMMENCED ON SITE.

BUT THE THINNING IS NECESSARY WHETHER THIS PROJECT IS APPROVED OR NOT, THAT THINNING IS A GOOD THING FOR US AND THE COMMUNITY AS WELL.

A LOT OF THAT WORK HAS ALREADY COMMENCED AND STARTED.

THERE ARE MITIGATION MEASURES FOR BUILDING MATERIALS AS WELL AS GENERAL RECOMMENDATIONS FOR THE OVERALL DEVELOPMENT OF THE HEALTH VILLAGE.

THOSE MITIGATION MEASURES HAVE BEEN INCORPORATED WITHIN THE SPECIFIC PLAN.

ADDITIONALLY, THERE WERE TWO STUDIES COMPLETED LOOKING AT SPECIFICALLY OUR ABILITY TO SERVE THIS PROPERTY WITH OUR FIRE DEPARTMENT RESOURCES.

THE MOST RECENT STUDY WAS COMPLETED IN NOVEMBER OF 2022, AND THAT'S A STANDARD OF COVER ANALYSIS.

THE CITY OF FLAGSTAFF WAS ALREADY WORKING ON THIS ANALYSIS BECAUSE WE KNOW OF POTENTIAL FUTURE EXPANSION AND GROWTH AND DEVELOPMENT AND THE JOHN WESLEY POWELL CORRIDOR, NAH WAS ABLE TO COLLABORATE WITH THE EXISTING CONSULTANT FOR THAT STUDY AND TO COME UP WITH SOME PARTICULAR FINDINGS ON HOW NAH MAY IMPACT OUR EXISTING RESOURCES.

WHAT I CAN TELL YOU FROM THAT STUDY IS THAT THE FLAGSTAFF FIRE DEPARTMENT DOES NOT CURRENTLY MEET THE MINIMUM STAFFING REQUIREMENTS OR NATIONAL STANDARDS OR BEST PRACTICES AS DEVELOPMENT EXISTS TODAY.

IT IS RECOMMENDED THAT WE HAVE A FULLY STAFFED LADDER COMPANY, BECAUSE THE HOSPITAL IS A HIGH-RISE TOWER, WHICH MEANS IT IS A HIGHER-RISK OCCUPANCY.

IT DEFINITELY ACCENTUATES THE NEED THAT WE MOVE SOME RESOURCES OUT OF CURRENT LOCATIONS TO HELP DEAL WITH THIS HIGH-RISK FACILITY.

WE NEED TO RELOCATE EXISTING FIRE RESOURCES.

WE ALREADY NEED A FULLY STAFFED LADDER COMPANY.

WE NOW NEED TO RELOCATE THAT LADDER COMPANY.

THE CLOSEST STATION TO THE NAH PROPOSED FACILITY IS ON LAKE MURRAY ROAD, STATION NUMBER 6.

THAT STATION IS TOO SMALL TO ACCOMMODATE THE ADDITIONAL EQUIPMENT NECESSARY, SO WE ARE LOOKING AT POSSIBLY RELOCATING THAT PARTICULAR STATION AS PART OF THIS REQUEST.

IN TERMS OF SCHOOLS, THEY TALK ABOUT THE FACT THAT THIS PARTICULAR DEVELOPMENT ISN'T INTENDED TO HAVE A SIGNIFICANT IMPACT, ESPECIALLY WITH THE AMOUNT OF HOUSING THAT'S REQUIRED.

BUT AS DEVELOPMENT IS OCCURRING IN THIS AREA, THEY'LL NEED TO BE LOOKING FOR SCHOOL SITES IN THE FUTURE.

AN ECONOMIC IMPACT ANALYSIS WAS DONE, I'LL TRY TO GO THROUGH THIS ALL VERY QUICKLY.

THESE ARE OUR HIGHLIGHT BULLET POINTS.

THIS IS DEFINITELY A 20-PAGE DOCUMENT, BUT THE HIGHLIGHTS ARE THAT CONSTRUCTION EXPENDITURES ARE PROJECTED AT OVER A BILLION DOLLARS OVER 23 YEARS.

THAT'S THE CONSTRUCTION LIFE OF THE ENTIRE HEALTH VILLAGE.

[01:35:01]

PROJECT CONSTRUCTION COULD SUPPORT OVER 10,000 DIRECT JOBS AND CLOSE TO 3,200 INDIRECT JOBS OVER THE 23-YEAR PERIOD.

ONCE THE HEALTH VILLAGE IS DEVELOPED, THE PROJECT COULD GENERATE AN ANNUAL ECONOMIC IMPACT OF 387 MILLION IN THE REGION AND COULD EMPLOY AN ESTIMATED 1,985 PEOPLE AT BUILD-OUT.

AN ESTIMATED 113 MILLION DIRECT LABOR INCOME ARE ANTICIPATED AT BUILD-OUT.

ANNUAL OFFSITE VISITOR SPENDING IS ESTIMATED AT 9.8 MILLION DOLLARS BY 2036.

THE JOBS GENERATED BY THE HEALTH VILLAGE COULD SUPPORT AN ESTIMATED LOCAL POPULATION OF 2,600 PEOPLE, WHICH IS APPROXIMATELY HALF WOULD RESIDE IN FLAGSTAFF.

THE HEALTH VILLAGE COULD GENERATE AN ESTIMATED 39.1 MILLION IN SALES TAX, BOARD AND BEVERAGE TAX, PROPERTY TAXES, AND STATE CHAIRED REVENUE TO THE CITY OF FLAGSTAFF OVER THE NEXT 23 YEARS.

LASTLY, THE LAST BUT NOT THE LEAST NEEDED COMMUNITY SERVICE IMPACT IS IN REGARDS TO OUR PARKS.

WE ARE IN DESPERATE NEED OF REGIONAL PARK FACILITIES IN OUR COMMUNITY AND THIS AREA IS NOT ANY DIFFERENT THAN ANY OTHER AREA, BUT BECAUSE IT'S JUST STARTING ITS DEVELOPMENT, IT IS UNDERSERVED BY PARKS.

I KNOW THAT SOUNDS ODD COMING FROM THE FACT THAT IT SITS DIRECTLY ADJACENT TO THE COUNTY FORT TALE PARK.

BUT THERE IS A NEED FOR ACTIVE RECREATION AND SPORTS FIELDS.

INSTEAD OF REQUIRING AN IMPACT ANALYSIS, PRO STAFF WORKED WITH THEIR EXISTING MASTER PLAN, WHICH IDENTIFIES A DEFICIENCY OF PARKS AND SPORTS FIELDS AND COMMUNITY RECREATION FIELDS IN THIS PARTICULAR AREA.

IN WORKING WITH THE STAFF AND THE APPLICANT, OUR PRO STAFF REQUESTED THAT SOME FORM OF ACCURATE ACTIVE RECREATION AMENITY BE ADDED TO THE WELLNESS RETREAT AREA THAT IS OPERATED AND MAINTAINED BY THE APPLICANT.

THE APPLICANT HAS AGREED TO EVALUATE AND INCLUDE SUCH AN AMENITY IN THEIR WELLNESS RETREAT.

THAT PARTICULAR WELDING ON A STREET TREAT HAS NOT YET BEEN DESIGNED.

LET'S JUMP INTO THE CONCEPT ZONE PLAN.

WE TALKED BEFORE ABOUT THERE BEING 63.1 ACRES TO BE REZONED TO HIGHWAY COMMERCIAL.

AGAIN, THAT'S THAT AREA HERE THAT'S IN PURPLE.

THEN WE'RE LOOKING AT REZONING THE AREA IN GREEN TO PUBLIC FACILITY.

THE REASON THAT PUBLIC FACILITY IS CHOSEN INSTEAD OF PUBLIC OPEN SPACE IS BECAUSE OF THE FACT THAT ACTIVE RECREATION IS RECOMMENDED FOR THIS SITE.

PUBLIC OPEN SPACE IS MORE LIMITED.

THAT PARTICULAR ZONING CATEGORY IS LIMITED TO MORE PASSIVE RECREATION OPPORTUNITIES.

SO, OF THE 14 PARCELS INCLUDED IN THE REQUEST, THREE WERE NOT INCLUDED IN THE RESOURCE PROTECTION OVERLAY AND SO THOSE REMAINING THREE WILL BE ADDED AS PART OF THIS REZONING REQUEST.

THE REZONING REQUEST IS PRIMARILY TO PERMIT THE DEVELOPMENT OF A NEW REGIONAL HOSPITAL, AMBULATORY CARE CENTER, AND ASSOCIATED MEDICAL OFFICES AND INCLUDES OVER 30 ACRES OF OPEN SPACE INTENDED TO FUNCTION AS A WELLNESS RETREAT.

THE FIRST PHASE OF THE DEVELOPMENT INCLUDES AN APPROXIMATELY 751,850 SQUARE FOOT HOSPITAL WITH ROOM FOR FUTURE EXPANSION.

JUST OVER 200,000 SQUARE FOOT AMBULATORY CARE CENTER AND JUST UNDER 500,000 SQUARE FOOT PARKING GARAGE, AS WELL AS THEIR AFFILIATED CENTRAL UTILITY PLAN.

THE FIRST PHASE OF THE HOSPITAL WILL INCLUDE 276 PATIENT BED, WHICH IS 35 MORE BEDS IN THE CURRENT HOSPITAL.

WE TALKED ABOUT THE PRETTY BIG WITHIN THE RESOURCE PROTECTION OVERLAY, WHAT I CAN TELL YOU IS THAT THEY WILL HAVE NO PROBLEM MEETING THEIR RESOURCE PROTECTION OVERLAY STANDARDS.

ALL OF THE ZONING CATEGORIES THAT THEY'RE LOOKING AT WILL REQUIRE 30% PRESERVATION OF THE TREES.

THERE ARE NO SLOPES, THERE ARE NO FLOODPLAINS THAT NEED TO BE PRESERVED ON THE SITE.

IN TERMS OF OPEN SPACE AND CIVIC SPACE, THIS IS JUST A ROUGH LOOK AT WHAT THIS AREA WILL PROVIDE, BUT IT IS A GOOD REFUGE FOR THE ENTIRE HEALTH VILLAGE.

IT WILL PROVIDE THAT COMMUNITY SPACE.

IT IS INTENDED TO BE OPEN FOR THE PUBLIC.

AGAIN, THERE REALLY ARE TWO SPACES.

THERE'S THE ONE THAT WILL BE THE OPEN SPACE AROUND THE EXISTING SLINK CLAIRE WASH FOOT TRAIL AND THEN THE WELLNESS RETREAT WHICH WILL BE CLOSER AND MORE AFFILIATED WITH THE HOSPITAL USE ITSELF.

IN TERMS OF LANDSCAPING AND OUTDOOR LIGHTING, LANDSCAPING IS NOT REQUIRED TO BE REVIEWED AS THIS LEVEL OF REZONING AND NEITHER IS OUTDOOR LIGHTING.

HOWEVER, CONCERNS WERE DISCUSSED IN REGARDS TO OUTDOOR LIGHTING BECAUSE OF THE HEIGHT OF THE TOWER.

THE CONCERN HERE IS MORE ABOUT THE SPILLAGE OF LIGHT OUT OF THE TOWER BEDROOMS ITSELF THAN IT IS ABOUT THE LIGHT THAT WILL BE AT THE GROUND.

THE HOSPITAL IS LOCATED IN LIGHTING ZONE 2.

THEY WILL BE ABLE TO COMPLY WITH THOSE STANDARDS, HOPEFULLY.

[01:40:05]

THE HOSPITAL HAS ALSO PROPOSED ADDING SHADES ON EACH OF THE WINDOWS ON THE NORTH AND EAST ELEVATIONS THAT WILL OPERATE ON A TIMER TO REDUCE IMPACTS FROM LIGHT SPILLAGE OUTSIDE OF THE WINDOWS DURING THE NIGHT TIME PERIODS.

ADDITIONALLY, ARCHITECTURAL ELEMENTS HAVE BEEN ADDED TO THE BUILDING TO HELP SCREEN THESE WINDOWS FROM THE DIRECTION OF THE OBSERVATORY.

THERE ARE SMALL LITERAL ARCHITECTURAL FEATURES THAT ALSO SCREEN THESE WINDOWS AS WELL.

PARKING CALCULATIONS.

THIS IS SOMETHING THAT STAFF IS REVIEWING AS PART OF THE SITE PLAN APPLICATION.

HOSPITALS ARE DEFINITELY A SITE THAT HAVE UNIQUE PARKING CALCULATIONS.

WE HAVEN'T HAD A NEW HOSPITAL BUILT IN THE CITY OF FLAGSTAFF IN QUITE SOME TIME.

I WOULD SAY THAT WE HAVEN'T SPENT A LOT OF TIME LOOKING AT OR UPDATING OUR CODE IN REGARDS TO HOSPITALS AND WHAT'S THE APPROPRIATE AMOUNT OF PARKING.

IN WORKING WITH NAH, THEY DECIDED THAT PARKING IS A SIGNIFICANT NEED FOR THEIR SITE.

THEY HAVE INCLUDED A PARKING GARAGE SO THAT THEY CAN EXCEED THE SURFACE PARKING.

WE ONLY ALLOW A DEVELOPER TO EXCEED SURFACE PARKING BY 5% AND UNLESS YOU BUILD A PARKING GARAGE AFFILIATED WITH THAT.

THAT IS THE CASE IN THIS INSTANCE.

BICYCLE PARKING, LIKE I SAID IT EARLIER, IS ALSO PART OF THE APPLICATION AND THERE'S BOTH SURFACE BICYCLE PARKING AS WELL AS BICYCLE PARKING INCLUDED WITHIN THE GARAGE.

LET'S TALK ABOUT THE BICYCLE AND PEDESTRIAN CIRCULATION SYSTEM.

THE APPLICANT HAS DONE A LOT TO CREATE A SITE THAT IS FRIENDLY TO BIKES AND PEDS, AS WELL AS TRANSIT AS WELL.

EVEN THOUGH THE SITE IS NOT CURRENTLY SERVED BY PUBLIC TRANSIT.

BIKE AND PEDESTRIAN CIRCULATION INCLUDES THE DEVELOPMENT OF MULTIPLE FOOTPATHS, AS WELL AS ON-STREET BUFFERED BIKE LANES, AS WELL AS OFF-STREET MULTIMODAL PATHS.

THERE'S A COMBINATION.

MARTIN HAS SPENT HOURS OF TIME WITH US HELPING US THAT OUT THE MOST APPROPRIATE BIKE AND PED FACILITIES FOR EACH PARTICULAR STREET WITHIN THE SYSTEM.

IF YOU HAVE PARTICULAR QUESTIONS, I CAN WORK ON GETTING YOU ANSWERS ON THOSE.

WITH THIS, I'M GOING TO ASK STEPH SANTANA TO COME UP AND GO THROUGH THE TIA FOR YOU.

>> GOOD AFTERNOON. MY NAME IS STEPH SANTANA.

I'M A TRANSPORTATION ENGINEER HERE AT THE CITY OF FLAGSTAFF.

I'LL BE PROVIDING SOME DETAILS AND INFORMATION SPECIFIC TO THE NAH TRANSPORTATION IMPACT ANALYSIS.

JUST A BRIEF OVERVIEW OF TRANSPORTATION IMPACT ANALYSIS IS REFERRED TO AS A TIA.

IT'S A DOCUMENT THAT ANALYZES THE DEVELOPERS' IMPACTS ON THE ROADWAY NETWORK.

NAH HAS EXPRESSED MANY TIMES THAT THIS IS A REGIONAL HOSPITAL, MEANING PEOPLE WHO ARE COMING FROM THE WEST KINGMAN, FROM THE NORTH THE RESERVATION, THE SOUTH CAMP VERDE, AND THE EAST MAYBE AS FAR AS THE NEW MEXICO BORDER, ALL TO RECEIVE STATE OF THE ART CARE.

MOST TRIPS WILL BE VEHICLE TRIPS, ALTHOUGH THERE ARE A NUMBER OF SHUTTLE SERVICES THAT WILL BE PROVIDED TO LOCAL SHELTERS AND MOUNTAIN LINE TRANSIT STOPS.

A HOSPITAL OF THIS MAGNITUDE REQUIRED LOOKING AT THE CITY OF FLAGSTAFF AS A WHOLE.

THAT'S WHY THE FULL BUILD-OUT TIA INCLUDES ROUGHLY 32 STUDY INTERSECTIONS AND SPANS FROM THE WESTERN CITY BOUNDARY, THE FLAGSTAFF RANCH TRAFFIC INTERCHANGE ALL THE WAY TO THE EASTERN CITY BOUNDARY, THE COUNTRY CLUB TRAFFIC INTERCHANGE.

THE FULL BUILD-OUT TIA INCLUDES THREE DIFFERENT STUDY YEARS WHICH SPANNED OVER A 40-YEAR PERIOD AND WAS ESTIMATED TO GENERATE APPROXIMATELY 53,000 NEW TRIPS.

DUE TO THE COMPRESSED TIMELINE AND THE COMPLEXITY OF THE TIA, NAH REQUESTED TO SHIFT TO A PHASE TIA PROCESS, ALLOWING THEM TO MOVE FORWARD WITH MITIGATING THE IMPACTS OF JUST THE HOSPITAL AND AMBULATORY CARE CENTER, WHICH IS THE FOCUS OF TODAY'S HEARING.

PHASE 1 UTILIZE A 2027 STUDY YEAR AND IS PROJECTED TO GENERATE APPROXIMATELY 15,000 NEW DAILY TRIPS, WHICH IS ABOUT 28% OF THE FULL BUILD-OUT 53,000 TRIPS.

THE PHASE 2 FULL BUILD-OUT TIA AND PROJECT DEVELOPMENT IS EXPECTED SHORTLY AFTER PHASE 1 IS CONSTRUCTED.

WITH A TIGHT TIMELINE AND A FEW BACK-AND-FORTH, THE PHASE 1 TIA WAS APPROVED BY CITY STAFF MARCH 30TH, 2023.

[01:45:02]

THE SCOPE FOR THE PHASE 1 TIA WAS REDUCED BY THE TRANSPORTATION ENGINEERING STAFF TO ONLY INCLUDE THE CORRIDORS AND INTERSECTIONS THAT WERE MOST DIRECTLY AFFECTED BY THE PROJECT.

THE REQUIRED PHASE 1 IMPROVEMENTS INCLUDE THE WIDENING OF THE BEULAH CORRIDOR TO A 4-LANE CROSS-SECTION FROM WOODLANDS VILLAGE BOULEVARD TO JOHN WESLEY POWELL.

SPECIFIC INTERSECTION IMPROVEMENTS ALONG BEULAH AND THE JOHN WESLEY POWELL CORRIDORS.

BACK IN DECEMBER OF 2022, NAH WAS GRANTED A REGIONAL PLAN AMENDMENT TO KEEP BEULAH AND ITS CURRENT LOCATION FOR BETTER DEVELOPMENT OF THEIR PARCEL.

MORE RECENTLY NAH HAS REQUESTED TO DELAY THE BUILD OF THE INTERSECTION OF BEULAH AND PURPLE SAGE TO THE PROPER GRADES NEEDED FOR THE FUTURE I-17 UNDERPASS.

THIS IS BECAUSE THE GRADES AT THIS LOCATION ARE DIFFICULT TO WORK WITH.

WHICH WAS WHY IT WAS ORIGINALLY PLANNED FOR BEULAH TO PULL AWAY FROM I-17 IN THIS PARTICULAR AREA.

LOOKING AT THE MAP HERE, THIS WAS THE ORIGINAL REGIONAL PLAN AND YOU CAN SEE BEULAH IS THE BLUE LINE HERE, AND BEULAH WAS PROPOSED TO PULL AWAY FROM I-17 IN ORDER TO GET GRADES FOR THE FUTURE UNDERPASS TO GO UNDER I-17 HERE, THE ORANGE ROAD.

NAH PROPOSED TO KEEP BEULAH IN THE ORIGINAL LOCATION WHICH IS TECHNICALLY UNDER THIS BIG BLACK LINE WHICH IS I-17, AND THAT'S WHY THEY'RE STRUGGLING TO GET GRADES IN THIS AREA ALONG BEULAH.

STAFF WANTED TO NOTE A FEW THINGS TO CONSIDER.

THIS UNDERPASS WAS IN THE LAST VERSION OF THE REGIONAL PLAN AND WAS RECENTLY CONFIRMED BY METRO PLAN TO BE INCLUDED IN THIS NEXT VERSION OF THE REGIONAL PLAN AS WELL.

THE METRO PLAN MODEL CONSIDERS OTHER POSSIBLE DEVELOPMENTS IN THE AREA, INCLUDING A 450 ACRE STATE TRUST PARCEL SHOWN HERE IN WHITE, ALONG WITH A 30 ACRES CITY PARCEL JUST ON THE NORTHEAST SIDE OF THE JOHN WESLEY POWELL AND I-75 INTERCHANGE, APPROXIMATELY RIGHT HERE.

ONCE THE JOHN WESLEY POWELL BRIDGE IS WIDENED TO A FOUR LANE CROSS-SECTION, WHICH IS PROPOSED BY NAH AND NEEDED FOR PHASE 2, AND NAH IS FULLY BUILT OUT.

THE BRIDGE WILL HAVE APPROXIMATELY 11% CAPACITY LEFT, WHICH IS NOT ENOUGH FOR FUTURE DEVELOPMENTS IN THE AREA.

[NOISE] THE BEULAH AND PURPLE SAGE UNDERPASSES A VERY IMPORTANT ADDITION THAT WILL ALLOW TRIPS TO DISTRIBUTE BETWEEN LAKE MARY, PURPLE SAGE, AND JOHN WESLEY POWELL.

JOHN WESLEY POWELL AND LAKE MARY ARE THREE MILES APART.

THIS HAS BEEN DEEMED THE BEST LOCATION FOR A FUTURE UNDERPASS.

THAT'S ALL I HAVE. I'M HERE FOR QUESTIONS.

MOVING RIGHT ALONG, WE'RE GETTING TO OUR WATER AND SEWER IMPACT ANALYSIS, WHICH WAS COMPLETED FEBRUARY 2022, WITH AN AMENDED LETTER IN DECEMBER 5TH 2022.

ESSENTIALLY FOR WATER THERE'S REQUIRED WATER INFRASTRUCTURE, INCLUDES A 16-INCH WATER MAIN EXTENDED THROUGH THE PROJECT SITE.

THIS WATER LINE WILL CREATE A LOOP FROM A WELL ON THE FORT TUTHILL PROPERTY TO THE EXISTING 12 INCH MAIN LOCATED AT THE INTERSECTION OF LITZLER DRIVE AND UNIVERSITY HEIGHTS DRIVE SOUTH.

ADDITIONALLY, WATER LINES TO BE CONSTRUCTED WITHIN THE SITE SHALL FEED OFF THAT MAIN THAT CONNECTS TO FORT TUTHILL EXTENSION.

THE APPLICANT MUST ALSO CONSTRUCT A WATER STORAGE TANK AND THE ASSOCIATED WATER LINES TO CONNECT IT TO THE ZONE B SYSTEM, THE TANK SHALL STORE A MINIMUM NET VOLUME OF 685,000 GALLONS.

FOR WASTEWATER THE MAIN SEWER SERVICE FOR THIS PROJECT HAS BEEN COMPLETED.

IT'S THE 18 INCH SEWER EXTENSION FROM FORT TUTHILL TO UNIVERSITY HEIGHTS.

THE COUNTY PAID FOR THE COST TO COMPLETE THIS INFRASTRUCTURE IMPROVEMENT AND HAS ELECTED TO PARTICIPATE IN THE REIMBURSEMENT AGREEMENT.

THE APPLICANT WILL BE REQUIRED TO REIMBURSE THE COUNTY THE COST OF THEIR PROPORTIONATE SHARE AS DETERMINED IN THE REIMBURSEMENT AGREEMENT.

STORMWATER ANALYSIS IS WHAT YOU COMMONLY SEE FOR MOST OF THESE PROJECTS, A FULL DRAINAGE IMPACT ANALYSIS WAS NOT COMPLETED WITH THE DOWN FLOW ANALYSIS INSTEAD, HERE YOU SEE WHAT WE TYPICALLY SEE AND THAT THEY WILL MITIGATE THE DIFFERENCE BETWEEN PEAK FLOW [NOISE] MITIGATION OF POST DEVELOPMENT AND PRE-DEVELOPMENT FLOW RATES.

WHAT IS STAFF'S ROLE IN ALL OF THIS REVIEW? I'VE JUST GIVEN YOU A LOT OF INFORMATION FROM A LOT OF DIFFERENT STAFF MEMBERS.

FOR THE MOST PART, STAFF'S DOING A CODE REVIEW.

WHAT STAFF IS ENSURING THE PROJECT COMPLIES WITH CURRENT CODES OR THAT MODIFICATIONS OR WAIVERS ARE CONSIDERED WHEN NECESSARY.

ADDITIONALLY, THERE'S A POLICY REVIEW AS PART OF THESE CASES.

[01:50:01]

STAFF PROVIDES GUIDANCE ON HOW PROJECT CAN BEST CONFORM TO THE POLICIES THAT HAVE BEEN ADOPTED BY THE CITY.

THE INNER DIVISION STAFF TEAM, OUR IDS TEAM [NOISE] INCLUDES BOTH TYPES OF REVIEWS.

VERY MUCH MANY OF US ARE LOOKING AT BOTH CODE AND POLICY.

IDS APPROVALS ARE INDICATIONS FROM STAFF THAT THE REQUIRED CODE INFORMATION HAS BEEN RELAYED TO THE APPLICANT AND THAT ALL CODE REQUIREMENTS ARE MET OR ADDRESSED.

A FINAL POLICY ANALYSIS IS PROVIDED BY STAFF AS PART OF THE RECOMMENDATION TO BOTH THE PLANNING AND ZONING COMMISSION AND THEN FOLLOWS TO THE CITY COUNCIL IN ACCORDANCE WITH THE REQUIRED FINDINGS.

THAT TAKES US TO THE FINDINGS.

THE FIRST FINDING OF WHICH IS REGIONAL PLAN CONFORMANCE.

THE PROPOSED SPECIFIC PLAN AND CONCEPT ZONING MAP AMENDMENT MUST BE FOUND TO BE CONSISTENT WITH AND IN CONFORMANCE WITH THE GOALS AND POLICIES OF THE GENERAL PLAN, AND ANY APPLICABLE SPECIFIC PLANS.

IF THE APPLICATION IS NOT CONSISTENT WITH THE GENERAL PLAN IN ANY OTHER APPLICABLE SPECIFIC PLAN, THE APPLICABLE PLAN MUST BE AMENDED IN COMPLIANCE WITH THE PROCEDURES ESTABLISHED IN SECTION 11 OF CITY CODE.

OUR COMPREHENSIVE [NOISE] PLAN IS THE FLAGSTAFF REGIONAL PLAN.

IF THE SPECIFIC PLAN IS ADOPTED, IT WILL SUPPLEMENT THE REGIONAL PLAN AS WELL.

IT WILL CONTAIN ITS OWN SET OF GOALS AND POLICIES FOR THE DEVELOPMENT OF THE HEALTH VILLAGE.

ANY FUTURE REZONING CASES, AS WELL AS THE CURRENT NEED TO BE IN COMPLIANCE WITH THE GOALS AND POLICIES THAT ARE PRESENTED WITHIN THIS SPECIFIC PLAN AS WELL.

THERE'S TWO LAYERS OF POLICY REVIEW NOW THAT FOLLOW THE NAH HEALTH VILLAGE.

I WILL TELL YOU OVERALL, THERE ARE A LOT OF GOALS AND POLICIES WITHIN THE REGIONAL PLAN AND STAFF DOES THE BEST THEY CAN TO BALANCE THE PRIORITIES AND NEEDS BETWEEN ALL OF THOSE GOALS ON POLICIES.

THAT LEADS ME REALLY QUICKLY TO CARBON NEUTRALITY GOALS AND POLICIES AND I'M GOING TO HAND THE MIC OFF.

[NOISE]

>> GOOD AFTERNOON AGAIN, MAYOR AND COUNCIL, CHRISTINA RUBALCAVA, SENIOR ASSISTANT CITY ATTORNEY.

JUST VERY BRIEFLY, BECAUSE OF SOME OF THE PUBLIC COMMENT WE'VE RECEIVED [NOISE] AND SOME OTHER MEETINGS WANTED TO MAKE SURE THAT EVERYONE WAS REALLY CLEAR ABOUT THE WEIGHT OF THE DIFFERENT PLANS THAT THE CITY HAS.

AS YOU KNOW, THE CITY HAS PASSED A CARBON NEUTRALITY PLAN, VERY IMPORTANT STATEMENT OF COUNCIL POLICY.

HOWEVER, COMPLIANCE WITH THE CARBON NEUTRALITY PLAN IS NOT A FINDING FOR EITHER OF NAH'S APPLICATIONS.

INSTEAD, AS TIFFANY JUST WENT OVER FINDING NUMBER 1 IS COMPLIANCE WITH OUR REGIONAL PLAN.

OUR REGIONAL PLAN WAS APPROVED BY COUNCIL AND THE VOTERS, ALTHOUGH THE VOTERS DID NOT APPROVE SUBSEQUENT AMENDMENT, JUST THE ORIGINAL PLAN.

COMPLIANCE WITH THE REGIONAL PLAN IS REQUIRED FOR BOTH NAH APPLICATIONS BOTH FOR THE REZONING AND FOR THE SPECIFIC PLAN.

NOW THERE WERE CERTAIN AMENDMENTS TO THE REGIONAL PLAN THAT INCORPORATED SOME OF THE CARBON NEUTRALITY GOALS THAT WERE LISTED IN THAT CARBON NEUTRALITY PLAN AND THOSE CHANGES TO THE REGIONAL PLAN WERE MADE IN DECEMBER OF 2021, BUT THESE AMENDMENTS AGAIN, REPRESENT COMMUNITY GOALS.

I THINK THE ONE GOAL THAT I'VE HEARD WAS WHERE BEFORE THE REGIONAL PLAN SAID, I BELIEVE IT WAS REDUCE GREENHOUSE EMISSIONS AND IT WAS CHANGED TO ACHIEVE CARBON NEUTRALITY FOR THE FLAGSTAFF COMMUNITY BY 2030.

THAT'S A REALLY IMPORTANT STATEMENT OF THE COMMUNITY'S GOALS, BUT IT WAS NEVER INTENDED AND DOES NOT REQUIRE ANY SPECIFIC PROJECT GETTING APPROVAL TO BE CARBON-NEUTRAL.

BUT THOSE GOALS ARE AMONGST THE GOALS THAT COUNCIL CAN CONSIDER WHEN COUNCIL DOES ITS OWN ANALYSIS OF REGIONAL PLAN CONFORMANCE AND COMES TO ITS OWN CONCLUSIONS ABOUT FINDING NUMBER 1.

FINDING NUMBER 2 IS THAT THE PROPOSED AMENDMENT MUST BE DETERMINED TO NOT BE DETRIMENTAL TO THE PUBLIC INTEREST, HEALTH, SAFETY, CONVENIENCE, OR WELFARE OF THE CITY AND WILL ADD TO THE GENERAL PUBLIC GOOD AS DESCRIBED IN THE GENERAL PLAN, AND FINDING NUMBER 3, THAT THE SITE MUST BE DETERMINED TO BE PHYSICALLY SUITABLE IN TERMS OF DESIGN, LOCATION, SHAPE, SIZE, AND OPERATING CHARACTERISTICS, AND THE PROVISION OF PUBLIC AND EMERGENCY VEHICLE ACCESS, PUBLIC SERVICES AND UTILITIES TO ENSURE THAT THE REQUESTED ZONE DESIGNATION AND THE PROPOSER ANTICIPATED USES AND OR DEVELOPMENT WILL NOT ENDANGER, JEOPARDIZED OR OTHERWISE CONSTITUTE A HAZARD TO THE PROPERTY OR IMPROVEMENTS IN THE VICINITY IN WHICH THE PROPERTY IS LOCATED.

CAN WE SERVE IT? CAN THE SITE HANDLE THE DEVELOPMENT THAT IS PROPOSED? THOSE ARE THE PARTICULAR FINDINGS IN TERMS OF ADDRESSING SOME OF THOSE FINDINGS, AS WELL AS THE APPLICANTS' COMMITMENT TO CERTAIN PORTIONS OF THIS DEVELOPMENT.

A DRAFT DEVELOPMENT AGREEMENT HAS BEEN PREPARED AND WILL BE REVIEWED BY THE CITY COUNCIL ON MAY 16TH.

DEVELOPMENT AGREEMENTS ARE NOW REQUIRED TO BE NOTICED TO THE PUBLIC, SIMILAR TO OTHER PUBLIC HEARING CASES.

I HAVEN'T PREPARED A FULL PRESENTATION TONIGHT ON THE DEVELOPMENT AGREEMENT,

[01:55:05]

THERE WILL BE ONE ON MAY 16.

THE PRIMARY PURPOSE OF THIS DEVELOPMENT AGREEMENT IS TO SET OUT THE RULES AND RESPONSIBILITIES.

THIS IS JUST A HIGHLIGHT OF WHAT'S IN THE DEVELOPMENT AGREEMENT AND AGAIN, ON MAY 16 WILL GO THROUGH ALL OF THOSE FINE POINT DETAILS.

OF COURSE, IF YOU HAVE QUESTIONS, WE'RE HERE TO ANSWER THEM.

BUT I FEEL LIKE THIS IS A DOCUMENT THAT IS ON THE MOVE.

IT'S NOT CURRENTLY STATIC, SO WE'LL SEE HOW AND IF THAT DOCUMENT CHANGES EVEN MORE TONIGHT.

THE DOCUMENT DOES INCLUDE PROVISIONS FOR THAT OFFSITE WATER INFRASTRUCTURE IMPROVEMENTS, THE WATER STORAGE REQUIREMENTS, THE SEWER REIMBURSEMENT, ON-SITE AND OFF-SITE TRANSPORTATION IMPROVEMENTS, FIRE DEPARTMENT REQUIREMENTS, FUTURE AFFORDABLE HOUSING CONTRIBUTIONS, AND SUSTAINABILITY CONTRIBUTIONS.

DIGGING IN A LITTLE FURTHER ONTO THE ON-SITE AND OFF-SITE TRANSPORTATION IMPROVEMENTS.

THERE SEEMS TO BE SOME CONFUSION OUT THERE.

NAH IS REQUIRED TO PROVIDE ALL OF THE ON-SITE AND OFF-SITE TRANSPORTATION IMPROVEMENTS.

THOSE TRANSPORTATION IMPROVEMENTS ARE AS DESCRIBED BY STAFF BUT PRIMARILY FOCUSED ON THAT BEULAH CORRIDOR.

IT IS THEIR RESPONSIBILITY TO PROVIDE THOSE INFRASTRUCTURE IMPROVEMENTS.

IN TERMS OF FIRE DEPARTMENT IS PREVIOUSLY STATED.

THE CITY NEEDS A LADDER COMPANY NOW, IN WORKING WITH NAH, WE KNOW WE NEED TO RELOCATE THAT FIRE COMPANY.

NAH IS WILLING TO CONTRIBUTE 50% OF THE COST OF A NEW FIRE STATION IF NEW FIRE STATION IS DEEMED NECESSARY TO HOUSE THAT PARTICULAR LADDER COMPANY AT A LOCATION THAT BEST SERVES NAH.

FUTURE AFFORDABLE HOUSING CONTRIBUTION.

THE PROPERTY IS NOT CURRENTLY BEING REZONED FOR THAT HOUSING PIECE, BUT OF THE 315 HOUSING UNITS THAT ARE ANTICIPATED TO COME IN PHASE 2, THE APPLICANT HAS AGREED TO 10% AFFORDABLE CATEGORY ONE UNIT, SO THAT'S 32 AFFORDABLE UNITS.

SUSTAINABILITY CONTRIBUTIONS THESE HAVE BEEN ON THE MOVE, BUT THE NEWEST AND GREATEST IS THAT NAH HAS COMMITTED TO PROVIDE SOLAR PANELS ON THE GARAGE AT 40% COVER, WHICH IS APPROXIMATELY 22,000 SQUARE FEET OF SOLAR PANELS AND SOLAR ARRAYS.

OF COURSE, THE REMAINING ITEMS STILL INCLUDE BUILDINGS BEING DESIGNED AT THE 25TH PERCENTILE ENERGY STAR.

BUILDINGS DEVELOPED ON-SITE USING BEST PRACTICES AND HIGH-PERFORMANCE DESIGN, AND OF COURSE, THE SOLAR PANELS THAT WE'VE ADDED HERE.

WRAPPING THIS PRESENTATION UP, LOTS OF CITIZEN PARTICIPATION FOREVER AND ALWAYS.

BUT MORE IMPORTANTLY, THE SPECIFIC PLAN REQUIRED A MINIMUM OF A 60-DAY NOTICE BEFORE ANY PLANNING AND ZONING COMMISSION THAT HAD TO GO OUT TO SPECIFIC GOVERNMENT AGENCIES.

TO DATE, STAFF ONLY RECEIVED FORMAL 60-DAY REVIEW COMMENTS FROM COCONINO COUNTY, FUSD, AND FRIENDS OF FLAGSTAFF'S FUTURE, ALL WHICH WERE ATTACHED IN ONE OF THE VERSIONS OF PUBLIC COMMENTS TO YOUR REPORT.

THE APPLICANT DID HOLD THREE NEIGHBORHOOD MEETINGS FOR THIS APPLICATION.

THEY STARTED EARLY JANUARY 2022, ENDED UP TOWARDS THE END OF THE YEAR IN OCTOBER 2022.

COMMON THEMES OF SUPPORT INCLUDED ECONOMIC DEVELOPMENT IMPACTS BETTER ACCESS TO CARE AND CLINICAL SERVICES AND THE OVERALL HEALTH AND WELLNESS VISION.

COMMON THEMES OF CONCERN INCLUDED TRANSIT AND BUS SERVICE, ACCESS TO THE NEW CAMPUS, TRAFFIC REUSE OF THE EXISTING NAH CAMPUS, HELICOPTER, AMBULANCE NOISE, AND BUILDING HEIGHT.

THE SPECIFIC PLAN RECOMMENDATION, THE PLANNING AND ZONING COMMISSION RECOMMENDED DENIAL OF THIS APPLICATION DUE TO NON-CONFORMANCE WITH THE REGIONAL PLANNING GOALS AND POLICIES.

THEIR SPECIFIC FOCUS WAS THAT THE PART THAT I GOT THE MOST FROM THE PLANNING AND ZONING COMMISSION WAS THAT THEY DIDN'T HAVE SUFFICIENT INFORMATION TO DETERMINE IF THIS PARTICULAR DEVELOPMENT MET THE STANDARDS OF THE CARBON NEUTRALITY GOALS AND POLICIES.

THEY WERE ALSO CONCERNED IN REGARDS TO PUBLIC TRANSIT VERSUS PRIVATE TRANSIT, AND LASTLY, THEY WERE CONCERNS ABOUT THE COST OF INFRASTRUCTURE AND WHAT THE ULTIMATE COST WOULD BE FOR FLAGSTAFF TAXPAYERS.

IF THE CITY COUNCIL IS ABLE TO MAKE THE REQUIRED FINDINGS FOR THIS APPLICATION, STAFF RECOMMENDS THE FOLLOWING CONDITIONS OF APPROVAL.

THERE ARE FIVE CONDITIONS.

I WILL LET YOU KNOW THAT ORIGINALLY WE HAD A LOT MORE CONDITIONS BUILT-IN, THIS SUSPEND A LONG PUBLIC HEARING PROCESS, AND WE'VE CONTINUED TO WORK THROUGH THIS DOCUMENT, MAKE IT BETTER AND IMPROVEMENT SO THAT WE CAN BRING TO YOU THE BEST POSSIBLE DOCUMENT.

AS PART OF THIS PROCESS, WE WERE ABLE TO REFINE MANY OF THOSE ORIGINAL CONDITIONS OF APPROVAL SO YOU'RE NOW SEEING

[02:00:04]

THE STREAMLINE FINAL OF WHAT STAFF IS RECOMMENDING IN TERMS OF BOTH OF THESE CASES.

HERE ARE THE FIVE CONDITIONS FOR THE SPECIFIC PLAN, AND HERE ARE THE SEVEN CONDITIONS FOR THE REZONING CASE, AND IF YOU HAVE ANY QUESTIONS OR COMMENTS, WE HAVE LOTS OF STAFF HERE.

I WOULD LOVE TO HAND THEM OVER TO SOMEBODY ELSE.

>> THANK YOU, TIFFANY. GREAT JOB.

NOT ONLY THIS AFTERNOON BUT THROUGHOUT THE ENTIRE PROCESS.

THIS WAS A HUGE PROJECT AND YOU'VE HANDLED IT QUITE WELL FROM WHAT I CAN SEE.

BEFORE WE ALLOW TIFFANY TO SIT DOWN, DOES COUNCIL HAVE ANY QUESTIONS? COUNCIL MEMBER MATTHEWS.

>> THANK YOU, MAYOR. JUST A CLARIFICATION.

CAN YOU GO BACK THREE SLIDES? IT WAS REQUIRED FOR THE PROPOSAL TO BE REVIEWED AND FURTHER COMMENT TO ALL GOVERNMENT AGENCIES, AND SO YOU LISTED COCONINO COUNTY, FUSD, AND FRIENDS OF FLAGSTAFF'S FUTURE, THEY'RE NOT A GOVERNMENT AGENCY, CORRECT?

>>THAT'S CORRECT. THEY WEREN'T SPECIFICALLY NOTIFIED, BUT WE NOTIFY THE PUBLIC OF THE 60-DAY REVIEW PROCESS AND FQ DID RESPOND TO THAT.

>>THANK YOU.

>> OTHER QUESTIONS COUNCIL?

>> YOUR BACK.

>> THANK YOU, VICE MAYOR.

>> THANK YOU, TIFFANY, SO MUCH FOR ALL THE HARD WORK THAT YOUR TEAM IS AMAZING.

I JUST REALLY VERY IMPRESSED WITH THE WORK YOU GUYS DO.

A COUPLE OF QUICK QUESTIONS HERE.

DURING YOUR PRESENTATION ABOUT LIGHTING STANDARDS, YOU PAUSE FOR A SECOND AND YOU SAID HOPEFULLY WHEN TALKING ABOUT THEM BEING ABLE TO CONFORM TO ZONE 2 LIGHTING STANDARDS.

COULD YOU ELABORATE ON THAT A LITTLE BIT AND JUST EXPLAIN WHAT YOUR TRAIN OF THOUGHT WAS THERE?

>> ABSOLUTELY WHILE WE HAVE BEEN WORKING ON THIS PROJECT, WE ALSO AMENDED AND CHANGED OUR LIGHTING CODE STANDARDS.

ONE OF THOSE PARTICULAR LIGHTING CODE STANDARDS.

IN SOME WAYS THEY MAKE WORKING WITH THE HOSPITAL A LOT EASIER IN ONE WAY, IT GOT A LITTLE DIFFICULT AND THAT IS THAT THERE ARE CERTAIN AREAS OF ANY PROPERTY THAT WE DO ALLOW TO USE WHITE LIGHT AND THOSE ARE AREAS WHERE COLOR RENDITION IS IMPORTANT.

THE AMBULANCE ENTRANCE INTO THE EMERGENCY ROOM IS ONE OF THOSE LOCATIONS WE'RE COLORING RENDITION IS IMPORTANT.

WE HAVE A LIMITATION ON WHITE LIGHT OF 2,700 KELVIN.

THE HOSPITAL WAS ANTICIPATING AND HOPING TO USE 3,700 KELVIN.

THE LAST WEEK TALKED.

THEY WERE GOING TO TRY TO MAKE 2,700 KELVIN WORK, AND IT LOOKS LIKE THAT'S WHERE WE'RE AT.

I DIDN'T 100% HAVE THAT IN MY HEAD AT THAT MOMENT WHEN I GOT TO THAT POINT, SO I DIDN'T WANT TO OVERSTATE.

BUT THERE YOU GO. IT LOOKS LIKE WE'RE GOING TO MAKE IT WORK.

>> WONDERFUL. THANK YOU. THAT'S GREAT NEWS, AND I KNOW THAT NAH TEAM HAS BEEN RESPONSIVE TO MY REQUESTS TO ADHERE STRICTLY AS POSSIBLE TO DARK LIGHTING STANDARDS, SPECIFICALLY FOR THE NATIONAL SECURITY MISSION THAT ARE US NAVAL OBSERVATORY HAS AND THE RELATIVE PROXIMITY THAT THOSE TWO PLACES WILL HAVE TO EACH OTHER.

ANOTHER QUESTION, I WAS HOPING YOU OR MAYBE DURING THEIR PRESENTATION CAN ELABORATE ON THE STATEMENT THEY'RE GOING TO EVALUATE OPTIONS FOR AMENITIES IN TERMS OF RECREATION FACILITIES.

THAT SEEMED LIKE A VERY LOOSEY-GOOSEY RESPONSE TO THE QUESTION OF WHETHER OR NOT THEY'RE GOING TO COME TO THE TABLE WITH SOME GREAT OPTIONS FOR US.

I PROMISE TO LOOK AT OPTIONS I'M GETTING TONGUE-TIED HERE, BUT MAYBE YOU CAN JUST ELABORATE ON THAT, AND THEN FOR THE NAH PRESENTERS WILL PUT THAT ONE IN YOUR QUEUE FOR WHEN YOU'RE PRESENTING.

>> SINCE THIS PROJECT, LIKE I SAID, HAS NOT BEEN STATIC, IT'S BEEN MOVING AND GROWING AND CHANGING AND ADAPTING, AND NAH HAS SINCE COMMITTED TO DEFINITELY INCORPORATING AN ACTIVE RECREATION AMENITY AND WORKING WITH OUR PROS TEAM, SO INSTEAD OF JUST COMMITTING TO LOOKING AT THEY'VE COMMITTED TO DOING, OWNING, AND OPERATING, MAINTAINING.

>> I'M EXCITED FOR A FEW MORE DETAILS ON THAT.

THEN BEFORE YOU LEAVE, CAN YOU PUT UP THE FINDING NUMBER 2 SLIDE AGAIN, YOU WERE ON THAT FOR ABOUT TWO SECONDS,

[02:05:04]

AND I WANTED TO TAKE A LITTLE BIT OF A LONGER LOOK AND ALLOW THE PUBLIC TO GET A LONGER LOOK AT IT, TOO. THANK YOU.

>> THANK YOU, VICE MAYOR. COUNCIL MEMBER MCCARTHY.

>> THANK YOU, MAYOR. FIRST OF ALL, I WANT TO APOLOGIZE TO EVERYONE FOR BEING LATE.

I WON'T GET INTO THE REASONS, BUT I CAN ASSURE YOU IT WAS A GOOD REASON.

NO KIDDING. IN MY SEVEN YEARS IN COUNCIL, I'VE ONLY MISSED ONE MEETING AND I HAD A GOOD EXCUSE THAT ONE TOO.

IT'S MY GOAL TO BE HERE FOR EVERY MEETING.

I READ THE DEVELOPMENT AGREEMENT AND TIFFANY, YOU SAID IT'S A WORK IN PROCESS.

SOME OF THESE THINGS AND THE OTHER THING IS I MIGHT HAVE MISSED SOME OF THIS BECAUSE I CAME IN LATE.

SOME OF THIS TIES INTO WHAT MR. AZTLAN JUST SAID.

I SEE IN THE DEVELOPMENT AGREEMENT PHRASES LIKE IT IS RECOMMENDED, INSTEAD OF IT IS REQUIRED.

THOSE NEED TO BE RESOLVED.

WHAT IS RECOMMENDED, JUST TAKE IT OUT, THAT'S MEANINGLESS.

IF IT'S REQUIRED, THEN THIS PART OF THE DA, NOW THE LAWYERS ARE UP.

[LAUGHTER]

>> NO. I JUST WANTED TO SAY THE PARTS WHERE YOU POINTED ME TO AND THANKS COUNCIL MEMBER MCCARTHY FOR EMAILING YOUR COMMENTS TO ME EARLIER I APPRECIATE IT, IT DOES HELP SO I CAN BE PREPARED.

THE RECOMMENDATIONS YOU'RE REFERRING TO TALKED ABOUT HOW THERE WAS A STUDY.

THE STUDY MADE RECOMMENDATIONS AND AS A RESULT OF THE RECOMMENDATIONS, THESE ARE THE COMMITMENTS.

I THINK THE RECOMMENDATIONS THAT ARE RECOMMENDATIONS IT IS A TRUE STATEMENT THAT ITS RECOMMENDATIONS BECAUSE ACTUALLY WHAT THE RECOMMENDATION WAS FROM THAT STUDY, THE STANDARDS OF COVERS STUDY THAT TIFFANY MENTIONED THAT WE RECEIVED IN NOVEMBER OF LAST YEAR WAS TO PLACE THE LATTER COMPANY AT STATION 6.

THAT IS ACTUALLY IMPOSSIBLE BECAUSE OF THE SIZE SO WE CAN'T COMPLY SPECIFICALLY WHAT THAT RECOMMENDATION AND WE'RE GOING TO HAVE TO BUILD A NEW STATION SOMEWHERE ALONG THE LAKE MARY CORRIDOR THAT IS WHY THE COMMITMENT IS ACTUALLY SLIGHTLY DIFFERENT FROM THE RECOMMENDATION BUT STILL MEETS THE SAME GOAL.

>> I'M OKAY WITH THAT FOR TONIGHT.

BUT I'LL DO A FINAL READ ON THE DEVELOPMENT AGREEMENT AND HOPEFULLY, IT'LL BE VERY CLEAR WHAT IS REQUIRED AND WHAT IS NOT REQUIRED.

FIRE PROTECTION WAS ONE OF THE THINGS, BUT THERE WERE OTHER PLACES THAT WORDING.

I WON'T BELABOR IT NOW, BUT WE WILL COME BACK TO IT IN TWO WEEKS.

WHEN I READ THE DEVELOPMENT AGREEMENT, THE BIT ON SOLAR PANELS WAS COMPLETELY UNDEFINED AND AMBIGUOUS.

BUT I THINK I HEARD SOMETHING ABOUT THAT TONIGHT, ABOUT THE TIME I WALKED IN.

I WON'T GET INTO THAT ONE EITHER, BUT I GUESS THE ONLY POINT I'LL MAKE IS THAT IT NEEDS TO BE DEFINITIVE OF WHAT WE ARE AGREEING TO AND IT HAS TO BE SIGNIFICANT.

I WOULD ASK THAT OUR SUSTAINABILITY PEOPLE WEIGH IN ON THAT WHAT'S SIGNIFICANT AND WHAT ISN'T.

MY NEXT COMMENT HAS TO DO WITH TRAFFIC IMPACT ANALYSIS.

IF I UNDERSTAND CORRECTLY, THE EVENTS AT THE PARK WERE NOT INCLUDED IN THE ANALYSIS.

FIRST OF ALL, IS THAT A TRUE STATEMENT? I KNEW YOU'D COME UP. [LAUGHTER] THANK YOU.

>> YES, THAT IS A TRUE STATEMENT AND IT WAS NOT INCLUDED IN THE 2027 PHASE 1 TIA.

>> I GUESS I HAVE A SECONDARY QUESTION THEN.

WELL, THAT MAY BE IT OR MAY HAVE BEEN A REASONABLE DECISION.

BUT MY QUESTION IS, THERE'S CERTAIN TIMES WHEN THAT THE OFF-RAMPS GET VERY CROWDED.

IT OCCURS TO ME, WELL, THE AMBULANCES, BECAUSE WE DON'T WANT TO SLOW DOWN THE AMBULANCES JUST BECAUSE WE'RE HAVING PICKETING THE PINES OR WHATEVER.

YOU DON'T HAVE TO ANSWER THIS NOW, BUT I'D LIKE AN ANSWER BY NEXT WEEK, ARE THE SHOULDERS WIDE ENOUGH THAT THE AMBULANCE CAUSE BYPASS ALL THAT TRAFFIC THAT'S GOING ONE MILE AN HOUR AND GET INTO THE HOSPITAL? YOU CAN COME BACK TO ME ON THAT NEXT WEEK.

>> IF IT'S OKAY, I HAVE A SEMI-ANSWER TO THAT.

>> OKAY.

>> NAHS AND ADOT ARE HAVING AN AGE BUILD A BYPASS LANE OFF THE OFF-RAMPS.

SOUTHBOUND I-17 OFF THE FREEWAY, NORTHBOUND ONTO BEULAH.

[02:10:05]

IT'S A LANE SEPARATED FROM THE TWO ROUNDABOUTS AND IT WILL BYPASS THE TWO ROUNDABOUTS SO GRANTED THAT'S NOT ANSWERING YOUR QUESTION ABOUT THE WIDTH OF THE SHOULDER AND IF IT WILL BE WIDE ENOUGH, BUT THAT IS AN IMPROVEMENT THAT WILL BE MADE FOR THIS PHASE 1.

>> IT SOUNDS LIKE YOU'VE THOUGHT THAT ONE THROUGH, SO GOOD.

THEN MY LAST ONE IS, I SEE THAT PURPLE SAGE TRAIL WHEN I LOOK AT MY MAPS, WHICH I PRINTED IT OUT HERE.

IT LOOKS HALF OF IT'S ON THE COUNTY LAND AND HALF OF IT'S ON THE DEVELOPER'S LAND.

HAS THE COUNTY GAVE THEM PERMISSION TO WIDEN THAT ROAD INTO THEIR LAND? AGAIN, WELL HERE, TIFFANY, SHE KNOWS EVERYTHING.

>> IT'S ACTUALLY A MUCH SMALLER AMOUNT, SO THERE'S AN EXISTING PUBLIC ACCESS EASEMENT OVER THE AREA NOW.

THE PRELIMINARY PLAT THAT WILL SUBDIVIDE AND INCLUDE THE RIGHT-OF-WAY AND SHOWS THE RIGHT-OF-WAY DOES NOT ACTUALLY INCLUDE THAT PARTICULAR AREA, SO IT FALLS OUTSIDE.

IT WOULD HAVE TO COME THROUGH A SEPARATE DEDICATION OF THE COUNTY WAS WILLING TO DEDICATE THAT LAND.

I THINK WHETHER OR NOT THE COUNTY IS WILLING TO DEDICATE THAT LAND IS A QUESTION BETTER ANSWERED BY COCONINO COUNTY AND THE APPLICANT.

THERE IS A PRELIMINARY PLAT THAT IS CURRENTLY MOVING ITS WAY THROUGH THE REVIEW PROCESS AND WILL HOPEFULLY BE MAKING IT TO YOUR WAY SOON.

IT IS POSSIBLE, HOWEVER, THAT PURPLE SAGE COULD BE RELOCATED ENTIRELY ON NAH'S PROPERTY.

WE WERE JUST TRYING TO WORK TO MAKE SURE THAT ADEQUATE ACCESS WAS PROVIDED TO FORT TUTHILL, BUT IF THAT DOESN'T WORK FOR COCONINO COUNTY, THERE'S ALTERNATIVES.

>> I GUESS WHAT I'M HEARING IS THAT THAT'LL BE DETERMINED ON THE FINAL PLAT AND AT THAT POINT, EVERYONE AFFECTED WILL HOPEFULLY BE IN AGREEMENT.

>> IT'S ACTUALLY OUTSIDE OF THE BOUNDARIES OF THE PLAT.

IF THE RIGHT-OF-WAY IS NECESSARY, THEY'LL NEED TO RECEIVE THAT AS A SEPARATE DEDICATION, BUT WOULD ACCOMPANY THE PLAT AND WE SHOULD HAVE THAT ISSUE RESOLVED BY FINAL PLAT.

I'M HOPING TO HAVE THAT RESULT BY PRELIMINARY PLAT.

>> MAYOR, I HAVE OTHER COMMENTS, BUT I THINK AT THIS POINT, THESE ARE MORE LIKE QUESTIONS FOR STAFF A WAY TO MAKE COMMENTS.

I PRESUME WE HAVE NOT HAD PUBLIC COMMENT YET.

IS THAT TRUE? I CAN COME BACK WITH MY OTHER COMMENTS A LITTLE BIT LATER TONIGHT. THANK YOU, MAYOR.

>> THANK YOU, COUNCIL MEMBER MCCARTHY.

COUNCIL MEMBER MATTHEWS.

>> THANK YOU, MAYOR. TIFFANY, I JUST WANTED TO HAVE YOU RESTATE AGAIN SO WE'RE CLEAR BECAUSE THIS QUESTION OR COMMENT HAS CAME UP A LOT FROM THE COMMUNITY.

WE HAVE A LADDER TRUCK NOW OR IT'S COMING THAT WE GOT THROUGH.

I THINK THE BOND, CORRECT? REGARDLESS, IRRESPECTFUL OF THE HOSPITAL.

WHAT WE NEED IS TO HAVE IT LOCATED CLOSER TO THE HOSPITAL OR WE NEED TO STAFF IT AT STATION 6 IN A DIFFERENT LOCATION BECAUSE OF THE HOSPITAL.

WE DIDN'T NEED THE LADDER TRUCK BECAUSE OF THE HOSPITAL WE ALREADY HAVE THAT.

WE ALREADY ARE MISSING THE STAFF TO MAN THAT LADDER TRUCK.

BECAUSE OF THE HOSPITAL'S REQUESTED MOVE, THAT CHANGES THE LOCATION OF WHERE THAT LADDER TRUCK IS HOUSED, WHICH ALSO THEN REQUIRES THAT STAFF THAT WE NEED ANYWAY FOR THE TRUCK, CORRECT?

>> YES.

>> COUNCIL OTHER QUESTIONS? I HAVE A COUPLE.

THE DRAFT DEVELOPMENT AGREEMENT DISCUSSES PUBLIC ACCESS TO THE OPEN SPACE.

IS THERE AN EASEMENT TO THE PUBLIC OPEN SPACE THAT THE PUBLIC CAN EASILY GET TO.

>> THERE WE DO HAVE AN EASEMENT.

IT WILL BE ATTACHED TO THE FINAL DEVELOPMENT AGREEMENT.

IT IS IN THE PROCESS OF BEING REVIEWED INTERNALLY THROUGH STAFF TO MAKE SURE THAT THE LANGUAGE IS CORRECT. WORDS MATTER.

WE HAD SOME THINGS IN THERE SAYING PASSIVE RECREATION.

WE NEED TO MAKE SURE IT INCLUDED ACTIVE.

WE WANTED TO MAKE SURE THAT THERE WERE SOME SPECIFIC HOURS OF WHICH WHEN THE PUBLIC COULD EXPECT THE SPACE TO BE OPEN, I THINK WE ENDED UP WITH DUST TO DAWN.

THERE ARE PROVISIONS IN THERE FOR NIH TO CLOSE THE ACCESS TO THE PUBLIC FOR MAINTENANCE OR IF THEY WERE TO HAVE A SPECIAL EVENT ON THE PROPERTY ALONG THOSE LINES.

THERE'S PROVISIONS BUILT-IN FOR THEM AS WELL ON THE EASEMENT.

WHAT'S GREAT ABOUT THE EASEMENT IT IS IT'LL LIVE IN PERPETUITY WHERE THE DEVELOPMENT AGREEMENT ONLY LASTS FOR 40 YEARS.

>> THANK YOU. REGARDING PURPLE SAGE AND THE UNDERPASS.

I KNOW THIS HAS GONE BACK AND FORTH A NUMBER OF TIMES

[02:15:04]

AND I BELIEVE THAT THE APPLICANT WOULD LIKE TO DELAY.

WOULD LIKE TO NOT GRADE AT THIS POINT AND THEN PROVIDE THE MONEY FOR THE GRADING LATER.

I WOULD LIKE STAFF TO ADDRESS THE PROS AND CONS THOSE APPROACHES.

>> RIGHT NOW OR AT A LATER DATE?

>> WHEN COULD STAFF DO THAT?

>> STEPH, DO YOU WANT TO DO THAT NOW, JEFF DO YOU WANT TO?

>> I'D LIKE TO HEAR ABOUT IT NOW TOO.

>> COME ON UP.

>> HE LOVES IT WHEN I DO THIS TO HIM.

>> I'M SURE YOU ALL DO.

>> GOOD EVENING, MAYOR AND COUNCIL.

JEFF BOWMAN, CITY TRAFFIC ENGINEER, ALWAYS LOVED THIS MICROPHONE.

PROS AND CONS OF BUILDING THE ROAD, WHICH IS ACTUALLY BEULAH AND THE PURPLE SAGE INTERSECTION.

AS STEPHANIE HAD SHOWN ON THAT MAP, IS A FUTURE CONNECTION UNDER I17.

I MIGHT HELP ACTUALLY.

UNDER I17 TO THE EAST, IT'S NOT A ROADWAY THAT'S REQUIRED AS PART OF THE MITIGATION FOR THIS PROJECT.

BUT WE EXPECT AT SOME POINT IN THE FUTURE AND WE DON'T KNOW WHEN THAT IS.

IT'S ALL DEPENDENT ON HOW MUCH DEVELOPMENT ACTIVITY OCCURS, SPECIFICALLY IN THE SOUTHWEST PART OF THE CITY.

BUT THAT'S THE BACKGROUND ON THE ROAD.

PROS AND CONS.

OBVIOUSLY, IT'S MUCH LESS EXPENSIVE AT THE MOMENT TO NOT BUILD THE GRADES SUFFICIENT TO GO UNDER THE FREEWAY.

IT WILL BE MORE EXPENSIVE IN THE FUTURE TO DO THAT.

BUT THERE'S DEFINITELY TRADE-OFFS.

I UNDERSTAND THAT THE PLANNING PROCESS IS GOING TO ACCOMMODATE ALL OF THE LAND NECESSARY.

IF THE ROAD NEEDS TO BE GRADED IN THE FUTURE, IT'S NOT AN UNEXPECTED THING FOR THE SITE DEVELOPMENT.

IT'S NOT LIKE BUILDINGS WILL HAVE TO BE MOVED OR DEMOLISHED, WILL PLAN FOR ALL OF THAT NOW.

TRYING TO THINK ON THE FLY.

IT'D BE GOOD TO ASK THE APPLICANT AS WELL THE SAME QUESTION BECAUSE I THINK THEY'VE THOUGHT ABOUT THIS A LOT MORE THAN WE HAVE HERE.

PERFECT. COST, THERE'S OBVIOUSLY UNCERTAINTY.

WE DON'T KNOW WHEN THIS WILL BE NEEDED.

WE THINK IT WILL BE NEEDED IN THE FUTURE.

AT SOME POINT IT'S ON THE REGIONAL PLAN AND CONTINUES TO BE ON A REASONABLE PLAN, BUT THERE'S DEFINITELY UNCERTAINTY.

IT'S NOT A GUARANTEE.

THAT'S A BIG PLUS OF NOT DOING ANYTHING NOW IS WE JUST DON'T KNOW FOR SURE.

I CAN'T THINK OF ANYTHING ELSE REALLY CRITICAL AT THIS MOMENT. GOT ANYTHING.

>> THANK YOU. TIFFANY, COULD SOMEONE FROM MAYBE STORMWATER OR WATER SERVICES SPEAK TO ANY POTENTIAL MAINTENANCE ISSUES OR ANY POTENTIAL PROBLEMS CONCERNS WITH HAVING THE APPROACH ALREADY GRADED BUT NOT CONNECTING TO ANYTHING UNDER I17.

>> I APOLOGIZE. I WAS WORKING ON SOMETHING ELSE.

ARE WE TALKING ABOUT THE DRAINAGE THAT GOES UNDER I17?

>> FOR DEGRADE FOR THE EVENTUAL UNDERPASS.

>> WITH THAT, CAN YOU ASK YOUR QUESTION AGAIN?

>> I CERTAINLY CAN.

THERE'S A QUESTION ABOUT WHETHER TO GO AHEAD AND GRADE FOR THE FUTURE UNDERPASS UNDER 17, OR TO COMMIT THE MONEY TO DO IT LATER.

MY QUESTION IS, WHAT ARE PROS AND CONS OF DOING IT NOW VERSUS DOING IT LATER? SPECIFICALLY, WHAT WOULD BE CONCERNS FROM WATER SERVICES ABOUT INFRASTRUCTURE, POTENTIAL FLOODING, ANY MAINTENANCE ISSUES IF IT WERE TO BE GRADED NOW.

>> NOT BEING FAMILIAR WITH THE GRADING IN THAT AREA.

ONE, YES, WE WOULD HAVE TO MAKE SURE THAT IT DRAINS.

WE DON'T WANT TO AND DON'T ALLOW FOR PUMPS TO BE PUT IN FOR STORMWATER ON A GENERAL BASIS.

WE DO ON CERTAIN OCCASIONS.

THAT'S ONE ASPECT AS IT PERTAINS TO STORMWATER FOR THE WATER AND SEWER FACILITIES, SPECIFICALLY.

THERE ARE WATER AND SEWER FACILITIES CONSTRUCTED AT

[02:20:01]

THIS INTERSECTION OR WILL BE CONSTRUCTED AT THIS INTERSECTION.

IF THEY ARE CONSTRUCTED WITH THE INTERSECTION AT A HIGHER LEVEL TODAY, AND THERE'S FUTURE PLANS TO LOWER THAT INTERSECTION.

ALL OF THOSE UTILITIES WOULD HAVE TO BE LOWERED AS WELL WHEN THE INTERSECTION IS REGRADED OR RECONSTRUCTED.

THERE WOULD BE AN ADDITIONAL COST ASSOCIATED WITH CONSTRUCTING IT AT A HIGHER ELEVATION TODAY AND THEN REBUILDING THAT IN THE FUTURE.

YOU'D HAVE THOSE UTILITY CONFLICTS THAT YOU'D HAVE TO DEAL WITH. DOES THAT ANSWER YOUR QUESTION?

>> WOULD THE COSTS OF THOSE BE BORN BY THE APPLICANT?

>> I WOULD ASSUME SO.

I DON'T KNOW THE MECHANISM BY WHICH THEY WOULD BE REQUIRED TO POST AN ASSURANCE OR SOMETHING LIKE THAT.

BUT THAT WOULD DEFINITELY HAVE TO BE INCLUDED AS PART OF THE COST TO RECONSTRUCT THAT INTERSECTION.

>> THANK YOU. DO YOU HAVE ANY CONCERNS ABOUT FLOODING OR MAINTENANCE ISSUES IF IT WERE TO BE GRADED TO WHEN THE PROJECT IS FIRST CONSTRUCTED?

>> AGAIN, I'M NOT FAMILIAR ENOUGH WITH THAT INTERSECTION OR THAT PROPOSED INTERSECTION TO KNOW WHERE IT WOULD RAIN TODAY? I THERE ARE NOT ANY FLOODING CONCERNS IN THAT AREA TODAY AND ANY POTENTIAL FLOODING ISSUES WOULD NEED TO BE MITIGATED AS PART OF THE PROJECT.

THAT WOULD BE SOMETHING WE WOULD ADDRESS AS PART OF CIVIL PLAN REVIEW.

>> THAT'S PART OF IT. THAT'S FUNDAMENTALLY THE ISSUE IS THAT WE HAVEN'T GOTTEN THAT FAR IN THE ENGINEERING DESIGN OF WHAT THAT PARTICULAR OR HOW THAT INTERSECTION WOULD WORK WITH THE GRADING.

WE HAVE A LOT OF PRESUPPOSITIONS ABOUT WHAT THAT MIGHT LOOK LIKE, BUT WE HAVEN'T GONE THROUGH THAT PROCESS OF VETTING THAT CIVIL DESIGN.

>> WHERE DOES THAT FALL IN THE PROCESS? WOULD THAT COME AFTER THE PROJECT WAS REJECTED OR APPROVED? I GUESS IT WOULDN'T COME AFTER IF THE PROJECT WASN'T APPROVED, BUT IT WOULD COME AFTER. IS THAT CORRECT?

>> GENERALLY THE CIVIL PLANS ARE COMPLETED AFTER WE HAVEN'T APPROVED PRELIMINARY PLAT, SO THAT PRELIMINARY PLAT IS GOING TO GO THROUGH PLANNING AND ZONING COMMISSION AND COME THROUGH YOU AS CITY COUNCIL.

THERE MAY BE NECESSARY ENGINEERING MODIFICATION REQUIREMENTS AS PART OF THAT PROCESS.

WE WOULD ALSO BRING THOSE FORWARD AS PART OF THAT REVIEW.

BUT YES, THAT DETAILED CIVIL PLAN PRETTY MUCH HAPPENS BETWEEN PRELIMINARY PLAT AND FINAL PLAT.

PART OF WHAT'S BEEN THE STRUGGLE FOR US AS DETERMINATING WHAT IS GOING TO BE THE FINAL DESIGN OF THIS INTERSECTION.

IT'S BEEN DELAYING AS BACK-AND-FORTH IN THE PRELIMINARY IN TERMS OF JUMPING INTO THAT FULL CIVIL PLAN DESIGN.

WE'VE HAD SOME PRELIMINARY WORK DONE.

BUT UNTIL I THINK THAT FINAL ENGINEERING DESIGN IS DONE AND WE'RE IN THAT MIDST.

WHILE WE HAVE THIS VERY SPECIFIC ANSWER FOR YOU.

>> I'D LIKE TO SEE SOME ADDITIONAL INFORMATION ON THAT BECAUSE I THINK THAT THAT'S A CRUCIAL QUESTION.

THANK YOU. COUNCIL MEMBER MCCARTHY.

>> DO YOU MIND IF I ADD ONE MORE THING?

>> NO, PLEASE DO.

>> ONE THAT I THINK IS A THING THAT WE NEED TO CONSIDER IS IF WE DO NOT BUILD THIS INTERSECTION AT GRADES TODAY AND IT COMES BACK IN THE FUTURE AND WE NEED TO BUILD IT.

THEN WE NEED TO TALK ABOUT TRAFFIC CONTROL, CLOSING DOWN BEULAH TO DROP IT TO FEET.

I'M JUST THROWING OUT OF MY HEAD FROM MEMORY.

AMBULANCES GETTING TO THE HOSPITAL FOR THIS CRAP TRAFFIC CONTROL AND FOR THIS CONSTRUCTION IN THE FUTURE WHEN THIS NEEDS TO BE BUILT.

JUST TRYING TO THINK ABOUT IT AND THE DIFFICULTIES OF DOING THAT. THANK YOU.

>> THANK YOU. COUNCIL MCCATHY.

>> THANK YOU, MAYOR. I'VE DONE SOME THINKING AND ASKING QUESTIONS ABOUT THIS INTERSECTION.

ONE OF MY THOUGHTS WAS, MAYBE WE DON'T EVEN NEED TO BUILD THIS UNDERPASS.

I WILL SAY THAT I HAVE TALKED TO CITY STAFF AND I'VE TALKED TO METRO PLANS STAFF.

THERE SEEMS TO BE A STRONG CONSENSUS THAT IT MAY NOT BE NEEDED AT THIS POINT IN TIME, BUT IN THE NEAR FUTURE WHEN THE HOSPITALS BILL AND SOME OTHER THINGS THAT WE ANTICIPATE, IT DEFINITELY WILL BE REQUIRED.

>> THANK YOU COUNCIL MEMBER.

COUNCIL MEMBER, [INAUDIBLE].

>> TIFFANY, THANK YOU SO MUCH FOR ALL OF YOUR WORK AND STAFF.

I CAN'T BELIEVE THAT WE'RE HERE IN THE PRESENTATION AS WELL THOUGHT OUT, AND I APPRECIATE THAT.

I HAVE A QUESTION ON THE SOLAR, DO WE HAVE A SPECIFIC TIMELINE?

[02:25:01]

IT'S A NEW ADDED BONUS TO THE PROJECT AND ONE THAT I WAS GOING TO ASK FOR.

HAPPY ON THAT, BUT I WOULD LIKE TO HEAR THE TIMELINE AND IF IT'S DEFINITIVE.

>> SURE. THE CURRENT COMMITMENT IS 2030, KNOWING THAT THE HOSPITAL IS ANTICIPATED AROUND 2027.

YOU'RE LOOKING AT THREE YEARS AFTER OPENING OF THE HOSPITAL.

>> THANK YOU. ANY OTHER QUESTIONS? SO THANK YOU, TIFFANY AND STAFF.

SO STAFF'S PRESENTATION WAS 45 MINUTES AND THE APPLICANT IS GIVEN 45 MINUTES FOR THEIR PRESENTATION.

I'M ANTICIPATING THAT WE WILL TAKE A BREAK AFTER THE APPLICANT'S PRESENTATION AND THEN COME MAYBE AFTER COUNSEL ASK QUESTIONS, AND THEN COME BACK FOR PUBLIC COMMENT.

>> THANK YOU, MAYOR AND COUNCIL, AND THANK YOU TO TIFFANY, ALL THE CITY STAFF THAT HAVE WORKED DILIGENTLY AND TIRELESSLY ON THIS PROJECT AND MADE SURE THAT WE'VE CAME TO A MUCH BETTER SOLUTION THROUGHOUT THE TIME.

MY NAME IS JOSH TINKLE, I'M THE ACTING CHIEF EXECUTIVE OFFICER FOR NORTHERN ARIZONA HEALTHCARE.

AND IT'S MY ABSOLUTE PLEASURE TO BE HERE TODAY TALKING ABOUT THIS PROJECT.

GOING TO BE JOINED TODAY BY STEVE EISS, OUR VICE PRESIDENT OF CONSTRUCTION AND REAL ESTATE DEVELOPMENT.

COLLEEN MARING, OUR CHIEF LEGAL COUNSEL.

NOLAN ROME, WSP, WHO IS OUR CARBON NEUTRALITY AND ENERGY EXPERT AND JOHN NIZIOLEK, WHO IS WITH HKS, THE ARCHITECTURE FIRM.

SO WE AIM TO REALLY DRIVE THIS PROJECT BASED ON OUR FEEDBACK FROM PLANNING AND ZONING AND CLEAR UP SOME THINGS AS AN ORGANIZATION.

SO NAH, WE ARE A NOT-FOR-PROFIT HEALTH CARE SYSTEM.

WE DO SERVE IN THE INTEREST OF THE PUBLIC AND PROVIDE A FULL SPECTRUM OF SERVICES OF CARE INCLUDING EDUCATION, PREVENTION, AND TREATMENT.

WE ARE THE ONLY LEVEL 1 TRAUMA CENTER TODAY NORTH OF THE GREATER PHOENIX AREA.

AND WE PROVIDE LIFE AND LIMB SALVAGING OR SAVING CARE FOR THOUSANDS IN THE REGION.

WE EMPLOY APPROXIMATELY 4,000 PEOPLE THROUGHOUT FLAGSTAFF AND THE VERDE VALLEY.

AND WE HAVE CAREGIVERS TO MORE THAN 700,000 RESIDENTS AND MILLIONS OF TOURISTS ACROSS NORTHERN ARIZONA EACH YEAR.

AND THAT'LL BECOME IMPORTANT AS WE TALK A LITTLE BIT ABOUT BEING A REGIONAL REFERRAL CENTER AND A REGIONAL CENTER FOR PROVIDING CARE.

WE ALSO ARE IN AN EMERGENCY DEPARTMENT AND WE ARE OPEN TO ALL CITIZENS WHO SEEK CARE WITH OUR FACILITY REGARDLESS OF OUR ABILITY TO PAY.

WE'RE AN INDEPENDENT NOT-FOR-PROFIT HEALTHCARE ORGANIZATION, SO WE'RE NOT PART OF A LARGER CONGLOMERATION.

WE DO NOT EXIST TO HAVE PROFITS REINVESTED FOR SHAREHOLDERS, 100% OF THE PROFITS THAT WE'RE ABLE TO GENERATE AS AN ORGANIZATION ARE RE-INVESTED BACK IN THE FACILITIES, EMPLOYEES, EQUIPMENT, AND INFRASTRUCTURE THAT IT REQUIRES TO TAKE CARE OF OUR COMMUNITY AND OUR REGION.

WE ARE GOVERNED BY A VOLUNTEER, UNPAID BOARD OF DIRECTORS.

THERE'S PROBABLY SOME IN THE CROWD HERE AND THEY SPEND COUNTLESS HOURS MAKING SURE THAT NAH IS OPERATING IN ACCORDANCE WITH THE BEST INTERESTS OF THE COMMUNITIES THAT WE SERVICE.

AND JUST FOR CLARITY, NO OFFICERS OF THE COMPANY HAVE ANY FINANCIAL INTEREST IN THE COMPANY.

SO THERE I HAVE NO FINANCIAL INTEREST, NONE OF THE OFFICERS OF THE COMPANY HAVE ANY FINANCIAL INTERESTS AND WE DO NOT SEEK TO GAIN FINANCIALLY FROM THE DEVELOPMENT OF THIS PROJECT.

WE EXIST TO MAKE HEALTH CARE AVAILABLE TO ALL.

WE STRIVE TO COMBINE THE CAPABILITY PROVIDING WORLD-CLASS CARE WITH PROVIDING THE CARE FOR THOSE WHO DO NOT AND CANNOT AFFORD IT.

ABOUT 25% OF OUR PATIENTS THAT WE SERVICE AT ANY GIVEN TIME IN ANY GIVEN YEAR ARE CONSIDERED FINANCIALLY DISADVANTAGED.

AND ABOUT A THIRD OF THE PATIENTS AT FLAGSTAFF MEDICAL CENTER COME FROM TRIBAL NATIONS AND ARE MEMBERS OF NATIVE AMERICAN TRIBES.

APACHE AND NAVAJO COUNTIES ARE TWO BIG COUNTIES THAT WE SERVICE, ARE AMONG THE MOST IMPOVERISHED COUNTIES IN THE COUNTRY.

AND DISPROPORTIONAL AND HISTORICALLY UNDERSERVED AS A POPULATION.

IN FISCAL YEAR 2021 PROVIDED APPROXIMATELY $125 MILLION IN CARE TO PATIENTS WHO WOULD NOT HAVE BEEN ABLE TO AFFORD THOSE SERVICES OTHERWISE.

AND THAT'S CALCULATED REALLY FROM OUR FINANCIAL ASSISTANCE PROVIDED TO UNINSURED AND UNDERINSURED PATIENTS AT FLAGSTAFF MEDICAL CENTER AND VERDE VALLEY MEDICAL CENTER.

IN PARTNERSHIP WITH GOVERNMENT-ASSISTED PRIMARY CARE AND COMMUNITY HEALTH CARE SERVICES, WE PROVIDE A CONTINUUM OF CARE NOT FOUND ANYWHERE ELSE WITHIN OUR REGION.

AND WE DO SERVE A LARGE POPULATION.

I THINK YOU'VE HEARD IN OUR PREVIOUS PRESENTATIONS.

LAST YEAR ALONE, WE DEFERRED APPROXIMATELY 6,000 PATIENTS DUE TO PHYSICAL BED CAPACITY, NOT TO STAFF BED CAPACITY.

THAT NUMBER IS MUCH GREATER.

ABOUT 6,000 PATIENTS THAT WERE NOT ABLE TO BE TAKEN CARE

[02:30:03]

OF AT OUR CURRENT FACILITY DUE TO PHYSICAL BED CAPACITY.

AND WE'LL TALK A LITTLE BIT LATER ON ABOUT THE IMPROVEMENTS IN THAT OVERALL BED CAPACITY.

FLAGSTAFF IS A REGIONAL HUB FOR NORTHERN ARIZONA IN MANY, MANY WAYS IN ADDITION TO HEALTH CARE.

WE'RE REGIONAL HUB FOR EDUCATION WITH NORTHERN ARIZONA UNIVERSITY, COCONINO COMMUNITY COLLEGE.

HOW'S THE ONLY REGIONAL AIRPORT.

WE HAVE LOCAL GOVERNMENT HERE.

TOURISM TO GRAND CANYON, ARIZONA SNOWBOWL FORT TUTHILL COUNTY PARK.

AND OBVIOUSLY, HEALTHCARE, FLAGSTAFF MEDICAL CENTER, NORTH COUNTRY HEALTHCARE, WHICH IS ONE OF THE LARGEST FQHCS IN THE COUNTRY AND SACRED PEAKS HEALTH CENTER.

AS WE LOOK AT FUTURE GROWTH AND THE FUTURE POPULATION OF NOT ONLY FLAGSTAFF COCONINO COUNTY AND THE REGION THAT WE SERVICE.

THESE FIGURES CAME FROM US CENSUS DATA, ARIZONA POPULATION PROJECTIONS, MARICOPA COUNTY, APACHE COUNTY, MOJAVE, SO ON AND SO FORTH.

AND WHAT YOU CAN SEE FROM THE TABLE IS OUR ACTUAL POPULATION IN THE REGION THAT WE SERVICE ROUGHLY IN 2020 WAS ABOUT 767,000.

SO WE SAY APPROXIMATELY 700,000.

WE'RE TALKING ABOUT A PROJECT THAT'S GOING TO LAST FOR THE NEXT 20, 30, 40, 50 YEARS.

AND AS A TEAM GOES THROUGH, YOU'LL SEE THE EXPANSION CAPABILITIES THAT WE BELIEVE WE WILL NEED TO BE ABLE TO CONTINUE TO SERVICE OUR REGION.

AND BY 2050, IT'S ESTIMATED THAT ABOUT 1.9 MILLION INDIVIDUALS WHO LIVE IN NORTHERN ARIZONA ALONE.

AND UNFORTUNATELY, IT'S ONLY 27 YEARS AWAY TO GET TO 2050 NOW.

SO NOW'S THE TIME TO MOVE ON A PROJECT LIKE THIS.

WE'VE HAD A LOT OF DISCUSSION ABOUT THE EXISTING CAMPUS AND WHY CAN'T WE STAY ON THE EXISTING CAMPUS.

WE'VE DONE EXTENSIVE STUDIES ON 1,200 NORTH BEAVER.

IT IS NOT SUITED FOR 21ST-CENTURY CARE.

SO INSURMOUNTABLE CHALLENGES INCLUDE WASH, PUBLIC ROADS, AND ELEVATION DIFFERENCES.

WE CURRENTLY HAVE A BISECTED AND IF WE WERE TO EXPAND, WE COULD HAVE A TRISECTED INPATIENT, OUTPATIENT SERVICES WHICH PREVENTS TRUE INTEGRATION, MAGNIFIES WAYFINDING CHALLENGES, CONFUSION, PARTICULARLY IN TIMES OF STRESS FOR OUR PATIENTS.

AND IT GIVES US LIMITED EXPANSION POPULATION OPPORTUNITIES.

IT DOES NOT APPROVE OUR OPERATIONAL EFFICIENCIES AND FURTHER COMPOUNDS SOME OF THOSE CHALLENGES.

MULTIPLE DEPARTMENTS WE LEFT UNIMPROVED AND UNDERSIZED FOR EXPANSION OF INPATIENT BEDS.

CAMPUS WOULD BE THEN FULLY BUILT OUT WITH NO FURTHER EXPANSION OPPORTUNITIES.

AND THE PLAN THAT WE COULD DO ON THIS PARTICULAR CAMPUS PROVIDES US WITH EIGHT ADDITIONAL INPATIENT BEDS WHEN WE GO TO PRIVATE OCCUPANCY.

AND IT'S OBVIOUSLY UNTENABLE TO DO THAT OVER THE YEARS WITH THE AMOUNT OF DISRUPTION THAT WOULD ENSUE AND OCCUR.

WE ALSO LOOKED AT ALL THE OBSTACLES AT 1,200 NORTH BEAVER AND ADDITION TO A SPLIT CAMPUS OPTION, AS WELL AS A GREENFIELD OPTION.

AND OVER MANY YEARS OF WORK AND HARD WORK, WE BELIEVE THAT 1,120 PURPLE SAGE IS THE BEST OPTION FOR THE COMMUNITY.

AS WE MENTIONED, MULTIPLE ENTRANCES ACROSS THREE DIFFERENT ROADS.

THE OPERATIONAL EFFICIENCIES.

THE CENTRAL PLAN WOULD CONTINUE TO BE DECOUPLED, REDUCING OUR ENERGY EFFICIENCY AND PREVENTING ACHIEVEMENT OF CARBON NEUTRALITY.

WE'VE TALKED A LOT ABOUT CARBON NEUTRALITY AND PLANNING AND ZONING.

THE ONE CERTAINTY OF NAH NOT BEING ABLE TO MEET THAT GOAL OF CARBON NEUTRALITY IS STAYING IN ITS EXISTING LOCATION.

SO IF WE STAY IN THAT EXIST LOCATION WE CANNOT MEET THE 2030 GOAL AS IT STANDS TODAY.

AS I MENTIONED, OUR ED WOULD REMAIN AS IS, THAT'S A BIG PAIN POINT FOR US AS AN ORGANIZATION WITH NO EXPANSION OPPORTUNITY.

AND THE ADDITIONAL TOWER WOULD ALLOW THE CURRENT CAMPUS ALLOW FOR PRIVATE ROOMS. BUT AGAIN, WE JUST GET EIGHT ADDITIONAL BEDS.

AND IF YOU WANT TO DRAW YOUR ATTENTION TO THE GRAPH, IT REALLY LOOKS AT WHAT WOULD THE TIME TAKE TO STAY, OR TO SPLIT CAMPUS LOOK LIKE.

WHAT IS THE COST ESTIMATES? WHAT AREAS ARE WE FOCUSING ON? AND WHAT AREAS COULD WE POTENTIALLY ACHIEVE? SO I'M LOOKING FORWARD TO A ROBUST AND LONG DISCUSSION AND DIALOGUE TONIGHT, AND I'M SURE THAT WE'LL HAVE LOTS OF GREAT THINGS.

SO I'LL TURN IT OVER TO STEVE WHO WILL START TO TAKE US THROUGH THE REST OF THE PRESENTATION. THANK YOU.

>> THANK YOU, JOSH. THANK YOU, MAYOR AND COUNCIL FOR HAVING US THIS EVENING.

COUNCILWOMAN, SWEET, I THINK YOU NAILED IT BEFORE WHEN YOU SAID WE'RE FINALLY HERE.

THIS HAS BEEN A REALLY AMAZING JOURNEY THAT WE'VE BEEN ON FOR 25 MONTHS SINCE NAH ORIGINALLY SUBMITTED THEIR APPLICATION.

I THINK IT'S REALLY SHOWN WHAT COMMUNITY OUTREACH AND PARTNERSHIP COULD LOOK LIKE BETWEEN A PRIVATE DEVELOPMENT ENTITY AND STAFF.

AND THANK YOU TO TIFFANY AND HER TEAM AND ALL THE WORK SHE'S DONE AND THANK YOU TO EVERYBODY UP ON THE DAIS RIGHT NOW FOR ALL THE COORDINATION AND COOPERATION THAT YOU'VE GIVEN US TO NOW, I HOPE WHAT YOU SEE IN OUR PRESENTATION TONIGHT IS THAT WE HAVE BEEN LISTENING NOT

[02:35:04]

ONLY TO OUR POLITICAL AND COMMUNITY LEADERS BUT COMMUNITY RESIDENTS IN TOTALITY.

WE HAVE BEEN OUT AND YOU'LL SEE LATER ALL OF THE MEETINGS AND FEEDBACK WE'VE RECEIVED, BUT WE HAVE LISTENED AND MADE MODIFICATIONS TO MAKE SURE THIS IS A FANTASTIC PROJECT FOR NOT ONLY THE RESIDENTS OF FLAGSTAFF BUT ALSO THE REGION WE SERVE AS NORTHERN ARIZONA.

SO PUT THIS UP FOR A SECOND.

I THINK IT'S IMPORTANT THAT WE DO SAY THAT AS NORTHERN ARIZONA HEALTHCARE, WE DO SERVE THE ENTIRE REGION OF NORTHERN ARIZONA, 66% OF OUR PATIENTS CURRENTLY COME FROM OUTSIDE OF FLAGSTAFF PROPER.

AND SO WHEN WE LOOK AT THAT AND ALSO LOOK IN COLLABORATION AND PARTNERSHIP WITH THE CITY OF FLAGSTAFF, WE WANTED TO MAKE SURE WE PROVIDED A LOCATION THAT WAS ADEQUATE FOR ALL OF THE COMMUNITY WE SERVE.

SO THIS SLIDE SHOWS, YOU'LL SEE IT DOWN IN THE BOTTOM, LOWER-LEFT, THE NEW PARCEL FOR THE NAH HEALTH VILLAGE.

AND I THINK THIS SLIDE SHOWS THE FUTURE GROWTH OF FLAGSTAFF IN ACCORDANCE WITH THE CURRENT REGIONAL PLAN AS WELL AS COUNCIL'S APPROVAL OF THE GWP CORRIDOR.

SO WHAT YOU SEE THERE IN YELLOW IS THE GWP CORRIDOR ALONG WITH THE BEULAH TO WOODY MOUNTAIN ROAD NETWORK THAT WOULD BE PART OF THE NAH VILLAGE AND THAT FULLY CONNECTING.

AND WHEN WE OVERLAY THAT WITH THE 2030 GROWTH PLAN FOR THE CITY OF FLAGSTAFF, YOU CAN SEE THAT THE MAJORITY OF THE PROJECTED GROWTH FROM A DEVELOPMENT PERSPECTIVE IS INTENDED TO BE IN THIS SOUTHERN PORTION OF FLAGSTAFF.

SO WE FEEL THAT WITH THAT GROWTH SOUTH OF THE I40, THIS PLANNING FURTHER CONTRIBUTES TO MAKING THE PROPOSED LOCATION WITH ACCESS FROM THE I17 AND I40 FOR RESIDENTS OF NORTHERN ARIZONA THE CORRECT CHOICE OF AVAILABLE LANDS TO BUILD THIS FACILITY.

THERE'S A LOT WE PLAN ON DOING IN THIS FACILITY.

WE'VE HAD A LOT OF DISCUSSION IN PREVIOUS PRESENTATIONS TO NOT ONLY COUNSEL THE COMMUNITY ON SOME OF THE CHALLENGES WITH THE EXISTING CAMPUS AND SOME OF THE THINGS WE FEEL WE CAN BRING FROM A WORLD-CLASS HEALTHCARE PERSPECTIVE, AND THAT RANGES FROM EVERYTHING TO SINGLE OCCUPANCY ROOMS TO ALL OF OUR ROOMS HAVING ACCESS TO NATURAL DAYLIGHT, LARGER OPERATING ROOMS TO BE ABLE TO HANDLE MORE COMPLEX PROCEDURES AND CONTINUE TO RECRUIT AND RETAIN PHYSICIANS.

BUT WE WANT TO SPECIFICALLY TALK ABOUT OUR EMERGENCY DEPARTMENT BECAUSE I THINK OUR EMERGENCY DEPARTMENT IS SOMETHING THAT ALMOST EVERYBODY IN THIS ROOM CAN CONNECT TO.

ODDS ARE MOST OF YOU UP ON THE [INAUDIBLE] AND MOST OF YOU IN THIS ROOM HAVE EITHER BEEN PATIENTS IN OUR EMERGENCY DEPARTMENT OR BEEN IN THE EMERGENCY DEPARTMENT WITH LOVED ONES.

IT IS ADMITTEDLY A HARD PLACE TO BE A PATIENT IN.

I THINK IF OUR ED STAFF WERE HERE, THEY WOULD TELL YOU IT'S ADMITTEDLY A DIFFICULT PLACE TO GIVE PATIENT CARE IN.

AND ALTHOUGH WE ARE BLESSED TO HAVE AN AMAZING CLINICAL STAFF THAT DOES A GREAT JOB IN THE CONFINES OF THAT EXISTING EMERGENCY DEPARTMENT, I THINK THEY DESERVE BETTER AND I THINK THE REGION OF NORTHERN ARIZONA DESERVES BETTER.

SO THE ED IS ONE OF THE THINGS WE'VE REALLY FOCUSED ON.

WHETHER MOST REALIZE IT OR NOT, THE EMERGENCY DEPARTMENT IS REALLY THE FRONT DOOR OF A HOSPITAL.

MORE PEOPLE COME THROUGH THE EMERGENCY DEPARTMENT TO ENTER INTO OUR HOSPITAL THAN THEY DO COME THROUGH THE FRONT DOOR OF OUR HOSPITAL.

WE'VE SPENT QUITE A BIT OF TIME WORKING ON REALLY OPTIMIZING THAT ED LAYOUT TO MAKE IT GREAT FOR THE COMMUNITY.

WHAT WE'VE LANDED ON IS A REALLY OPTIMAL LAYOUT AND DESIGN OF AN ED BASED ON THE NEEDS OF OUR PATIENTS.

OUR ED RIGHT NOW WAS BUILT IN AN OLDER FASHION, WHICH IS A SERIES OF PODS THAT CANNOT REALLY GROW IN ANY ONE DIRECTION.

OUR NEW EMERGENCY DEPARTMENT WILL PROVIDE A LINEAR DESIGN.

IT'LL HAVE MORE DIRECT OBSERVATION OF PATIENTS AND ACCESS FOR CAREGIVERS WITHOUT COMPROMISING THE ABILITY FOR THE CARE TEAM TO COLLABORATE.

ALLOWS FOR FLEXING UP AND DOWN OF THE OVERALL DEPARTMENT AS PATIENT VOLUMES AND ACUITY CHANGE THROUGHOUT THE DAY.

THERE IS ACTUALLY A RHYME AND REASON TO HAVE AN EMERGENCY DEPARTMENT WORKS.

WE SEE PRETTY SIMILAR TRAFFIC PATTERNS THROUGHOUT THE DAY, AND SO WE DO UNDERSTAND WHERE THOSE EFFICIENCIES LIVE FROM A STAFFING AND CLINICAL PERSPECTIVE.

I THINK MORE IMPORTANTLY, WE'RE DESIGNING THIS DEPARTMENT AND ALL THE DEPARTMENTS OF THE NEW FACILITY TO HAVE A FUTURE GROWTH EXPANSION AS THE LINE CAN SIMPLY EXTEND TO THE NORTH.

WE'RE NOT GOING TO GET INTO THE DESIGN OF EVERY DEPARTMENT, BUT WE HAVE THOUGHTFULLY GONE THROUGH AND DESIGNED THE GROWTH OF INPATIENT BEDS, SO THAT'S OUR ICU AND OUR MED SURGE.

WE'VE DESIGNED THE GROWTH OF OUR IMAGING AND SURGICAL DEPARTMENTS AS WELL AS SOME OF OUR ANCILLARY DEPARTMENTS LIKE LAB, IMAGING, AND PHARMACY SO THAT WE CAN CONTINUE TO RESPOND TO THE GROWTH IN POPULATION THAT JOSH SHOWED ON HIS PREVIOUS SLIDE.

FROM A PATIENT SEGMENTATION PERSPECTIVE, RIGHT NOW WE STRUGGLE WITH THAT.

WHETHER YOU'RE A PEDIATRIC PATIENT OR AN ADULT PATIENT, WE REALLY HAVE NO WAY TO SEGMENT OUR PATIENT POPULATIONS.

OUR NEW DESIGN WILL HAVE MORE ISOLATED EXAM ROOMS FOR INTOXICATED PATIENTS, REDUCING THE RISK OF CROSS-PATIENT INCIDENTS.

[02:40:03]

I THINK ONE OF THE BEST PARTS OF THIS DESIGN IS THE INTRODUCTION OF QUICK-LOOK BAYS CLOSE TO THE ENTRANCE TO SPEED THE TRIAGE AND TREATMENT OF LOW-ACUITY VISITS.

BY LOW ACUITY, I MEAN PATIENTS WHO DO NEED CARE FROM US, BUT THEY AREN'T IN THIS HIGH ACUITY CARE WHERE THEY'RE MOST LIKELY GOING TO TURN INTO AN INPATIENT SETTING.

THESE ARE PEOPLE WHO COME IN WITH SPRAINS, BAD CUTS, BRUISES, ETC.

THE KIND OF PATIENTS THAT HONESTLY SIT IN OUR WAITING ROOM FOR QUITE SOME TIME RIGHT NOW BECAUSE WE KNOW THEY CAN WAIT FROM AN ACUITY PERSPECTIVE, WE PLAN ON GETTING THEM THROUGH THIS NEW EMERGENCY DEPARTMENT QUICKER.

WITH THAT, I'M GOING TO TURN IT OVER TO OUR ARCHITECT SO HE CAN DISCUSS OUR BUILDING HEIGHT AND SOME OTHERWISE.

>> THANKS, STEVE. SO WHAT YOU'RE LOOKING AT HERE, THIS IS, IT'S CALLED A STACKING DIAGRAM.

WE USE THIS TO STUDY THE BUILDING HEIGHT OF A HOSPITAL.

ALL OF THE COLORED BLOCKS THAT YOU SEE HERE REPRESENT EVERY DEPARTMENT IN A HOSPITAL.

THE RED ONE ON THE RIGHT IS THE ED THAT STEVE JUST TALKED ABOUT.

IT IS ON THE END SO THAT IT COULD EASILY EXPAND INCREMENTALLY SO IT DOESN'T DISRUPT ANY CARE GIVING GOING ON AT THE TIME.

THE BIG BLACK LINE THAT YOU SEE HERE IS GRADE OR GROUND LEVEL.

SO YOU CAN SEE OUR SITE SLOPES, WHICH WAS VERY IMPORTANT WHEN WE STUDIED THE HEIGHT.

AND WHEN WE DESIGN HEALTHCARE FACILITIES, REALLY, THE FLOW OF PATIENTS, FAMILY MEMBERS, PROVIDERS ARE ALL FOCUSED ON.

WE FOCUSED ON REDUCTION OF WEIGHTING TIMES, THE MINIMIZATION OF WALKING DISTANCES, HOW DO WE DECREASE OR ALLEVIATE STRESS, AND MOST IMPORTANTLY, ELIMINATING WASTE.

THAT'S ONE OF THE REAL DRIVERS WITH THIS PLAN IS TO ELIMINATE WASTE TO MAKE THIS FACILITY MORE EFFICIENT COMPARED TO ITS CURRENT LOCATION.

MOST OF THE DEPARTMENTS THAT WE PUT INTO A HOSPITAL CAN BE DONE IN A HORIZONTAL FASHION TO REDUCE ITS HEIGHT, AND THAT'S WHAT YOU SEE ACROSS THE BLOCK AT THE BOTTOM WITH ONE TO TWO FLOORS, IT'S THREE ON ONE OF THE BUILDINGS, BUT THE SLIGHT SITE DOES SLOPE.

AND WE SPENT A LOT OF TIME TO MAKE SURE THAT THE HEIGHT OF THE BUILDING WAS AS LOW AS POSSIBLE TO MAXIMIZE VIEWS OF THE TREES AND THE MOUNTAIN BEHIND THE BILLING WHEN YOU APPROACH IT FROM THE EAST.

REALLY, THE ONLY TALL PART OF THE BUILDING IS THE PATIENT TOWER, AND THAT'S WHAT YOU SEE WITH THE BLUE STACK DEPARTMENTS GOING VERTICALLY.

THAT'S REALLY WHERE THE PATIENTS ARE KEPT IN THEIR ROOMS. I SEE YOU IN MED SURGE.

BY STACKING THOSE ROOMS VERTICALLY, THAT'S HOW WE ELIMINATE THOSE WALKING DISTANCES.

IT'S A SHORT ELEVATOR RIDE TO EVERY TREATMENT THEY NEED, FROM SURGERY TO IMAGING TO OTHER SERVICES.

ADDITIONALLY, BY THAT SMALLER FOOTPRINT, IT'S ONLY ABOUT 17 PERCENT OF THIS BUILDING SQUARE FOOTAGE IS TALL.

WE'VE BEEN ABLE TO ACCOMMODATE HALF OF THE ROOMS LOOKING AT SAN FRANCISCO PEAK.

BY GETTING UP INTO THAT TREE CANOPY ZONE AND THEN ABOVE IT, WE'RE LOOKING AT THE MOUNTAIN.

TO THE SOUTH, IT'S STILL BEAUTIFUL, LOOKING DOWN ACROSS THE VISTA, THE CAMPUS, AND THEN LOOKING SOUTH TOWARDS CAMP VERDE.

THE ONE THING THAT WE REALLY DID STUDY WITH THIS IS TO TRY TO LOWER THE HEIGHT OF THE TOWER.

WE STUDIED IT, WE DID REDUCE THE FLORIDA FLOOR HEIGHTS, BUT MORE IMPORTANTLY, WHAT WE DID IS WE CREATED A LONGER CHASSIS OF BEDS SO THAT EACH FLOOR IS 54 BEDS FROM FLOORS TWO THROUGH FIVE.

IN DOING THAT, WHICH IS A 30-BED UNIT ON THE WEST SIDE, WE'RE ABLE TO LOWER THE EAST SIDE TOWER TO ONLY FIVE FLOORS.

THAT IS YOU APPROACH IT FROM BEULAH, IT DOESN'T SEEM AS HIGH AS IT IS OR AS HIGH AS YOU THINK IT WOULD BE AS YOU GET UP TO IT BECAUSE WE STEP IT COMING DOWN TOWARDS THE ENTRY.

THAT'S REALLY THE STUDY AND THE HEIGHT TO GET IT LOWER.

HOPEFULLY, IF YOU HAVE ANY QUESTIONS YOU CAN ASK ME.

>> THANKS JOHN. AS YOU HAD HEARD EARLIER FROM STAFF, CARBON NEUTRALITY IS NOT A REQUIRED FINDING FOR THIS PARTICULAR CASE.

HOWEVER, THAT DOESN'T MEAN THAT NAH ISN'T LISTENING AND IT DOESN'T MEAN THAT WE'RE NOT TAKING THIS SERIOUSLY.

I'M GOING TO SPEND A LITTLE BIT OF TIME GOING THROUGH A COUPLE OF THINGS THAT WE WERE THINKING THROUGH PRIOR TO ANY OF OUR MEETINGS AND A COUPLE OF THINGS WE'VE BEEN THINKING THROUGH SINCE WE HEARD SOME OF THE COMMUNITY INPUT AND INPUT FROM PLANNING AND ZONING DURING ALL OF OUR MEETINGS.

FOR STARTERS, JUST A BRIEF REINTRODUCTION TO THE FLAGSTAFF CLIMATE ACTION & ADOPTION PLAN THAT WAS ADOPTED ON OCTOBER 27TH OF 2020.

THERE ARE MULTIPLE DIFFERENT WAYS THAT THE CITY PLANS ON GETTING TO THIS.

BUT I THINK IT'S IMPORTANT TO NOTE THAT WE CAN HELP IN SOME OF THOSE CASES AND WE PLAN ON HELPING IN SOME OF THOSE CASES.

THE FIRST OF THOSE BEING AIR TRAVEL.

[02:45:01]

OUR HIGHER BED CAPACITY WILL HELP US WITH THE 6,000 DEFERRALS JOSHUA WAS SPEAKING OF EARLY.

REDUCING UPWARDS OF 50% OF PATIENT FLOW INTO PHOENIX, LAS VEGAS, AND ALBUQUERQUE.

IN THAT ACTION PLAN IN 2020, THERE WAS A COMMERCIAL ENERGY TARGET OF NATURAL GAS REDUCTION BY 40% AND ELECTRICITY REDUCTION BY 20%.

OUR PRELIMINARY DESIGN ESTIMATES FOR THE NEW CAMPUS SHOW US AT A 78% REDUCTION.

SO ALMOST DOUBLE THE PROPOSED REDUCTION OF GAS FROM EXISTING CAMPUS TO NEW CAMPUS AND A 45% REDUCTION IN OVERALL ENERGY CONSUMPTION, SO DOUBLE WHAT THE ORIGINAL PLAN WAS BACK IN 2020.

JUST TO SET THE TONE FOR WHERE NAH IS COMING FROM, FROM A PARTNERSHIP PERSPECTIVE AS IT PERTAINS TO SUSTAINABILITY, NAH HAS BEEN FOCUSED ON SUSTAINABILITY SINCE THE BEGINNING OF THIS PROJECT.

AT THE SAME TIME, NAH, AS A NON-PROFIT, IS TRYING TO ACHIEVE SUSTAINABILITY GOALS WITHOUT COMPROMISING CLINICAL OPPORTUNITIES.

THIS PROCESS IS COMPLEX AND DOES NOT FOCUS ON ONLY ONE PHASE.

ONE OF THE THINGS NAH HAS DONE, AND THIS WAS IN JULY OF 2022.

NAH WAS ONE AMONG THE FIRST HOSPITALS TO VOLUNTARILY SIGN THE WHITE HOUSE HEALTH CARE SECTOR CLIMATE PLEDGE.

IN DOING SO, WE COMMITTED TO REDUCE ORGANIZATIONAL EMISSIONS BY 50% BY 2030 AND ACHIEVE NET ZERO FOR OUR ENTIRE HEALTH CARE SYSTEM, NOT JUST FLAGSTAFF MEDICAL CENTER BY 2050, PUBLICLY ACCOUNTING FOR PROGRESS ON THIS GOAL EVERY YEAR.

WE HAVE DESIGNATED AN EXECUTIVE LEVEL LEAD FOR THE WORK ON REDUCING EMISSIONS BY 2023 AND CONDUCT AN INVENTORY OF SCOPE 3 EMISSIONS BY THE END OF 2024.

THESE ARE ITEMS THAT HAVE ALREADY BEEN IN THE WORKS.

WE WILL BE DEVELOPING AND RELEASING A CLIMATE RESILIENCE PLAN FOR CONTINUOUS OPERATIONS BY THE END OF 2023, ANTICIPATING THE NEEDS OF GROUPS IN THE COMMUNITY THAT EXPERIENCE DISPROPORTIONATE RISK OF CLIMATE RELATED HARM.

THE NEW HOSPITAL AND AMBULATORY CARE CENTER PLAY A BIG PART IN OUR ABILITY TO REACH THESE REQUIREMENTS.

AS WE HAD STATED EARLIER, WE KNOW OUR PATH TO CARBON NEUTRALITY IS NOT STAYING WHERE WE ARE.

IN QUITE THE OPPOSITE, IT'S PROBABLY OUR PATH TO START TO HAVE MORE CARBON AND INCREASED USE IN BOTH GAS AND POWER.

ALONG WITH THAT COMMITMENT THAT NAH MADE TO THE WHITE HOUSE, WE STAND HERE BEFORE MAYOR AND COUNCIL MAKING THE SAME COMMITMENT TO YOU AND ALSO STATING THAT THIS NEW HOSPITAL WILL BE IN LINE WITH THE MOST SUSTAINABLE HOSPITALS BUILT IN THE STATE OF ARIZONA.

I DIDN'T KNOW TIFFANY WAS GOING TO STEAL MY THUNDER DURING HER PRESENTATION, BUT HERE WE ARE.

I DO HAVE A SLIDE AND MAYBE WE CAN DISCUSS A LITTLE BIT MORE ABOUT OUR COMMITMENT TO SOLAR.

DURING THE P&Z PROCESS, WE HEARD A LOT OF ROBUST DISCUSSION AROUND SUSTAINABILITY AND WE APPRECIATE THE COMMUNITY'S CONCERNS TO OUR COMMITMENT.

WE HAD BEEN PLANNING FOR THIS GARAGE TO HAVE SOLAR CAPACITY ON IT SINCE WE STARTED DESIGN.

THE STRUCTURAL DESIGN FOR THE PARKING GARAGE HAS ALWAYS INCORPORATED THE STRUCTURAL CAPACITY TO HAVE A SOLAR ARRAY BUILT ON TOP OF IT.

WE WERE HOLDING OUT, IF YOU WILL, TO MAKE SURE THAT WE WERE ABLE TO INCORPORATE IT INTO THE PROCESS AT THE RIGHT TIME AND WITH THE RIGHT TECHNOLOGY.

BUT AS WE UNDERSTAND HOW IMPORTANT AND VITAL THIS IS TO FLAGSTAFF COMMUNITY AND LEADERS, NAH IS PREPARED TO MAKE A COMMITMENT THAT WE WILL BE COVERING THE TOP OF OUR PARKING GARAGE WITH SOLAR ARRAY BY 2030.

COUNCILMAN MCCARTHY, WE HEARD YOU ABOUT MORE DETAIL.

WE WILL TRY AND PUT MORE DETAIL TOGETHER.

THIS IS A COMMITMENT WE HAVE MADE ANEW BASED ON THIS COMMUNITY FEEDBACK.

I THINK WE CAN PUT A LITTLE MORE ENGINEERING TO IT.

OUR INTENTION JUST SO YOU UNDERSTAND, IS TO COVER AS MUCH OF THE GARAGE AND GET AS MUCH CAPACITY AS POSSIBLE.

KEEPING IN MIND, THERE'S THINGS LIKE DRIVE AISLES AND RAMPS, ETCETERA, THAT WE HAVE TO FACTOR INTO OUR DESIGN.

WITH THAT, I'M GOING TO TURN IT OVER TO THE REAL BRAINS IN THE ROOM WHEN IT PERTAINS TO SUSTAINABILITY.

NOLAN ROME, OUR LEAD ENGINEER.

>> THANK YOU, STEVE, MAYOR IN COUNCIL.

I'M NOLAN ROME, I'M THE DIRECTOR OF HEALTH CARE WITH WSP.

I'M ALSO THE PRINCIPAL IN CHARGE OF THIS PROJECT AND HAVE BEEN SINCE THE EARLY ONSET, FEW YEARS AGO.

MY PRIMARY ROLE WITHIN WSP AS HEALTH CARE DIRECTOR IS ACTUALLY A RESILIENCY AND SUSTAINABILITY PRACTICES ON LARGE PROJECTS.

WITH THAT BEING SAID, WE'RE GOING TO DIVE INTO THE HEAVY ENGINEERING OF WHAT THAT MEANS TO NAH AND WHAT IT MEANS TO THIS SITE DEVELOPMENT.

FIRST, IN SITE DEVELOPMENT.

I THINK THERE HAS BEEN SOME QUESTION ABOUT WHAT THE IMPACT IS OVERALL.

ONLY 40% OF THE LAND IS ACTUALLY BEING DEVELOPED IN THE HOSPITAL SITE ITSELF DIRECTLY.

[02:50:03]

MORE THAN 30% OF THAT WILL BE IMPROVED, 25% OF THAT WOULD BE VEGETATED.

30% OF THAT WILL REMAIN UNDISTURBED FOREST.

I THINK ONE IMPORTANT PART IS THE HOSPITAL DOESN'T DEVELOP THIS.

IT'S DEVELOPMENT BY RIGHT, CAN GO TO RESIDENTIAL ESTATES, WHICH WILL BREAK THAT DOWN AND DEVELOP IT INTO A SIGNIFICANTLY MORE DENSE PARCEL THAN THE 25% AND 30% THAT WE'RE PROPOSING.

IN TERMS OF WATER EFFICIENCY, WE'RE INCORPORATING A FEW TECHNOLOGIES INTO THIS THAT ARE INDUSTRY LEADING AND STAYING ON THE CUTTING EDGE.

ONE OF THEM IS A VACUUM SANITARY SYSTEM.

THE OTHER IS A HEAT PUMP CHILLER TECHNOLOGY FOR ALL OF OUR BASELINE HEATING.

THEY WILL BE ELECTRIFIED.

THOSE COMBINED ALONG WITH THE MEDICAL EQUIPMENT ACTUALLY REDUCE WATER CONSUMPTION OF THE FACILITY BY 22 MILLION GALLONS ANNUALLY IN THIS FACILITY.

AGAIN, THOSE ARE INVESTMENTS ABOVE AND BEYOND WHAT WE WOULD DO IN A STANDARD MODERN HOSPITAL.

DIVING INTO THE ENERGY REDUCTION AND WHAT THAT MEANS.

WE REALLY APPRECIATE SOME OF THE PUBLIC COMMENT FROM THE P&Z COMMISSION.

ONE OF THE COMMENTS WAS, HOW DO WE COMPARE AGAINST ASHRAE 189.1 STANDARD? WE RAN THOSE CALCULATIONS OVER THE LAST COUPLE OF WEEKS AND WE ALREADY HAD BASELINE MODELING DONE FOR THE BUILDINGS.

SO IT WAS AN EASY CHALLENGE TO LOOK AT.

WE'RE CURRENTLY 12% BELOW THAT BASELINE.

THE HEATING PLANT IS 116% MORE EFFICIENT THAN THAT BASELINE.

THERE'S A BIG QUESTION AROUND HOW WE'RE HEATING THE BUILDING, HOW WE'RE DRIVING THAT VALUABLE RESOURCE, ESPECIALLY AROUND CARBON EMISSIONS AND SEE THAT HIGH EFFICIENCY REALLY MEANT A LOT TO OUR TEAM AND WE APPRECIATE THAT CHALLENGE TO PUT THAT HIGHLIGHT ON THE PROJECT.

ENERGY STAR 75, WHICH IS A REQUIREMENT OF THE CITY.

WE'RE CURRENTLY 18% BELOW THAT REQUIREMENT.

WE'RE DRIVING SIGNIFICANT EFFICIENCY.

BUT IT'S REALLY AROUND RESILIENCY AT THIS HOSPITAL.

WE LOOK AT EFFICIENCY AND THE WAY WE'RE BEING STEWARDS OF THE CONSUMABLE ENERGY, IT'S ALSO THEY'RE THAT HIGHLY EFFICIENT THAT WE CAN FOCUS OUR STAFF'S ATTENTION ONTO OTHER MORE PRESSING MATTERS AND MAKE THIS A MORE SUSTAINABLE PLACE FOR BOTH CLINICAL SUPPORT AND FACILITY SUPPORT IN ADDITION TO HIGH LEVEL OF PATIENT CARE.

WHEN YOU COUPLE THE OVERALL SITE USE THE ENERGY REDUCTION, THE WATER REDUCTION, SEVERAL MONTHS AGO AS A TEAM IN OUR BIG ROOM, WE ARE A CO-LOCATED DESIGN AND CONSTRUCTION TEAM ALONG WITH THE OWNER'S TEAM IN A SITE WE WENT THROUGH AND DID THE LEED SCORECARD.

WE ARE NOT ACHIEVING LEED CERTIFICATION, BUT WE DID IT FOR OUR OWN EDIFICATION AND BEING IN LINE WITH NH'S MISSION AND VISION.

FOR THIS PROJECT TO BE SUSTAINABLE AND RESILIENT, THERE ARE ENOUGH POINTS IN THE YES COLUMN AND VERY STRONG ON THE BORDER LINE TO GET US INTO LEED GOLD AND THAT IS FIRMLY IN THE GOLD CATEGORY.

AGAIN, THIS IS A TREND, I'M SAYING MOST PLACES ACROSS THE COUNTRY WHERE WE HAVE A NOT-FOR-PROFIT HEALTH CARE SYSTEM WHEN YOU DRIVE MOST VALUE TO THE PATIENT, MOST VALUE TO THE COMMUNITY.

THEY'RE NOT SEEKING LEED CERTIFICATION AND THAT COST THAT GOES ALONG WITH IT DURING THE CONSTRUCTION PHASE AND THE DESIGN PHASE.

BUT THEY ARE COMING OUT PUBLICLY AND SAYING WE'RE MEETING OUR MISSION AND VISION USING THIS BRAND NAME AND THIS RATING SYSTEM.

BUT THEY ARE CHOOSING TO INVEST THEIR DOLLARS IN CLINICAL PROGRAMS, EQUIPMENT, AND CAPACITY FOR CARE IN THIS COMMUNITY.

NATURAL GAS HAS BEEN A HOT TOPIC AND WE REALLY REALLY APPRECIATE IT.

IT WAS ONE THAT I GOT TO HAVE WITH PLANNING AND ZONING AND A REALLY GREAT ONE-ON-ONE, ROBUST EXCHANGE.

FOR PUBLIC RECORD I'VE GONE AHEAD AND OUTLINE THAT STRATEGY SO PEOPLE THAT CAN'T ATTEND CAN UNDERSTAND WHY NATURAL GAS IS RESILIENT AND WHY IT'S THE BEST USE FOR PATIENT SAFETY.

THE FGI GUIDELINES ARE WHAT DICTATE HOW WE DESIGN A HOSPITAL AND HOW WE DEFINE RISK MANAGEMENT.

FLAGSTAFF AND IT'S DESIGNED TEMPERATURES FOR HEATING IN THE WINTER REQUIRE US TO HAVE EMERGENCY HEAT.

IF WE WERE TO GO ALL ELECTRIC AND TO BE FULLY ELECTRIFIED, THAT WOULD REQUIRE LARGER DIESEL GENERATORS, WE ALREADY HAVE FOUR TO MAKE GENERATORS PLAN AND A LARGE DIESEL STORAGE SYSTEM.

IT WOULD ACTUALLY REQUIRE ALMOST DOUBLING THAT SYSTEM AND CREATING

[02:55:02]

THAT MUCH MORE DIESEL STORAGE IN ADDITION TO THE TRUCK TRAFFIC THAT WOULD HAVE TO COME UP I-17 AND REPLENISH THAT.

IT ALSO CREATES AN ADDITIONAL ELEMENT OF RISK IN THAT MECHANICAL FAILURE OR NOT BEING ABLE TO GET DIESEL FUEL DURING A PROLONGED OUTAGE.

BASED ON THAT RISK ASSESSMENT IS WHAT DROVE US TOWARDS NATURAL GAS.

ONCE WE DECIDED THAT THAT WAS GOING TO BE THE WAY WE PROVIDE EMERGENCY HEAT TO THIS FACILITY, WE THEN WENT AND LOOKED INTO WHAT'S THE MOST EFFICIENT WAY TO USE THAT.

SO WE PUT IN A HEAT RECOVERY SYSTEM THAT ACTUALLY THEY COOLING THAT WE'RE EXTRACTING FROM THE BUILDING.

WE'RE USING ELECTRICITY TO DRIVE THAT AND THAT PROVIDES ALL THE HEAT FOR THE BASELINE OF OUR SYSTEM FOR THE ENTIRE YEAR.

NO, I'M NOT THE ONLY ENGINEER IN THE ROOM, BUT JUST TO MAKE THAT CLEAR, ALL THE HEATING REQUIREMENT FOR THE SUMMER, MOST OF THE SPRING AND MOST OF THE FALL WILL BE ELECTRIC HEAT.

WE'LL BE THEN USING 94 TO 95 PERCENT EFFICIENT BOILERS IN REALLY SMALL INCREMENTS.

WE'RE ONLY GOING TO BURN THE NATURAL GAS WE NEED TO MAINTAIN TEMPERATURE AND HUMIDITY REQUIREMENTS FOR PATIENT SAFETY.

THOSE LITTLE TINY BOILER INCREMENTS PROVIDE THAT RESILIENCY WE NEED AT THE MOST EFFICIENT USE OF NATURAL RESOURCES THAT WE CAN.

AGAIN, IT'S ABOUT PATIENT SAFETY AND RISK MANAGEMENT FIRST AND THEN TURNING AROUND AND LOOKING AT HOW CAN WE REUSE OUR RESOURCES THE MOST RESPONSIBLE ON-SITE.

AGAIN, THAT NATURAL GAS CONSUMPTION IN THIS NEW FACILITY WILL BE 78% REDUCTION OVER WHAT WE'RE SEEING ON A SQUARE FOOT BASIS IN THE EXISTING HOSPITAL.

EMBODIED CARBON IS A BIG DISCUSSION, PARTICULARLY IN THE RESILIENCE AND SUSTAINABILITY REALM.

THE HOSPITAL FROM THE VERY ONSET, WHEN WE SAID WE HAVE OUR DESIGN AND CONSTRUCTION PARTNERS ARE WORKING IN A ROOM TOGETHER.

THE HOSPITAL INVESTED IN BRINGING ON A STEEL PARTNER.

THEY'RE PAYING FOR THEIR DESIGN SERVICES.

AGAIN, AS JOHN ALLUDED TO, WE'RE LOOKING AT TO REDUCE THAT HEIGHT.

WE'RE ALSO LOOKING AT TO REDUCE STEEL MEMBERS, REDUCE STEEL TONNAGE OVER THE BASELINE CODE REQUIREMENT BY USING ACTIVE MODELING THAT STILL MEETS THE REQUIREMENTS OF THE CODE, BUT IT GETS IT DOWN INTO SMALLER TONNAGES.

WE'RE ALSO LOOKING AT MOMENT FRAME CONNECTIONS AND OTHER THINGS THAT ALLOW US FOR THAT STEEL TO NOT CHANGE IN THE BUILDING OVER TIME.

THAT'S EMBODIED CARBON.

THAT MEANS WHENEVER WE RENOVATE THIS BUILDING OR WE EXPAND IT, WE'LL BE ABLE TO DO IT IN A WAY WE'RE NOT TAKING THE STEEL WE PUT IN OR HAVING TO TAKE IT OUT AND REPLACE IT WITH SOMETHING ELSE IN THE FUTURE, IT STAYS WITH THAT BUILDING AND REDUCES THAT IN PARTY CARBON FOOTPRINT TO THE TUNE OF ALMOST 20% AND REDUCING 40,000 POUNDS.

>> EXCUSE ME JUST ONE MOMENT.

I JUST WANT TO MAKE YOU ALL AWARE THAT YOU HAVE 15 MINUTES LEFT IN YOUR PRESENTATION.

>> GOT IT. LET'S SKIP TO THE LAST PIECE HERE.

THIS WATERFALL DIAGRAM, JUST TO TOUCH ON IT BRIEFLY, THIS IS AGAINST A BASELINE STANDARD.

SO WHAT WE'RE TALKING ABOUT ARE THE FIRST TWO GREEN BARS.

THAT'S THE BUILT ENVIRONMENT.

I THINK WHAT YOU'VE SEEN FROM NAH IS THEIR COMMITMENT TO THE WHITE HOUSE CLIMATE PLAN OF 2030 AND 2050 ACTION.

AS A HEALTH CARE SYSTEM, THEY WILL CONTINUE TO DRIVE DOWN THOSE OTHER OPERATIONAL CARBON IMPACTS.

THEY'VE MADE THAT COMMITMENT PUBLICLY.

THE GRAY BAR ON THE LEFT IS BUSINESS AS USUAL IF WE'RE GOING TO DESIGN THIS IS A STANDARD FACILITY.

IF WE STAY IN THE EXISTING BUILDING, THAT GRAY BAR GOES WAY UP BECAUSE WE WON'T BE ABLE TO RECLAIM THOSE RESOURCES.

THAT'LL TURN IT BACK OVER TO STEVE.

>> THANK YOU. A COUPLE OF SLIDES JUST TO CLARIFY WHERE NAH STANDS IN A COUPLE OF THINGS TO CLARIFY WHERE SOME OF THE WORK THAT WE'VE BEEN WORKING ON HAVE COME FROM.

AGAIN, AS I THINK BACK TO THE COLLABORATION AND PARTNERSHIP THAT WE'VE HAD WITH THE CITY OF FLAGSTAFF STAFF, THE TRAFFIC COMPONENT OF IT IS SOMETHING THAT WE'VE BEEN WORKING ON AS A TEAM FOR OVER TWO YEARS NOW NOT ONLY THROUGH THE WORK OF CITY OF FLAGSTAFF TRAFFIC DEPARTMENT AND OUR OWN TRAFFIC PARTNERS IN CB TECH, BUT ALSO METROPLAN.

SO A FEW OF THE THINGS THAT WE JUST WANTED TO CLARIFY FOR THE RECORD TONIGHT, SCOPING OF THE TRAFFIC IMPACT ANALYSIS THAT WE HAVE SUBMITTED AND APPROVED THROUGH THIS PROCESS WAS A MUTUALLY AGREED TO OVER A PERIOD OF TWO YEARS.

THAT WAS THROUGH PARTNERSHIP WITH CITY STAFF AND METROPLAN SINCE THE BEGINNING, THE INPUTS THAT WE TOOK FOR THE CURRENT AND FUTURE DATA THAT WAS GIVEN TO US BY METROPLAN AND WE USED IT FOR OUR BASELINE ASSUMPTIONS.

SO WE USE METROPLAN'S CURRENT DATA, AND WE USE METROPLAN'S 2040 DATA FOR OUR FUTURE OUTLOOK.

ALL OF THE FORECASTING OF TRIP DISTRIBUTION WERE APPLIED TO THE TRAFFIC MODELS BASED ON THE FUTURE 2040 METROPLAN MODEL AT THE DIRECTION OF CITY TRAFFIC STAFF.

[03:00:04]

SO THIS WAS NOT JUST NAH'S TAKE ON WHAT TRAFFIC IMPACT ANALYSIS LOOKS LIKE.

A LITTLE BIT ABOUT TRANSPORTATION ACCESS AND EQUITY AND JUST TALK ABOUT HOW OUR PARTNERSHIP THAT WE HOPE TO FORM WITH MOUNTAIN LINE IN THE FUTURE IS PART OF A MUCH BIGGER STRATEGY.

WHETHER IT'S FOR PATIENTS, FAMILIES OR EMPLOYEES, NAH, ALREADY ENSURES THE IMPERATIVE THAT GETTING TO THE HOSPITAL IS EASY, AFFORDABLE, AND NOT A BURDEN.

SOME OF THE THINGS WE ALREADY CURRENTLY DO AND WE PLAN TO MAINTAIN DOING IN THE FUTURE.

PATIENTS ARE CURRENTLY PROVIDED BUS PASSES IF MOUNTAIN LINE SERVICE AS A LOCATION NEAR THEIR RESIDENTS.

WE COORDINATE AND PAY FOR UBER/ LYFT RIDES FOR THOSE NOT SERVED BY PUBLIC TRANSIT, MORE THAN 1,700 RIDES HAVE BEEN PROVIDED BY NAH TO THE COMMUNITY THIS YEAR.

FOR THOSE COMING FROM A FAR DISTANCE WE ARRANGE AND PAY FOR GREYHOUND AND/OR AMTRAK TICKETS.

WE ALSO OFFER BUS PASSES TO ALL FLAGSTAFF MEDICAL CENTER EMPLOYEES AT NO COST.

NAH AS YOU KNOW THROUGH OUR DEVELOPMENT AGREEMENT, IS COMMITTED TO RUNNING A SHUTTLE BETWEEN THE NEAREST MOUNTAIN LINE STOP AND THE NEW HOSPITAL INVENTORY CARE CENTER AT NO COST TO ANY RIDERS.

AN ACCESS TO HEALTH CARE SERVICES HAS BEEN IDENTIFIED AS SUCH A CRITICAL GAP THAT ACCESS OR RANGES AND PAYS FOR TRANSPORTATION TO AND FROM ANY REQUIRED CARE.

A FEW THINGS WE WANTED TO MAKE SURE WE POINT OUT ABOUT BEING GOOD NEIGHBORS WITH THE COUNTY AND WE DO UNDERSTAND WE HAVE MORE WORK TO DO WITH THE COUNTY MOVING FORWARD.

IF THINGS GO ACCORDING TO OUR PLAN, WE WILL BE PARTNERS WITH THEM FOR A VERY LONG TIME AND WE'D BE NEIGHBORS WITH THEM FOR A VERY LONG TIME.

WE HAVE BEEN MEETING WITH THEM RECENTLY AND PLAN ON CONTINUING TO MEET WITH THEM IN THE FUTURE.

WE'VE HAD RECENT MEETINGS ALL THE WAY BACK TO 10,19, 22 AND THEN TWICE ALREADY THIS YEAR MEETING WITH THEM IN BOTH FEBRUARY AND APRIL.

WE PLAN ON WORKING WITH THEM MORE IN THE FUTURE.

TO THE TOPIC OF TRAFFIC AND HOW WE CAN POTENTIALLY MAKE A POSITIVE IMPACT AS IT PERTAINS TO SPECIAL EVENT TRAFFIC AT THE COUNTY PARK.

THE WIDENING OF THE JW POWELL/I-17 BRIDGE AND BEULAH BOULEVARD WILL IMPROVE ACCESS AND TRAFFIC FLOWS TO THE PARK AND WE ALSO PLAN ON IMPROVING SAFETY WITH THE REALIGNMENT OF THE MOUNTAIN DELL ROAD, WHICH RIGHT NOW IT COMES INTO BEULAH AT A VERY STEEP ANGLE, WHICH WE WILL BE REDOING INTO A 90-DEGREE INTERSECTION.

CAREFUL ATTENTION HAS BEEN GIVEN TO FORT TUTHILL COUNTY PARK'S BOUNDARIES AND SITE DESIGN DECISIONS HAVE BEEN EXPRESSLY MADE TO INCREASE BUFFERS BETWEEN TRAILS AND ROADWAYS.

I DO UNDERSTAND THAT THERE IS MORE WORK TO BE DONE AS WE CONTINUE TO PARTNER WITH THEM.

ONE OF THE THINGS THAT WE HAVE COMMITTED TO VERBALLY WITH THE COUNTY IN THE PAST AND WE'LL SAY TODAY, WE PLAN ON STAGING MONTHLY MEETINGS WITH THEM THROUGHOUT THE ENTIRE CONSTRUCTION AND DEVELOPMENT OF OUR PROJECT TO MAKE SURE THEY STAY ABREAST OF EVERYTHING WE'RE DOING ANY POTENTIAL CHANGES AND IMPACTS ON ANYTHING THAT CAN AFFECT THE DAY-TO-DAY OPERATIONS OF RUNNING THE PARK.

I'LL TRY NOT TO SPEND TOO MUCH TIME ON THIS.

I KNOW THIS TOPIC CAME UP DURING STAFF, BUT THIS IS NAH'S SIDE OR TAKE ON THE GRADING DOWN FOR THE POTENTIAL UNDERPASS.

I THINK FIRST OF ALL, IT'S IMPORTANT THAT I NOTE WE HAVE COMMITTED TO DOING THIS WORK THROUGH THE DEVELOPMENT AGREEMENT.

THERE'S AT NO POINT IS NAH ASKING TO NOT DO THIS WORK.

WHAT WE ARE ASKING, AND I THINK FOR SOME OF THE REASONS THAT WERE ARTICULATED BY STAFF IS TO NOT HAVE TO FORMALLY COMMIT TO DO THIS ON DAY 1 WHEN THERE ARE SO MANY OBVIOUS UNKNOWNS TO WHAT IS REALLY GOING TO HAPPEN AND WHEN IT IS GOING TO HAPPEN.

WE HAVE TAKEN SOME TIME AND CARE INTO DOING A DEEP DIVE INTO THE ENGINEERING OF THIS.

WE DO KNOW THAT IT CREATES A LOW SPOT AND QUITE A LOW SPOT UNTIL THE I75 UNDERPASS COMES IN THE FUTURE.

I THINK THERE WAS A COMMENT BY A STAFF MEMBER EARLIER THAT WE TRY NOT TO USE PUMPING SYSTEMS. WE WILL HAVE TO USE A PUMPING SYSTEM IF WE LOWER THIS.

THAT PUMPING SYSTEM WILL ULTIMATELY BECOME THE MAINTENANCE AND OPERATIONS OF THE CITY OF FLAGSTAFF UNTIL THAT I75 UNDERPASSES DONE.

WE'RE A LITTLE LIMITED ON TIME, SO I WON'T DELVE INTO THIS AND WE CAN PICK THIS CONVERSATION BACKUP AFTER THIS MEETING.

BUT AGAIN, OUR REQUEST IS NOT TO NOT HAVE TO DO THIS WORK.

IT'S TO UNDERSTAND THE UNKNOWNS OF IF THE WORK IS GOING TO HAPPEN AND WHEN IT IS GOING TO HAPPEN, AND PUT OUR FINANCES AND THE WORK GETTING DONE AT THE APPROPRIATE TIME WITH THE APPROPRIATE KNOWLEDGE OF WHAT WE'RE ACTUALLY GOING TO BE DOING IN THE FUTURE.

VISION PLANNING FOR 1200 NORTH BEAVER.

OUR EXISTING CAMPUS, WE UNDERSTAND THAT THE COMMUNITY HAS CONCERNS AND WE ALSO UNDERSTAND NAL CHOOSE ROLES AND RESPONSIBILITIES IN MAKING SURE THAT WE DEVELOP,

[03:05:03]

REDEVELOP THE EXISTING CAMPUS INTO SOMETHING THAT IS TRULY SPECIAL FOR THE COMMUNITY AND MEETS THE NEEDS FOR THE COMMUNITY.

I'M NOT GOING TO READ THROUGH EVERY BULLET POINT THAT'S ON THIS SCREEN.

BUT IN OUR DEVELOPMENT AGREEMENT, WE HAVE COMMITTED TO A FORWARD FACING COMMUNITY REDEVELOPMENT PROJECT WITH THE COMMUNITY AND PARTICIPATION FROM FLAGSTAFF COUNCIL AND STAFF.

WE HAVE PUT PUMA AND URBAN MANAGEMENT COMPANY UNDER CONTRACT.

THIS SCHEDULE, THESE DATES, THESE DELIVERY POINTS, THESE COME FROM PUMA DIRECTLY AND WE DO FEEL THAT BY Q2 OF 2024, WE CAN HAVE A COMMUNITY FOCUSED REDEVELOPMENT VISION PLAN THAT WE CAN CONTINUE TO MODIFY AND CHANGE AS THE COMMUNITY GROWS THROUGHOUT THIS DECADE FOR A PROJECT THAT WILL MOST LIKELY NOT BE REDEVELOPED UNTIL 2029-2031 TIMEFRAME.

I'M GOING TO HAND IT OVER TO COLLEEN. THANK YOU.

>> THANK YOU, MAYOR. THANK YOU, COUNCIL.

EXCITING FOR THE LAWYER TO GET TO DELIVER SO MUCH GOOD NEWS.

AT THE REQUEST OF THE PLANNING AND ZONING COMMISSION, THIS IS A CHART OF DIRECT ECONOMIC BENEFITS AND TAX REVENUES TO THE CITY OF FLAGSTAFF.

THESE ARE NOT NUMBERS, THESE COME FROM APPLIED ECONOMICS AND ARIZONA CONSULTING FIRM WHO WAS ENGAGED THROUGH THE ECONOMIC IMPACT ANALYSIS, AND THIS IS JUST THE REVENUES TO THE CITY.

NO TAX DOLLARS WILL BE USED TO CONSTRUCT, MOVE, OR COMMENCE SERVICES AT OUR NEW CAMPUS.

RATHER, THIS PROJECT GENERATES OVER $100 MILLION IN DIRECT ECONOMIC BENEFIT TO THE CITY.

THAT'S EXCLUSIVE OF SOME OF THE THINGS YOU HEARD FROM STAFF, SUCH AS $113 MILLION IN DIRECT LABOR EARNINGS BY FOLKS IN THIS COMMUNITY.

ALSO NOT INCLUDED HERE ARE LEGACY CAMPUS WILL BE AS YOU'VE HEARD, REDEVELOPED AND IT WILL ALSO GENERATE NEW REVENUES FOR THE CITY OF FLAGSTAFF AND NEW OPPORTUNITIES FOR OUR CITIZENS.

THESE REVENUES ARE SOME OF HOW THE IMPACT ANALYSES SHOW THAT THE CITY CAN PAY FOR THE ADDITIONAL OPERATIONS AS WE BRING SERVICES OUT TO OUR NEW CAMPUS.

IN RED, THESE ARE THE ONLY FEES THAT ARE REQUIRED BY STATUTE.

THE IMPACT FEES, WE NEED TO PAY $1.3 MILLION AND FIRE AND POLICE IMPACT FEES AT OPENING.

THAT GOES UP TO $2 MILLION AT FULL BUILD-OUT.

EVERYTHING ELSE THAT NAH IS CONTRIBUTING.

I DON'T THINK TIFFANY HAS TAKEN ENOUGH CREDIT FOR THE WORK THAT STAFF HAS DONE.

THEY HAVE LOOKED AT EVERY SINGLE IMPACT ANALYSIS, EVERY WAY THAT THE CITY OF FLAGSTAFF WILL BE AFFECTED BY THIS MOVE AND CONSIDERED WHAT FLAGSTAFF NEEDED AND NEGOTIATED ON THE CITY OF FLAGSTAFF BEHALF WITH US TO SECURE THESE BENEFITS IN THE DEVELOPMENT AGREEMENT.

THESE DA AND THE SECTION SYMBOL, OR LITERALLY WHERE YOU CAN FIND THEM IN WRITING IN OUR DEVELOPMENT AGREEMENT.

THIS IS THE DRAFT I HAVE AT THE MOMENT.

IT'S GOT SOME THINGS YOU'RE INTERESTED IN.

COUNCIL MEMBER [INAUDIBLE], I'M NOT SURE WHICH VERSION YOU HAVE BUT IT'S STILL WORKING.

THIS IS CHRISTINA'S VERSION FROM THIS AFTERNOON.

AMONG THE THINGS WE ARE GOING TO BE PAYING 50% OF THE RELOCATION COSTS FOR THAT FIRE STATION NUMBER 6, $7 MILLION IN ON-SITE TRANSPORTATION IMPROVEMENTS.

OFFSITE TRANSPORTATION IMPROVEMENTS, I WANT TO ADDRESS SOMETHING THAT CAME UP AT PLANNING AND ZONING.

THERE WAS A REQUEST THAT WE WAIT TO SEE IF WE GET THE RAYS GRANT.

THE DEVELOPMENT AGREEMENT MAKES CLEAR THAT NAH IS RESPONSIBLE FOR THESE.

IF WE DON'T GET THE RAYS GRANT, WE NEED TO FIND THE $45 MILLION.

FURTHER, YOU HEARD TODAY THE SOLAR COMMITMENT, THAT'LL BE ANOTHER $7 MILLION SO THE PROJECTS THAT WE'VE NOW PUT A DATE ON.

THE THIRD-PARTY CONSULTANT LOOKING AT REDEVELOPING THE EXISTING CAMPUS.

THE WATER STORAGE TANK AND THE WATER LINE LOOP COLLECTIVELY ABOUT $4 MILLION IN COST TO NAH AND BENEFIT TO THE CITY OF FLAGSTAFF AND TO OUR CAMPUS.

NAH PROVIDING A PRIVATE SHUTTLE SERVICE FROM THE CLOSEST MOUNTAIN LINE STOP OR STOPS TO THE NEW HOSPITAL UNTIL PUBLIC TRANSITS EXTENDED.

I WANT TO TALK A LITTLE BIT ABOUT THE PUBLIC VERSUS PRIVATE FUNDING AND OPERATION OF TRANSPORTATION.

WHAT I'VE GONE THROUGH HERE IS EVERYTHING WE ARE PAYING FOR AND WE ARE FUNDING, AND THOSE ARE CAPITAL COSTS AND COSTS OF RELOCATING AND COST OF THE CHANGE AT THE TIME OF CHANGE.

WE DON'T WANT TO BE HERE TO PRIVATIZE PUBLIC SERVICES.

THE STATE OF ARIZONA SAYS WE ACTUALLY CAN'T DO THAT THROUGH DEVELOPMENT AGREEMENTS.

THERE'S A STATE STATUTE THAT SAYS ARE NOT THROUGH DEVELOPMENT FEES.

THE STATE STATUTE THAT SAYS IMPACT FEES AND THESE DEVELOPMENT FEES ARE TO BE USED TO FUND CAPITAL TYPE COSTS, NOT CONTINUING OPERATIONAL EXPENSE.

WE WANT THOSE PUBLIC GOODS TO REMAIN PUBLIC GOODS AND NOT PRIVATIZED.

[03:10:06]

HENCE, THE NAH SHUTTLE BEING OPERATED RATHER THAN NAH PAYING IN PERPETUITY TO RUN A PORTION OF A PUBLIC TRANSIT LINE.

WE TOOK REALLY SERIOUSLY WHAT WE NEEDED TO CONTRIBUTE TO THE CITY OF FLAGSTAFF TO MAKE THIS FAIR AND EQUITABLE.

WE LOOKED AT EVERY DEVELOPMENT AGREEMENT THE CITY IS ENTERED IN THE LAST 20 YEARS, AND WE BELIEVE IT'S QUITE CLEAR WE'RE FUNDING MUCH MORE THAN ANY DEVELOPER IN RECENT HISTORY IN FLAGSTAFF.

THE LARGEST RECENT DEVELOPMENTS YOU CAN SEE LISTED HERE PAID NOTHING IN EXCESS OF THEIR REQUIRED IMPACT FEE.

AGAIN, $1.3 MILLION IS OUR REQUIRED IMPACT FEE, AND YOU KNOW WHAT WE'VE BEEN THROUGH WHAT WE'RE PAYING.

TWO OF THEM HAVE FUNDED JUST THE CONSTRUCTION OF A NEW BUS STOP.

AGAIN, LOOKING TO FUND THOSE CAPITAL IMPROVEMENTS, NOT ONGOING OPERATIONAL EXPENSE.

I KNOW WE'RE OUT OF TIME, BUT I JUST WANT TO CALL OUT WHAT YOU'VE HEARD TONIGHT HERE ON THE RIGHT SIDE OF THIS SLIDE.

THESE ARE THE CHANGES, THE IMPROVEMENTS TO THIS PROJECTS THAT THE COMMUNITY, THAT THE CITIZENS, THAT YOUR STAFF HAVE ACHIEVED THROUGH PUBLIC PARTICIPATION.

THE FOLKS SITTING IN THIS ROOM, FRIENDS OF FLAGSTAFF FUTURE, ALL OF THESE NEIGHBORHOOD ASSOCIATIONS ARE LOCAL PARTNERS.

THESE ARE SOME OF THE VERY SPECIFIC CHANGES THAT WE'VE MADE TO THIS PROJECT, LISTENING TO WHAT THE CONCERNS OF OUR COMMUNITY ARE.

I WOULD ASK THAT WE HAVE AN OPPORTUNITY NOT ONLY TO ANSWER YOUR QUESTIONS, BUT TO RESPOND TO THE THEMES OF PUBLIC COMMENT TONIGHT TO MAKE SURE WE'RE ALL OPERATING FROM THE SAME INFORMATION AND PERSPECTIVE.

AT THE END OF THE NIGHT, WE WOULD REALLY APPRECIATE YOUR APPROVAL OF THIS PROJECT SO WE CAN CONTINUE TO BE HERE TO MEET THE NEEDS OF OUR COMMUNITY, FLAGSTAFF AND THE REGION FOR MANY YEARS TO COME, AND KEEP CARE CLOSE TO HOME. THANK YOU.

>> THANK YOU. WE WILL TAKE QUESTIONS FROM COUNCIL MEMBERS AND THEN WE WILL HAVE A BREAK.

WHO WANTS TO GO FIRST? COUNCIL MEMBER MCCARTHY.

>> I'M NOT SURE IF THIS IS A QUESTION FOR THE APPLICANT OR FOR OUR STAFF.

BUT I'M JUST WONDERING IF THERE'S SOME WAY WE CAN REDUCE THE COST OF THE WHAT'S REQUIRED FOR THE PURPLE SAGE GOING UNDERNEATH I17.

TWO QUESTIONS. ONE IS, COULD WE MOVE PURPLE SAGE TO THE WEST, AND IS THAT FEASIBLE? IF WE DID THAT, WOULD THAT SAVE ANY MONEY? DOES ANYBODY WANT TO TAKE A STAB AT THAT ONE? [BACKGROUND]

>> I THINK THE POINT IS THAT, MAYBE I'M GOING TO GET THIS RIGHT, BUT IN THE REGIONAL PLAN, YOU WILL SEE THAT THE ORIGINAL REGIONAL PLAN MOVED THAT INTERSECTION TO THE WEST AND AT THE REQUEST OF ANY AGE BECAUSE THIS ROAD NETWORK WOULD NOT AGREE WITH THEIR LAYOUT OF HOW THE SITE WOULD NEED TO WORK FOR THE HOSPITAL.

THE CITY AGREED AND MODIFIED THE REGIONAL PLAN WITH THIS ALIGNMENT WHICH PUTS THE INTERSECTION BACK CLOSER TO I7 TEAM, WHICH MAKES THAT GRADE HARDER TO ACHIEVE.

>> I GUESS THE QUESTION FOR THE APPLICANT IS, IS THAT A NECESSARY CHANGED TO KEEP BUREAU OVER?

>> IT IS SOMETHING WE FEEL NECESSARY FOR A PROPER SITE LAYOUT FOR THE HOSPITAL AND FOR PROPER PARKING FIELDS.

I THINK JUST TO CLARIFY, WE DO UNDERSTAND WE WERE THE ONES WHO ASKED TO MOVE IT.

WE DO UNDERSTAND THAT IT WILL COST MORE MONEY BECAUSE OF THAT RELOCATION, AND WE ALSO UNDERSTAND THAT IT WILL COST MORE MONEY IN THE FUTURE, AND THAT IS A DECISION WE ARE WILLING TO MAKE TO PAY MORE LATER TO NOT ONLY ULTIMATELY PUT THE MONEY IN AT THE APPROPRIATE TIME FROM A CAPITAL PERSPECTIVE, BUT ALSO TO MAKE SURE THAT WE DON'T LEAVE A MAINTENANCE SITUATION FOR OUR PARTNERS AT THE CITY OF FLAGSTAFF.

ALSO MAKE SURE THAT WE'RE PUTTING IN THE RIGHT GRADE.

I THINK WE HAVE A POSSIBLE UNDERSTANDING OF WHAT MIGHT COME IN THE FUTURE.

I KNOW WHEN BELLAGIO AND [INAUDIBLE] WAS ORIGINALLY INTENDED TO BE ON OUR PROPERTY, WE WERE THINKING THAT WOULD BE AN OVERPASS AND NOT AN UNDERPASS.

I THINK WE'RE JUST ASKING FOR TIME TO PLAY OUT SO THAT WE MAKE SURE WE DO THE RIGHT THING AT THE APPROPRIATE TIME.

>> OVERPASS IS AN INTERESTING IDEA THAT MIGHT SIMPLIFY SOME OF THE SEWAGE DRAINAGE ISSUES.

I'LL LEAVE IT AT THAT NOW. THANK YOU.

>> THANK YOU, COUNCILMEMBER.

COUNCIL MEMBER MATTHEWS.

>> THANK YOU, MAYOR. TIFFANY, COME BACK UP.

[03:15:04]

STAYING ON THE THEME OF THIS UNDERPASS, AND I KNOW I'VE ASKED THESE QUESTIONS TO YOU IN THE PAST, BUT IN MY MIND, WE HAVE AN UNDERPASS FOR LONE TREE CURRENTLY, AND THEN I DON'T BELIEVE WE HAVE A CONNECTOR UNDERPASS OTHER THAN THAT.

I KNOW THAT THIS UNDERPASS HAS BEEN IN THE ORIGINAL PLAN FOR 20 YEARS OR SO AND WE BELIEVE THAT AT SOME POINT, I'VE DRIVEN IT, I DON'T SEE THAT VISION THAT WILL EVER NEED IT JUST BECAUSE OF WHERE IT'S AT, BUT I'M JUST CURIOUS OF SINCE WE HAVEN'T REQUIRED IT IN OTHER HIGHER DENSITY AREAS OF FLAGSTAFF THAT ARE ALREADY DEVELOPED, WE DON'T HAVE AN UNDERPASS CONNECTING THE TWO SIDES OF OUR CITY, WHY IS THIS ONE REQUIRED?

>> WHAT WE DO WHEN WE'RE WORKING WITH AN APPLICANT, THE FIRST PLACE WE GO TO IS OUR REGIONAL PLAN MAPS.

AS WE SIT AND DISCUSS WITH AN APPLICANT, AND THIS WAS SUCH A BIG PROJECT AT FIRST, SEVERAL OF US WERE WORKING WITH NAH TO FIGURE OUT HOW THEIR SITE COULD LAY OUT.

WE LOOKED AT A MULTITUDE OF LAYOUTS BEFORE WE GO TO WHAT IS CURRENTLY BEFORE YOU, WHAT I CAN SAY IS THAT STAFF IS WORKING WITH THAT REGIONAL PLAN.

IT IS WHERE THOSE UNDERPASSES ARE SHOWN, WHERE THOSE INTERCHANGES ARE SHOWN, THAT'S WHERE WE WORK WITH AN APPLICANT TO GET THOSE FEATURES, SAME WITH FOOTS.

IT'S MUCH HARDER FOR US TO TELL A DEVELOPER WE WOULD LIKE A FOOTS HERE IF IT'S NOT SHOWN IN THE REGIONAL PLAN.

IF IT'S SHOWN IN THE REGIONAL PLAN, WE CAN SHOW THAT NEXUS.

WE CAN SHOW THAT THIS IS PART OF A DYNAMIC TRANSPORTATION SYSTEM.

IT IS PART OF AN OVERALL TRANSPORTATION SYSTEM THAT'S LOOKING AT THE POTENTIAL FOR INCREASED DENSITY OVERALL WITHIN THIS PART OF THE CITY.

WE HAVE HAD THESE DISCUSSIONS, NOT NECESSARILY IN TERMS OF UNDERPASSES, BUT JUST ROAD NETWORK CONNECTIVITY OVERALL.

THERE HAVE BEEN OTHER PLACES WHERE WE'VE TALKED ABOUT WHETHER OR NOT ROADS SHOULD CONNECT.

MCMILLAN MESA IS ANOTHER PERFECT EXAMPLE.

ROADWORK CONNECTIVITY IS ONE OF THE MORE DIFFICULT COMPONENTS OF ALL OF OUR JOBS TO ACHIEVE.

ONE, JUST BECAUSE OF THE COST, TWO, BECAUSE IT DOES FEEL LIKE TO SOME NEIGHBORHOODS, IT INCREASES TRANSPORTATION.

I'M SURE YOU'VE HEARD CONCERNS FROM LOTS OF NEIGHBORHOODS AS WE TRY TO INCREASE THOSE CONNECTIVITY.

BUT OUR REGIONAL PLAN CALLS FOR CONNECTIVITY AND TRYING TO CREATE THE MOST CONNECTED NETWORK WE CAN.

IT DOESN'T MEAN THAT WE CAN'T GO IN AND DO RESEARCH AND DETERMINE IF THIS IS STILL IN THE MOST VIABLE OPTION.

I KNOW IT'S HARD WHEN WE LOOK AT THESE THINGS AND WE HEAR THE ISSUES AND THE CONCERNS WITH THE DESIGN.

IT'S ALSO HARD AT THIS STAGE IN THE PROCESS TO COME TO YOU WHEN WE DON'T HAVE THE FINAL DESIGN AS WELL, TO REALLY PROVIDE YOU WITH THE INFORMATION I THINK YOU NEED.

>> JUST TO FOLLOW UP SO I CAN HAVE IT CLEAR IN MY MIND, WHEN THAT UNDERPASS WAS PUT INTO THE REGIONAL PLAN, WHAT WOULD BE 2025, WHERE THE HOUSING BECAUSE HOW I UNDERSTAND THE PATH IN PONDEROSA TRAILS, IF WE DID THE UNDERPASS, IT WOULD GO THROUGH RIGHT AT THE END OF WHERE THE HOUSING DEVELOPMENTS ARE CURRENTLY, WHICH SEEM PROBLEMATIC TO ME IF I WAS A HOMEOWNER THERE TO HAVE THE POTENTIAL OF A CONNECTOR ROAD GOING THROUGH MY NEIGHBORHOOD.

BUT MY QUESTION IS, WERE THOSE HOUSES EVEN THERE DEVELOPED WHEN THAT WAS PUT INTO THE REGIONAL PLAN?

>> I CAN'T ANSWER THAT SPECIFIC QUESTION.

I'D HAVE TO DO SOME RESEARCH FOR YOU.

WHAT I CAN TELL YOU THIS IS THAT'S WHY WE SHOW THOSE CONNECTIVE ROADS IN THE REGIONAL PLAN.

I DON'T KNOW THAT THAT'S ALWAYS ENOUGH TO REALLY INFORM, ESPECIALLY THE INDIVIDUAL HOMEOWNERS THAT THAT'S WHAT THE GREATER ROAD NETWORK IS GOING TO CALL FOR.

IT'S DEFINITELY ONE OF THOSE HARD STICKY TOPICS.

>> WE'VE DEFINITELY SEEN CHALLENGES WITH BRINGING CONNECTIVE ROADS INTO NEIGHBORHOOD 20, 30 YEARS LATER.

IT DOESN'T ALWAYS WORK.

>> AS A PLANNER, I THINK THEY'RE FANTASTIC, BUT I UNDERSTAND YOU'RE VERY HARD JOB OF WORKING THROUGH THOSE ISSUES WITH NEIGHBORHOODS.

I KNOW THOSE CHANGES ARE REALLY HARD.

>> COUNCILMEMBER HOUSE.

>> THANK YOU, MAYOR. I THINK YOU CAN TAKE A SEAT, TIFFANY.

[LAUGHTER] MY QUESTION IS ACTUALLY FOR THE DEVELOPER.

I'M WONDERING IF SOMEBODY CAN EXPAND A LITTLE BIT MORE ON

[03:20:08]

THIS STATEMENT OF THE LIMITED CAPACITY FOR EXPANDING THE CURRENT LOCATION AND THAT ANY EXPANSION WOULD LIMIT THE NET GAIN TO JUST EIGHT ADDITIONAL BEDS WITH THE ADDITION OF A TOWER.

CAN YOU GO FURTHER INTO THAT?

>> THERE WAS A STUDY THAT NAH CONDUCTED BACK IN 2019, ADMITTEDLY BEFORE MY TIME AT NAH.

I HAVE READ IT AND I DO TRUST THE WORK THAT WAS DONE THAT LED US TO THE ULTIMATE DECISION TO PURCHASE THE LAND AT FORT TUTHILL AND GO FORWARD WITH THIS NEW GREENFIELD HOSPITAL.

BUT IN ESSENCE, THE ISSUE IS, WELL, WE MIGHT HAVE 45 ACRES OF LAND.

IT ISN'T 45 ACRES OF VERY USABLE LAND AS OPPOSED TO A PERFECTLY GREENFIELD HOSPITAL.

IN AN ULTIMATE BUILD-OUT ON THE EXISTING CAMPUS, WE WOULD NOT ONLY BE BISECTED IN THE NORTH-SOUTH DIRECTION BY TWO DIFFERENT STREETS.

I THINK MOST OF YOU ON COUNCIL HAVE HEARD OUR PRESENTATION IN THE PAST ABOUT OUR 900 FOOT HORIZONTAL TRAVEL THAT WOULD ONLY FURTHER INCREASE THAT HORIZONTAL.

IT'S THE EXACT OPPOSITE OF WHAT JOHN HAD ARTICULATED ABOUT WHY WE BUILD HOSPITALS IN A VERTICAL SYSTEM FOR PATIENT CARE AND STAFF EFFICIENCY.

WE HAVE QUITE A FEW ELEVATION CHALLENGES, SPECIFICALLY, AS WE START TO HEAD FURTHER EAST WITH THE WASH THAT IS TO THE EAST OF OUR PARTICULAR CAMPUS.

WHEN YOU START TO LOOK AT SOME OF THOSE LIMITING FACTORS OF ACTUAL USABLE LAND, WHEN YOU START TO LOOK AT THE SPRAWL ACROSS THE CAMPUS, AND THEN YOU START TO LOOK AT THE FACT THAT THERE WOULD BE NO WAY TO ACTUALLY BUILD A NEW HOSPITAL, IT'D BE A CONSTANT, KNOCK SOMETHING DOWN, BUILD SOMETHING ELSE IN ITS PLACE, TO KNOCK SOMETHING DOWN, TO BUILD SOMETHING ELSE IN ITS PLACE.

IN DOING THAT, WE WOULD BE CONSISTENTLY CHANGING ENTRANCES INTO THE FACILITY.

IT'D BE CONFUSING FOR PATIENTS AND STAFF FROM A WAYFINDING PERSPECTIVE.

WE WOULD EITHER CLOSE OR IMPEDE CRITICAL SERVICES LIKE OUR EMERGENCY DEPARTMENT WHEN WE HAVE TO KNOCK OUR EMERGENCY DEPARTMENT DOWN TO BUILD SOMETHING ELSE IN ITS PLACE.

WE'D BE PLAYING THIS CONSTANT GAME OF CHECKERS AROUND THE CAMPUS.

NOT ONLY WOULD IT TAKE LONGER AND COST MORE AND HAVE UNDUE BURDEN, IN MY OPINION, ON THE COMMUNITY, IT ALSO WOULDN'T GIVE US A PRODUCT THAT WE WERE HAPPY WITH AT THE END.

IT WOULDN'T MEET ANY OF THE GOALS THAT WE'VE LAID OUT FOR STAFF EFFICIENCY, CLINICAL CARE, QUALITY, SAFETY, AND MAYBE MORE IMPORTANTLY, WE WOULD DO ALL OF THAT WORK TO NEVER BE ABLE TO GROW AGAIN AND NEVER BE ABLE TO INCREASE TO WHAT THIS NEW CAMPUS WILL BRING US ALL THE WAY INTO 2050, WHICH IS AN ULTIMATE BUILD-OUT OF 450 BEDS, WHICH IS ALMOST DOUBLE THE CAPACITY WHICH WE HAVE CURRENTLY, WHICH AS YOU CAN SEE FROM THE POPULATION DATA THAT WE GOT FROM MARICOPA COUNTY GOVERNMENT ASSOCIATION SHOWS A DOUBLING OF NORTHERN ARIZONA REGION PATIENT POPULATION BY 2050.

WE'RE LOOKING AT THIS WELL INTO THE FUTURE AND NOT AS A FIX FOR THE NOW.

>> IF I CAN ADD COUNCIL MEMBER HOUSE AS SOMEONE WHO DID NOT COME FROM AN ARCHITECTURE AND HEALTHCARE DESIGN PLANNING BACKGROUND.

ONE OF THE THINGS THAT I THINK IS HELPFUL TO UNDERSTAND THAT NET GAIN OF JUST EIGHT ADDITIONAL BEDS, WE ARE TWO-THIRDS DOUBLE OCCUPANCY ROOMS RIGHT NOW.

WE HAVE TO GO TO SINGLE OCCUPANCY.

IT'S BELOW THE STANDARD OF CARE, IT'S NOT GOOD FOR PATIENT OUTCOMES, IT'S TERRIBLE IN A PANDEMIC.

IT LIMITS OUR ABILITY TO TAKE PATIENTS BECAUSE IF YOU HAVE SOMEBODY WITH A COMMUNICABLE DISEASE IN ONE BED WELL NOW YOU'VE GOT TO CLOSE DOWN THE OTHER BED.

YOU HAVE GENDER ALIGNMENTS, THINGS LIKE THAT.

PART OF WHAT YOU'RE SEEING IS IT'S ONLY EIGHT ADDITIONAL BEDS BECAUSE WE WOULD HAVE TO GO TO SINGLE OCCUPANCY ROOMS, ESSENTIALLY WIPING OUT TWO-THIRDS OF OUR EXISTING BEDS IN GAIN WHEN WE ADD ALL THOSE ADDITIONAL ROOMS. DOES THAT HELP? THANKS.

>> IT DOES AND IF I CAN ASK ONE FOLLOW-UP QUESTION.

I'M JUST CURIOUS AS TO THE IMPACTS ON THE INCREASED CAPACITY FOR THE NEW LOCATION ON THE, I THINK IT WAS 6,000 THAT WERE SAID WERE DIVERTED OVER THE PAST YEAR BECAUSE OF THE LACK OF CAPACITY AT THE CURRENT LOCATION.

WHAT IS THE ANTICIPATED IMPACT TO THAT NUMBER WITH THE NEW LOCATION?

>> FROM JUST AN OCCUPANCY PERSPECTIVE, IT WOULD NEGATE ALL OF THOSE.

THE ADDITIONAL INCREASE IN BEDS ONE WOULD NEGATE THAT COMPLETELY.

IN ADDITION TO THAT, WE HAVE A PLANNED 44 BEDS THAT WE COULD BRING TO

[03:25:04]

MARKET IN LESS THAN A YEAR WITHOUT HAVING TO ADD TO THE FOOTPRINT OF WHAT YOU SEE IN PHASE 1.

WE HAVE ONE SHELL, 24 BED FLOOR, AND THEN ONE SHELL 20 BED FLOOR IN THIS INITIAL DESIGN, SO WITHOUT INCREASING THE DAY ONE FOOTPRINT, WE'D BE ABLE TO JUST BUILD FROM A TI PERSPECTIVE OR A TENANT IMPROVEMENT INTERIOR PERSPECTIVE, AND ADD 44 BEDS.

THE WAY WE'VE DESIGNED THE PROJECT IS TO NOT PUT IN ANY MORE THAN WE NEED AND TO CONTINUALLY MONITOR IT AND TO CONTINUALLY HAVE TRIGGERS IN THE DESIGN THAT MEET THE NEEDS OF THE COMMUNITY AND SOMETHING THAT WE'RE ABLE TO BUILD INTO AS THE COMMUNITY GROWS.

THERE'S TRIGGERS FOR WHEN THE ED GROWS, THERE'S TRIGGERS FOR WHEN SURGERY WOULD NEED TO GROW AND ALL OF THAT IS MAPPED OUT FOR DECADES TO COME.

>> I THINK ONE OF THE THINGS TOO, WE TALK A LOT ABOUT THE 30 BED INCREASED CAPACITY AT THE NEW FACILITY.

THOSE ARE JUST INPATIENT BEDS.

WE'RE ALSO ADDING 24 OBSERVATION BEDS.

OBSERVATION BEDS ARE FOR PATIENTS THAT ARE TOO SICK TO GO HOME BUT NOT SICK ENOUGH TO BE ADMITTED TO THE HOSPITAL.

THOSE CURRENTLY OCCUPY OUR INPATIENT BEDS.

THE TOTAL BED CAPACITY AGAIN, BEDS THAT WE'RE GOING TO HAVE IS ABOUT 54 ARE ONSET. THAT'LL HELP AS WELL.

>> COUNCIL MEMBER MCCARTHY.

>> JUST A QUICK FOLLOW-UP TO MS. MATTHEWS, COMMENTS OR QUESTIONS.

[NOISE] WHERE AM I GOING WITH THIS? [LAUGHTER] WE'VE BEEN TALKING ABOUT TOO MANY THINGS.

WHAT IS IT THAT YOU TALKED ABOUT? [BACKGROUND] BACK TO THE UNDERPASS. I AM SO SORRY.

I'VE HAD A HARD DAY, BELIEVE ME.

IT'S ABOUT THREE MILES FROM JOHN WESLEY POWELL UP TO LIKE I-40.

WITH THAT MUCH DISTANCE IS PROBABLY GOOD PRACTICE TO HAVE ANOTHER ROUTE ACROSS THE FREEWAY.

IF IT WERE ONLY LIKE SAY A MILE OR A MILE AND A HALF, THEN IT MIGHT NOT MAKE SENSE, BUT AT THREE MILES, IT PROBABLY DOES MAKE SENSE.

I'M JUST WONDERING IF MR. JEFF BOWMAN HAS ANY FOLLOW-UPS TO THAT OR MAYBE IT'S NOT NECESSARY.

BUT IF YOU DO, I'D BE INTERESTED.

>> HI JEFF BOWMAN, CITY TRAFFIC ENGINEER AGAIN.

I THINK YOU'RE RIGHT, IT'S ABOUT THREE MILES WITH OUR ARTERIAL GRID AND FLAGSTAFF, IT'S VERY LIMITED.

WE DON'T HAVE TYPICAL ONE MILES SPACING, BUT THAT IS A RULE OF THUMB OR WHAT YOU'RE LOOKING FOR SO THAT YOU CAN MAINTAIN REASONABLE ROADWAY SIZES AT YOUR RESIDENTIAL AND COMMERCIAL DENSITIES THAT WE'RE LOOKING FOR IN THIS AREA.

AS YOU SPREAD OUT THE ROADS, THE ROADS TEND TO GET BIGGER AND ESPECIALLY THE INTERSECTION.

THAT'S PART OF THE VALUE OF THIS AS WELL AS REDUNDANCY AND KEEPING ROADS SIZES TO WHAT WE'RE LOOKING FOR FOUR LANE ROADS.

>> I'M THINKING OF CMP IN MESA HIGHWAY 60.

I MEAN, THEY HAVE RURAL MCCLINTOCK DOBSON.

THOSE ARE ALL ONE MILE INCREMENTS AND THEY HAVE LIKE, MILL AVENUE IS A HALF-MILE STREET.

THEY'RE GETTING ACCESS OVER THE FREEWAY LIKE EVERY HALF-MILE.

ANYWAY, I'LL LEAVE IT AT THAT.

THANK YOU, JEFF. I APPRECIATE YOU.

>> VICE MAYOR.

>> THANK YOU. I'D LIKE TO CALL STEVE BACKUP.

NOT TO THE STAND BUT TO THE MIC.

[LAUGHTER] STEVE, JUST FULL DISCLOSURE, YOU AND I SAT DOWN VERY RECENTLY.

WE HAD A NICE LONG CONVERSATION.

I CAME TO YOU WITH QUESTIONS OF MY OWN.

I CAME TO YOU WITH QUESTIONS THAT I'M HEARING FROM THE COMMUNITY.

I JUST WANT TO ACKNOWLEDGE TO THE PUBLIC, I THINK WE HAD A VERY FRUITFUL CONVERSATION,, INCREDIBLY RESPECTFUL.

I REALLY APPRECIATE THE TIME YOU GAVE ME.

I HOPE YOU APPRECIATE THE TIME I GAVE YOU.

>> I DID.

>> I THINK IT WAS A GREAT CONVERSATION.

I FELT LIKE THINGS MOVE FORWARD IN MY MIND IN A LOT OF WAYS REGARDING THIS PROJECT.

BUT I WANT TO GRILL YOU WITH SOME POPCORN STYLE QUESTIONS ANYWAY.

A LOT OF THESE QUESTIONS ARE QUESTIONS THAT YOU ANSWERED TO ME PERSONALLY, BUT I THINK THE PUBLIC DESERVES TO BE BROUGHT ALONG IN THEM AND THERE MAY BE A COUPLE OF OTHER QUESTIONS IN THERE TOO.

EXCUSE ME IF I RAMBLE A LITTLE BIT.

ALSO, I JUST REALLY QUICKLY WANT TO SAY THANK YOU TO THE PUBLIC FOR YOUR PATIENCE AS WE'VE GONE THROUGH THESE TWO PRESENTATIONS AND THEIR Q&A SESSION.

VERY EAGER TO HEAR FROM ALL OF YOU.

I DO HOPE YOU WILL STICK AROUND.

[03:30:02]

I HOPE WE CAN HAVE AN EFFICIENT SHORT BREAK AND GET BACK HERE.

YOUR PARTICIPATION IN THIS PROCESS IS ABSOLUTELY JUST AS CRITICAL AND ESSENTIAL AS ANY OF THE OTHER CONVERSATIONS WE'RE HAVING HERE AND I'M SURE A LOT OF YOU ARE EAGER TO WEIGH IN ON WHAT YOU'RE HEARING.

STEVE, LET'S GO THROUGH A COUPLE OF LITTLE THINGS HERE.

I WANTED TO GIVE YOU A CHANCE TO RESPOND DIRECTLY.

I WANT TO HEAR IT FROM YOU ABOUT THE 2,700 KELVIN LIGHTING AND THAT COMMITMENT TO DARK SKIES PRESERVATION AND THE US NAVAL OBSERVATORY IS CRITICAL NATIONAL SECURITY MISSION THAT THEY PROVIDE FOR THE WHOLE COUNTRY.

>> WE ARE COMMITTED TO DARK SKIES ORDINANCE.

WE ARE COMMITTED TO 2,700 KELVIN AND WE HAVE MET WITH THE US NAVAL OBSERVATORY MULTIPLE TIMES AND HAVE HAD OUR PLAN APPROVED BY THEM.

>> WONDERFUL, FANTASTIC.

WE'VE HEARD A LOT ABOUT SOLAR CHARGING STATIONS TONIGHT.

THIS IS GOING TO BE NEW QUESTION FOR YOU I THINK, BUT I WANT TO HEAR MORE PUBLICLY ABOUT ELECTRIC CHARGING STATIONS FOR ELECTRIC VEHICLES.

I THINK THERE'S GOING TO BE AN ENORMOUS GEOMETRIC SHIFT TOWARDS ELECTRIC VEHICLES BY ALL LEVELS OF SOCIETY, STARTING SOON AND RAMPING UP QUICKLY THEREAFTER.

WHAT ARE YOUR PLANS FOR PROVIDING THE ELECTRIC CHARGING STATIONS FOR THE POPULACE AND I'M THINKING PRETTY FAR INTO THE FUTURE HERE WHEN IT'S GOING TO BECOME A VERY CRITICAL COMPONENT?

>> CAN I PHONE A FRIEND FOR ONE SECOND?

>> [LAUGHTER] ABSOLUTELY.

>> IT'S 20, DAY 1 WITH EXPANSION CAPABILITIES FOR THE FUTURE.

>> OKAY. HOW MANY PARKING SPOTS DO YOU HAVE THERE?

>> OVER 2,000.

>> YEAH.

>> YEAH.

>> SO THAT'S NOT ENOUGH.

I UNDERSTAND THAT THAT'S DAY 1.

I WOULD LIKE TO SEE MORE IN A PLAN ABOUT HOW THAT'S GOING TO RAMP UP IN THE SAME WAY THAT YOU'RE COMMITTING TO SOLAR PANELS ON THE GARAGE.

I THINK IT'S A CRITICAL COMPONENT.

IT'S SOMETHING THAT I'M ASKING EVERY SINGLE DEVELOPMENT MOVING FORWARD.

I THINK IT'S AN INEQUITY AND A SOCIAL JUSTICE ISSUE.

AS MUCH AS IT IS A CARBON NEUTRALITY AND ENVIRONMENTAL ISSUE.

WE'RE NOT GOING TO GET EVERYBODY USING ELECTRIC VEHICLES UNLESS EVERYBODY HAS THE SAME ACCESS TO CHARGING PORTS AND THE SAME EASE OF USE OF BEING ABLE TO TAKE ADVANTAGE OF WHAT'S ESSENTIALLY A TOTAL LIFESTYLE CHANGE FOR ALL OF US.

I DON'T KNOW IF YOU WANT TO RESPOND WITHOUT ANY FURTHER.

>> NO. I THINK WE CAN RE-EXAMINE IT INTERNALLY AND HAVE AN ANSWER FOR YOU AND WE MEET AGAIN ON THE 16TH.

>> I WOULD REALLY APPRECIATE THAT. THANK YOU.

GOING BACK TO THE GRADING AT PURPLE SAGE, TIFFANY'S COLLEAGUE MENTIONED THE ISSUE ABOUT AMBULANCES.

IF WE GO BACK LATER AND REGRADE THAT AREA, DO YOU HAVE A RESPONSE TO THAT CONCERN BECAUSE THAT SEEMS LIKE A CRITICAL CONDITION?

>> I DO. IT IS A VALID CONCERN AND I THINK WE DO UNDERSTAND THE IMPLICATIONS TO ONE OF THE ENTRANCES OF OUR CAMPUS.

WE HAVE DESIGNED THE CAMPUS SPECIFICALLY AND PURPOSEFULLY TO HAVE MULTIPLE POINTS OF ACCESS FOR ANYTHING THAT RANGES FROM PLANNED MAINTENANCE TO UNKNOWN ROAD ISSUES, WATERLINE ISSUES, ETC.

I THINK ONE OF THE THINGS THAT WE STRIVE FOR WHEN WE DESIGN A HOSPITAL IS WHAT WE CALL ALL RISK READY AND TO REALLY STRIVE TO MAKE SURE THAT WE HAVE FLEXIBILITY AND RESILIENCY BUILT INTO OUR DESIGN.

I CAN TELL YOU THROUGHOUT MY CAREER, I HAVE CLOSED MANY A MAIN ENTRANCE TO A HOSPITAL.

IT'S NOT SOMETHING WE WANT TO DO, BUT IT IS SOMETHING THAT IS DONE VERY FREQUENTLY.

I THINK IF IT'S SOMETHING THAT WE KNOW IS COMING IN ADVANCE, IF IT'S SOMETHING THAT WE CAN COORDINATE WITH STUFF, WITH PATIENTS THROUGH PROPER SCHEDULING INSTRUCTIONS WHEN THEY MAKE THEIR APPOINTMENTS AND COORDINATION WITH EMS SO THEY KNOW THE ROUTE THAT WE CAN MAKE THAT ACCOMMODATION.

JUST TO TOUCH ON THAT FOR ONE SECOND FURTHER TO GO BACK TO A POINT COUNCILMAN MCCARTHY WAS MAKING EARLIER.

WE'RE NOT ARGUING THE CITY OF FLAGSTAFF TRAFFIC DEPARTMENTS PLANNING OR METRO PLANS PLANNING.

WE'RE NOT SAYING THAT THE ROAD ISN'T NEEDED OR SHOULDN'T BE DONE IN THE FUTURE.

OUR ONLY POINT IS THE RIGHT TIME TO DO IT, IS THE RIGHT TIME TO DO IT.

I THINK THE DISCUSSION THAT WE'VE HEARD TONIGHT CLEARLY ARTICULATED THERE, THERE ARE A LOT OF UNKNOWNS OF WHAT THE FUTURE HOLDS FOR THIS INTERSECTION AND SO TO HOLD US ACCOUNTABLE FOR $6 MILLION CAPITAL INVESTMENT THAT WE COULD TURN INTO THREE OR FOUR BRAND NEW MRI MACHINES FOR THE COMMUNITY INSTEAD OF AN INTERSECTION THAT WE DON'T KNOW THE RESULT OF IS SOMETHING THAT WE WOULD RATHER PUSH TO THE RIGHT TIME.

>> OKAY. YEAH. STEVE, THANK YOU SO MUCH FOR THAT.

I REALLY SEE HOW THAT MAKES A LOT OF LOGICAL SENSE FROM YOUR PERSPECTIVE.

I DO THINK I DISAGREE WITH YOU.

[03:35:02]

I THINK MOSTLY WE'RE HAVING AN INTERNAL DEBATE UP HERE ABOUT WHETHER OR NOT PURPLE SAGE CONNECTIVITY IS NECESSARY.

I LIVE IN PONDEROSA TRAILS.

I DON'T WANT TO SEE THAT ROAD COME THROUGH THERE.

PERSONALLY FROM A RESIDENT'S PERSPECTIVE.

THAT'S NOT SOMETHING I'M INTERESTED IN, BUT IT'S AN ORIGINAL PLAN AND I DO THINK, ESPECIALLY IF A HOSPITAL IS GOING TO GO IN THERE, THAT INCREASED REDUNDANCY IS ABSOLUTELY CRITICAL.

I'M VERY MUCH OF THE MINDSET THAT WE OUGHT TO DO IT ONCE AND DO IT RIGHT, AND GET IT DONE WITH THEN HAVE TO THINK ABOUT THAT MULTIPLE YEARS DOWN THE LINE WHEN WE'RE PRETTY SURE IT'S GOING TO HAPPEN, AND GETTING IT DONE MIGHT HELP FACILITATE THAT HAPPENING.

THAT'S ANOTHER LITTLE INTANGIBLE THERE.

BUT I UNDERSTAND WHERE YOU'RE COMING FROM.

FROM YOUR POINT OF VIEW.

IT MAKES A LOT OF SENSE THAT YOU WOULD ADVOCATE FOR THAT.

ANOTHER QUESTION. YOU AND I TALKED ABOUT THIS.

THIS ISN'T A GOT YOUR QUESTION.

I REALLY APPRECIATED YOUR ABILITY TO NIMBLY RESPOND TO THE QUESTION.

THIS ISN'T REALLY SOMETHING THAT I'M CONCERNED ABOUT, BUT I KNOW MANY IN THE COMMUNITY ARE, SO I'M GOING TO PREEMPTIVELY ASK YOU ABOUT IT.

A LOT OF CONCERN THAT THIS NIH PROJECTS IS GOING TO BE FLIPPED AFTER A FEW YEARS FOR INVESTMENT PURPOSES AND THAT BANNER HEALTH OR SOME OTHER FOR-PROFIT HEALTHCARE ORGANIZATION IS GOING TO POUNCE ON IT AND TAKE OVER.

I WANTED TO GIVE YOU A COUPLE OF MINUTES OR AS LONG A TIME AS YOU NEED TO ADEQUATELY RESPOND TO THAT VERY LEGITIMATE PUBLIC FEAR.

>> OKAY. THANK YOU. GREAT QUESTION AND I'VE HEARD THE SAME QUESTION FROM A COMMUNITY PERSPECTIVE. I'LL SAY THIS.

ANY OF MY COLLEAGUES CAN JUMP IN AFTER I'M DONE TALKING AND GIVE THEIR OPINIONS ON THIS MATTER.

NIH IS COMMITTED TO STAYING AN INDEPENDENTLY OWNED REGIONAL COMMUNITY HEALTH CARE SYSTEM.

MAKING AN INVESTMENT AT THE SCALE AND SIZE WE'RE MAKING IS TRULY SHOWING THAT COMMITMENT.

I THINK THE ANALOGY I USED FOR YOU AND WE WERE MEETING ONE-ON-ONE WAS FROM A PURELY BUSINESS PERSPECTIVE.

IF YOU'RE TRYING TO SELL YOUR BUSINESS, PUTTING HUNDREDS OF MILLIONS OF DOLLARS WORTH OF DEBT ON YOUR BOOKS IS NOT HOW YOU SELL YOUR BUSINESS.

YOU SELL YOUR BUSINESS BY REDUCING OVERHEAD AND TRYING TO INCREASE PROFIT MARGINS.

NONE OF US CAN SIT HERE AND TELL YOU WHAT THE FUTURE HOLDS FOR DECADES TO COME.

BUT PART OF THE DEVELOPMENT OF THIS PROJECT IS SPECIFICALLY TO BE ABLE TO MAINTAIN INDEPENDENCE AND TO CONTINUE OUR VISION AND MISSION TO SERVE THE REGION OF NORTHERN ARIZONA AND WE KNOW THAT WE CAN'T DO IT IN OUR EXISTING FACILITY.

>> ANYBODY ELSE? JOSH, YOU DON'T HAVE TO ADD TO THAT UNLESS YOU HAVE SOMETHING TO ADD.

>> YEAH, I WON'T BE AS GOOD AS STEVE OBVIOUSLY, BUT YEAH, WHAT HE ARTICULATES IS EXACTLY RIGHT, WHAT WE DO KNOW AND STAYING IN THE EXISTING CAMPUS, YOU SAW SOME OF THE EFFICIENCY NUMBERS JUST IN TERMS OF ENERGY USAGE, THEIR STAFFING EFFICIENCIES.

WE'VE TALKED A LOT ABOUT THAT YOU HAVE 13-BED UNITS, YOU CAN NEVER GET TO EFFICIENT STAFFING RATIOS THERE.

FOR US TO CONTINUE TO PROVIDE HIGH-QUALITY CARE IN A HIGH-VALUE MANNER.

TO REMAIN SUSTAINABLE, WE DO NEED TO GET TO A NEW FACILITY.

>> SINCE YOU'RE UP HERE, JOSH, I MIGHT ASK YOU ANOTHER QUESTION THAT'S COME UP A LOT TOO, ABOUT NURSES AND STAFFING AND HEALTH CARE PERSONNEL AND THE QUESTION OF WHETHER OR NOT THE EFFICIENCY AT FLAGSTAFF MEDICAL CENTER IS MORE RELATED TO THOSE CONCERNS, STAFFING ISSUES RATHER THAN BED CAPACITY AND OTHER TECHNOLOGY UPGRADES THAT YOU FEEL ARE IMPORTANT.

COULD YOU PLEASE EXPLORE THAT SPACE FOR US A LITTLE BIT? I'LL TRY TO QUICKLY GO THROUGH THAT.

IT MIGHT BE SURPRISING TO MANY RIGHT NOW TODAY IT LIKES THAT MEDICAL CENTER AND ACROSS ALL OF NIH, WE'RE 94% CORE STAFF.

IT MEANS THAT 94% OF ALL THE STAFF THAT WE EMPLOY, OUR LONG-TERM EMPLOYEES ARE EMPLOYED WITH THE ORGANIZATION THAT LEAVES ABOUT 6% OF OUR STAFF CURRENTLY TRAVELERS.

ACROSS THE BOARD WHEN YOU LOOK AT JUST STRICTLY CLINICAL AREAS, THE ONE I LIKE TO LOOK AT MOST IS NURSING.

WE'RE ABOUT 81% CORE ACROSS THE BOARD NOW THERE ARE CERTAINLY AREAS THAT MAY HAVE BEEN HIT HARDER IMAGING AND MAYBE THE OR MAYBE THE EMERGENCY DEPARTMENT IN TERMS OF TRAVEL STAFF, HISTORICALLY WOULD WE'D RUN ABOUT 90-95% CORE STAFF, PRE-PANDEMIC.

BUT WE'RE SEEING A PRETTY GOOD UPTAKE IN THAT OUR TURNOVER RATES ARE DOWN WELL BELOW NATIONAL AVERAGE.

NOW, I THINK THAT'S A TESTAMENT TO THE STAFF THAT WE WERE ABLE TO RECRUIT BECAUSE YOU HEAR THAT A LOT.

YOU'RE NOT ABLE TO STAFF THE NEW FACILITY.

YOU CAN'T STOP THE ONE YOU HAVE TODAY.

THOSE ARE SOME OF THOSE KEY THINGS.

THEN THERE'S A MULTITUDE OF EFFICIENCY WHEN YOU THINK ABOUT OVERALL STAFFING, BOTH FROM A NURSING PROSPECTIVE PATIENT CARE TECH, I THINK TIFFANY'S AND THE AUDIENCE TOO, SHE COULD PROBABLY COME DOWN HERE AND TALK.

[03:40:01]

SHE'S OUR CHIEF NURSING OFFICER.

AND THEN WE'VE ALSO TALKED ABOUT VERTICAL INTEGRATION VERSUS HORIZONTAL INTEGRATION AND THE AMOUNT OF EFFICIENCY YOU CAN PICK UP FROM CLEANING TO SUPPLIES.

SOMETHING AS SIMPLE AS HAVING THE SAME SUPPLY ROOM ON EVERY SINGLE FLOOR AND WHERE EVERYTHING IS LOCATED CREATES MORE EFFICIENCY AND EASIER WORK ENVIRONMENT FOR THE STAFF BY NO MEANS IS DELIVERING THE TYPE OF HEALTH CARE THAT WE DELIVER A FLAGSTAFF MEDICAL CENTER EASY, BUT IT MAKES IT EASIER WHEN YOU KNOW THAT YOUR BLOOD TUBES ARE IN THE SAME SPOT, YOUR CHUCKS ARE IN THE SAME SPOT, ETC. I DON'T KNOW IF THAT ANSWERS YOUR QUESTION.

>> NO, THANK YOU. IT SOUNDS LIKE YOU GUYS HAVE YOUR OWN TIFFANY.

I'M SURE SHE CAN'T COMPARE TO OUR TIFFANY, BUT I WOULD LOVE TO HEAR FROM HER IF SHE HAS ANYTHING TO ADD TO THIS.

I KNOW IT'S A TOPIC OF BIG CONCERN IN TERMS OF SOME OF THE FEARS IN THE SKEPTICISM OUT THERE ABOUT THE PROJECT AND ITS NECESSITY.

>> GOOD EVENING. THANK YOU. YES. TIFFANY LAURANO, CHIEF NURSING OFFICER.

>> I'M SURE YOU'RE JUST AS GOOD AS THE ART TIFFANY, I JUST HAD TO SAY THAT.

>> NO, I'VE HAD AN OPPORTUNITY TO LISTENER TO HER FOR MANY HOURS.

I WOULD SAY SHE FAR EXCEEDS ME.

I'M A NURSE AT NORTHERN ARIZONA HEALTHCARE.

I'VE BEEN THERE FOR THE LAST 23 YEARS, CURRENTLY NOW FUNCTIONING AS A CHIEF NURSING OFFICER, INCREDIBLY INVESTED IN THE COMMUNITY.

I'VE BEEN HERE AND I'VE STAYED FOR AS LONG AS I HAVE BECAUSE I LOVE CARRYING FOR OUR FLAGSTAFF COMMUNITY.

OUR STAFF DOES AN AMAZING JOB IN THE FACILITY WE HAVE.

HOWEVER, THERE'S LOTS OF OPPORTUNITY TO MAKE IT BETTER FOR STAFF.

WHEN I THINK ABOUT RECRUITING STAFF AND WHEN I THINK ABOUT BRINGING STAFF TO OUR FACILITY AND ASKING THEM TO CARE FOR PATIENTS THAT ARE IN DOUBLE ROOMS ARE ASKING THEM DURING THE PANDEMIC TO CARE FOR PATIENTS WHEN HVAC SYSTEMS WERE FALLING ON THEIR HEAD BECAUSE WE HAD A DUCK TAPE IN PLACE.

IT'S CHALLENGING FOR STAFF TO WANT TO STAY WITH US.

I THINK JOSH MAKES A BEAUTIFUL POINT ABOUT HOW WELL WE'VE BEEN ABLE TO RETAIN STAFF.

THAT'S BECAUSE OF OUR LEADERSHIP TEAM, THAT'S BECAUSE OF WHO WE ARE AT NORTHERN ARIZONA HEALTHCARE.

WHEN I THINK ABOUT A NEW FACILITY, I HAVE NO DOUBT, NO QUESTION.

IT WILL MAKE A SIGNIFICANT DIFFERENCE IN OUR ABILITY TO BE ABLE TO RECRUIT NEW STAFF.

THINKING ABOUT PRIVATE ROOMS, THINKING ABOUT ROOMS WHERE PATIENTS HAVE WINDOWS AND THE ABILITY TO LOOK OUT INTO NATURE.

THINKING ABOUT A CAMPUS WHERE OUR STAFF HAVE THE OPPORTUNITY TO TAKE A BREAK AND WALK ALONG IN THE URBAN TRAIL TO SIT OUTSIDE AND EAT THEIR LUNCH.

IT WILL MAKE A DIFFERENCE NOT ONLY FOR OUR PATIENTS BUT ALSO FOR OUR STAFF.

>> WELL, THANK YOU. THAT'S A GREAT ANSWER.

I THINK ON THE SURFACE, AT LEAST IT MAKES A LOT OF SENSE AND IT SEEMS REASONABLE.

>> THANK YOU.

>> I APPRECIATE IT. A COUPLE MORE QUESTIONS. STEVE, I'LL LET YOU ANSWER THIS ONE FIRST.

I SEE YOUR SLIDE HERE AND I'VE LOOKED AT THE PROCESS YOU'VE GONE THROUGH ALREADY AND THE PROCESS THIS UP AHEAD FOR RE-PURPOSING THE LEGACY CAMPUS.

BUT I JUST WANT TO ASK YOU DIRECTLY HERE IN PUBLIC AND GET YOUR MAGIC EIGHT BALL OUT.

NOT PINNING YOU TO ANYTHING BECAUSE OBVIOUSLY THAT WOULD BE RIDICULOUS.

BUT WHAT DO YOU THINK IS GOING TO BECOME OF THAT SITE? WHAT ARE SOME THOUGHTS? MAYBE ONE OR TWO OR THREE DIFFERENT SCENARIOS.

>> SURE. JUST FOR STARTERS, I'D LIKE TO MAKE TWO DECLARATIVE STATEMENTS.

ONE, WE'RE COMMITTED TO REDEVELOPMENT OF THE EXISTING CAMPUS.

AGAIN, WE CAN'T PREDICT THE FUTURE.

WE DON'T KNOW WHAT THE MARKET IS GOING TO BE LIKE, BUT WE ARE COMMITTED TO REDEVELOPMENT OF THE EXISTING CAMPUS.

TWO, AS EVIDENCED BY THE PLAN WE'VE ALREADY PUT IN PLACE WITH PUMA, WE ARE COMMITTED TO A COMMUNITY FACING REDEVELOPMENT THAT MORE THAN LIKELY WE'LL BE BACK IN FRONT OF THIS VERY GROUP OR SOME GROUP OF MAYOR AND COUNCIL FOR A REZONING AND SO THE COMMUNITY WILL ABSOLUTELY HAVE THEIR SAY AS WELL CITY LEADERSHIP.

BUT TO GET TO YOUR OTHER QUESTION FROM A COMPLETELY OPINION PERSPECTIVE, WHAT I ENVISION IS AN UNBELIEVABLY VIBRANT MULTI-USE FACILITY THAT IS A COMPLEMENT TO DOWNTOWN FLAGSTAFF.

I ENVISION SOME FORM OR FASHION OF TRUE INFILL HOUSING WHICH IF YOU JUST RUN THE NUMBERS IS ONE PATH FORWARD TO TRUE AFFORDABLE HOUSING BECAUSE LAND COSTS ARE DEPRECIATED, UTILITIES ARE THERE, WALLS ARE THERE, ROOFS ARE THERE.

WHEN I SAY UTILITIES, THERE ARE MORE UTILITIES THAN ANYONE'S GOING TO KNOW WHAT TO DO WITH, BY THE WAY.

I DON'T SEE THE WHOLE ENTIRE CAMPUS BECOMING THAT.

I SEE US CONTINUING TO TRY AND FORGE PARTNERSHIPS WITH NAU AND CCC AND WHAT THE POTENTIAL FOR GROWTH AND PARTNERSHIPS WITH THEM COULD LOOK LIKE.

I SEE PARTS OF THE OLD HOSPITAL BEING ABLE TO BE TURNED INTO NURSING SIMULATION CENTERS TO CONTINUE TO GROW THE MEDICAL STAFF FROM BOTH A NURSE AND PHYSICIAN PERSPECTIVE FOR THE REGION, I SEE THE ABILITY TO REUSE PARTS OF A HOSPITAL THAT ARE UNIQUE,

[03:45:04]

LIKE A FULL PRODUCTION KITCHEN FOR SOMETHING THAT COULD BE REALLY COOL, LIKE A NON-PROFIT COMMUNITY FOOD CENTER OR SOMETHING TO THAT EFFECT.

I SEE SMALL SPACES ON THE FIRST FLOOR FOR BUSINESS INCUBATORS.

I SEE THE POTENTIAL FOR SKILLED NURSING AND MEMORY CARE CENTER.

WHAT I SEE IS 660,000 SQ FT OF OPPORTUNITY TO DO SOMETHING REALLY COOL FROM AN INFILL PERSPECTIVE IN A CITY THAT I THINK WOULD REALLY EMBRACE A TRUE URBAN INFILL MULTI-USE PROJECT.

>> THAT WAS MORE THAN THREE ANSWERS.

>> THAT LAST ONE WAS ONE LONG ANSWER IN MY DEFENSE.

>> YOU MISSED THE OPPORTUNITY TO SAY TRADER JOE'S, I THINK YOU WERE [LAUGHTER].

>> YOU GOT TO TALK TO TRADER JOE ABOUT THAT.

>> A 660,000 SQUARE FOOT TRADER JOE.

>> THAT'S A LOT OF ORANGE CHICKEN.

[LAUGHTER].

>> GETTING SERIOUS AGAIN, I DO STILL HAVE A LOT OF QUESTIONS.

I AM FILLED WITH A LOT OF CONCERNS STILL AND I'LL SAVE MY COMMENTS FOR LATER.

BUT ONE FINAL QUESTION FOR YOU, AND THIS IS AN AUTHENTIC QUESTION.

WE KNOW HOW IMPORTANT THE REDEVELOPMENT OF THAT OLD CAMPUS IS AS PART OF THE OVERARCHING CONCERN FOR THE COMMUNITY.

COULD YOU PLEASE HELP US UNDERSTAND BETTER WHY WE'RE NOT FURTHER ALONG IN THAT PROCESS OF MAKING COMMITMENTS THERE AND DEVELOPMENT AGREEMENT AND GETTING THINGS DOWN IN PAPER AND SHAKING HANDS ON SOME OF THIS STUFF.

>> SURE A COUPLE OF REASONS.

>> I WOULD'VE LIKED TO HAVE SEEN US A BIT FURTHER ALONG.

I'LL JUST ADD THAT COMMENTARY.

>> I UNDERSTAND AND I CAN APPRECIATE THE COMMENTARY AND I'LL GIVE YOU OUR PERSPECTIVE. A COUPLE OF THINGS.

ONE, WE'VE BEEN REALLY BUSY DOING THE WORK WE'VE BEEN DOING.

WE'VE BEEN VERY FOCUSED ON WHAT WE CONSIDER TO BE STEP ONE IN THE PROCESS AND PUTTING ALL OF OUR TIME, EFFORT AND ENERGY INTO WORKING WITH CITY STAFF ON MAKING THIS THE ABSOLUTE BEST PROJECT THAT WE COULD BRING TO THIS COUNCIL.

TWO, AND MAYBE THE MORE IMPORTANT ONE THAN OUR OWN WORKLOAD AND OUR OWN FOCUS IS, I PERSONALLY THINK IT IS IRRESPONSIBLE FOR US TO GUESS WHAT THE COMMUNITY IS GOING TO DIRECTLY NEED IN THE YEAR 2030.

IT'S SEVEN YEARS AWAY NOW.

IT WAS EIGHT YEARS AWAY WHEN I STARTED TALKING ABOUT THIS.

BUT EIGHT YEARS IS A REALLY LONG TIME FROM A DEVELOPMENT PERSPECTIVE.

IT'S A VERY LONG TIME TO UNDERSTAND ECONOMIC IMPACT AND GROWTH THROUGHOUT THE REGION AND THE COUNTRY.

I'VE USED THIS ANALOGY, I BELIEVE AT THIS DAY AS BEFORE, AND I'M GOING TO USE IT AGAIN.

IN THE TWO PRECEDING EIGHT YEARS, WE HAD COVID AND WE HAD THE BIGGEST HOUSING CRISIS IN THE HISTORY OF OUR COUNTRY.

I ASSURE YOU WHATEVER DECISIONS WE MADE TODAY, IF WE HAD AN EVENT LIKE THOSE TWO, WOULD CHANGE THE PATH OF WHAT THAT DEVELOPMENT IS GOING TO BE.

SIMILAR TO OUR DISCUSSIONS ABOUT PURPLE SAGE AND BEULAH, WE'RE NOT TRYING TO SKIRT THE ISSUE.

WE ARE COMMITTED TO DOING IT AS EVIDENCED BY THE COMMITMENT IN THE DA.

WE'RE TRYING TO MAKE SURE WE DO THE RIGHT THING AT THE RIGHT TIME AND IN LIEU OF MAKING WHAT I WOULD CONSIDER TO BE FALSE COMMITMENTS IN 2023, I'D RATHER DELIVER SOMETHING EXCELLENT TO THE COMMUNITY IN 2029.

>> FAIR ENOUGH AND I THANK YOU FOR RESPONDING TO THAT.

I THINK IT IS A THOUGHTFUL ANSWER.

IT LEAVES ME A LITTLE UNSATISFIED STILL, JUST TO BE TOTALLY HONEST WITH YOU AND WITH THE PUBLIC, I FEEL THERE WAS A MISSED OPPORTUNITY IN TERMS OF TAKING A TWO-TRACK APPROACH TO THIS AND FULL STEAM AHEAD ON BOTH.

THAT IS SOMETHING YOU'LL HAVE TO RECONCILE WITH I THINK.

I BELIEVE LOWELL OBSERVATORY MIGHT BE FEELING SOME OF THE PAINS OF HAVING GONE ABOUT A RECENT DEVELOPMENT PROPOSAL.

PUTTING THE CART BEFORE THE HORSE AND I DO SIT WITH THE TENSION OF THAT STILL.

BUT I APPRECIATE YOU BEING ABLE TO RESPOND TO THAT TO ME AND I'M SURE YOU'LL HEAR MORE ABOUT IT FROM THE PUBLIC AS WELL.

I DID WANT TO SAY I HAD QUESTIONS ABOUT THE BEDS.

THANK YOU COUNCIL MEMBER HOUSLEY.

I THINK YOU'VE COVERED THOSE VERY WELL AND I WILL YIELD MY TIME BACK.

MAYBE WHATEVER THAT MEANS. I'M DONE.

>> THANK YOU VICE MAYOR. COUNCIL MEMBER SWEET.

>> THANK YOU, MAYOR, STEVE.

FIRST OFF, I WANT TO THANK YOU FOR TAKING THE TIME TO MEET WITH ME A FEW TIMES PRIOR TO TONIGHT AND ANSWERING ALL OF MY QUESTIONS, WHICH I HAD A LOT OF.

I APPRECIATE YOUR COMMITMENT TO MEETING WITH THE COUNTY MONTHLY DURING THIS PROCESS.

I THINK THAT THAT'S GOING TO BE HUGE.

THEY ARE A PARTNER RIGHT THERE ALONGSIDE THIS PROJECT, AND I HAVE EVERY FAITH THAT YOU WILL KEEP THEM IN THE LOOP AND KEEP THAT COMMUNICATION OPEN.

[03:50:04]

THE BUILDING ENVELOPE SEEMS CLOSE TO THE TRAIL SYSTEM OUT AT FORT TUTHILL SO I'M WONDERING, ARE THERE ANY PLANS TO WORK ON MOVING THE TRAIL? HOW ARE WE GOING TO MITIGATE THE IMPACTS OF THAT BUILDING ENVELOPE?

>> I'M GOING TO ASK [INAUDIBLE], CIVIL ENGINEER TO ANSWER. THANK YOU.

>> GOOD EVENING GUILLERMO CORTES, 110 WEST DALE WITH SWI DURA.

ARE YOU TALKING ABOUT THE SOLDIERS TRAIL?

>> I AM.

>> SOLDIERS TRAIL IS ACTUALLY RIGHT NEXT TO PURPLE SAGE, THAT INGRESS EGRESS AXIS WE WERE TALKING ABOUT.

WE'RE ACTUALLY STARTING OR PROPOSING THE PURPLE SAGE ROAD ON THE COUNTY PROPERTY TO ACTUALLY START WAY BEYOND EVEN THE ASPHALT PAVEMENT IS THERE TODAY, SO IT'S ACTUALLY MOVING WEST ALREADY.

WE'RE ACTUALLY GIVING BACK ABOUT 14 FEET OR NOT GIVING BACK, BUT WE'RE NOT UTILIZING 14 FEET OF THE EXISTING INGRESS EGRESS ACCESS EASTMAN, THAT'S THERE.

NOW, THERE'S A SMALL PORTION THAT WE DID TALK TO THE COUNTY ABOUT MAYBE WE MOVE A LITTLE BIT IF NEEDED.

BUT WE ACTUALLY HAVE EVEN AN URBAN TRAIL THAT'S EVEN BEING PROPOSED IN THAT AREA, EAST, WEST, SO FURTHER PUTTING AWAY THE ACTUAL OR PUTTING FURTHER WEST THE ACTUAL PURPLE SAGE ROAD.

>> THANK YOU. NEXT QUESTION IS, I THINK, SO THE COUNTY HAS EVENTS OUT AT FORT HOOD HALL AND THEY GO UNTIL 10, 11 O'CLOCK AT NIGHT.

IS THAT A CONCERN FOR THE HOSPITAL AT ALL?

>> IT IS NOT A CONCERN FOR THE HOSPITAL, AND IT'S SOMETHING WE'VE INCORPORATED INTO OUR DESIGN FROM AN ACOUSTICS PERSPECTIVE ON OUR EXTERIOR SKIN.

IT IS SOMETHING THAT THE COUNTY HAS MADE US AWARE OF AND NIH HAS NO PROBLEM EITHER STATING IT FORMALLY HERE, OR ASSIGNING SOMETHING THAT WE WILL NOT BE MAKING NOISE COMPLAINTS.

ONE OF THE THINGS I WANTED TO TOUCH ON IN OUR COUNTY SLIDE EARLIER THAT I DIDN'T GET TO TOUCH ON BECAUSE WE WERE RUNNING SHORT ON TIME WAS THAT WE ALSO THINK WE CAN POTENTIALLY HELP WITH OVERFLOW PARKING AND SOME OTHER THINGS THAT WE COULD PROBABLY WORK ON A MUTUAL AGREEMENT ON.

WE ARE A VERY DENSE PARKING FIELD, BUT TYPICALLY REALLY ONLY FOR ABOUT 12 HOURS OF THE DAY AND QUITE A BIT OF THAT PARKING GOES UNUSED.

I SAID EARLIER, I THINK IT'S A PARTY WOULD HAVE DONE A BETTER JOB UP TO NOW IN FOSTERING, BUT IT IS ONE WE'RE COMMITTED TO CONTINUING IN THE FUTURE.

>> THANK YOU. THAT WAS GOING TO BE ONE OF MY QUESTIONS.

I KNOW YOU'RE FAMILIAR WITH THE FORT TUG HILL MASTER PLAN AND THEY HAVE A LOT OF IMPROVEMENTS ON THE WAY WITH THE RV PARK OR MOTTOS, THE AMPHITHEATER, AND THERE'S NOT REALLY A PROMISE OR ANYTHING IN THE PRESENTATION TALKING ABOUT NAH, HONORING THAT PROCESS AND BEING A PARTNER DURING THEIR MASTER PLAN REMODEL.

CAN YOU ADDRESS A LITTLE BIT?

>> YEAH. I THINK WE'VE PUBLICLY SAID AND PUT IN WRITING THAT WE WANT TO PARTICIPATE IN THAT MASTER PLAN PROCESS.

AGAIN, I THINK IT'S HARD FOR US TO BE DECLARATIVE IN ACTUALLY EXACTLY WHAT WE WOULD DO BUT WE'RE MORE THAN HAPPY TO PARTICIPATE IN THAT PROCESS, AND TO COOPERATE THROUGH THAT PROCESS.

>> THANK YOU. I HAVE ONE SUSTAINABILITY QUESTION AND I THINK YOU KNOW WHAT IT'S GOING TO BE.

I ASKED YOU EARLIER.

BUT FOR THE PUBLIC, THE CITY HAS JOINED THE GREEN PARTNER PROGRAM WITH APS, AND I'M WONDERING IF YOU ALL WOULD BE WILLING TO JOIN THE PROGRAM AS WELL.

>> WE WILL.

>> THANK YOU. COUNCIL MEMBER MATTHEWS.

>> THANK YOU, MAYOR. ALL ESSENCE YOU'RE UP HERE, STEVE, I'LL GO WITH YOUR QUESTIONS FIRST.

I RUN A NON-PROFIT, SO I HAVE A LITTLE BIT MORE UNDERSTANDING THAT MAYBE SOME PEOPLE IN THE PUBLIC UNDERSTAND AND THERE'S BEEN A LOT OF COMMUNITY COMMENTS ABOUT AND I THINK YOU ADDRESSED IT A LITTLE BIT, BUT I JUST WANTED TO HONE IN ON A LITTLE BIT MORE TO CLARIFY THE HOSPITAL'S BOARD OF DIRECTORS IS A VOLUNTEER GROUP?

>> CORRECT.

>> IF BECAUSE WE DON'T KNOW THE FUTURE, WE CAN'T PROMISE THAT WE WERE NOT GOING TO SELL IN THE FUTURE.

IF THE HOSPITAL WAS TO SELL TO A FOR-PROFIT HOSPITAL OR ANOTHER NON-PROFIT, I DON'T KNOW WOULD THE BOARD MEMBERS OR STAFF GET ANY TYPE OF BONUS INCENTIVE TO MOVE FORWARD ON THAT?

>> WE DO NOT HAVE ANYTHING LIKE THAT CURRENTLY CONTRACTUALLY.

I THINK THE POINT JOSH WAS TRYING TO MAKE EARLIER WHEN HE WAS SAYING THAT WE HAVE NO FINANCIAL TIES, WE ARE SALARIED EMPLOYEES ON A TYPICAL SALARY AND BONUS STRUCTURE SIMILAR TO OTHER HEALTH CARE SYSTEMS BUT WE HAVE NO PERCENTAGE STAKE IN THE COMPANY NOR DOES OUR BOARD.

>> I JUST WANT TO ADD TO THAT,

[03:55:01]

THAT THE NON-PROFIT THAT I RUN, THE EQUITY IN OUR PROPERTY IS OVER A MILLION DOLLARS, AND IF I WAS TO CLOSE DOWN MY NON-PROFIT.

I CANNOT TAKE THAT MONEY HOME.

[LAUGHTER] I JUST WANTED TO CLARIFY THAT THE NON-PROFIT WORLD, IT'S VERY DIFFERENT THAN A FOR PROFIT WORLD.

I ALSO WANTED TO, AND TIFFANY TOUCHED ON THIS IN ONE OF OUR MEETINGS THAT I HAD WITH SOME OF THIS HOSPITAL REPRESENTATIVES MADE A COMMENT THAT I THOUGHT WAS REALLY IMPORTANT TO REPEAT HERE, AND THAT IS THAT THE CURRENT TECHNOLOGY, AND MY HUSBAND AND I HAVE HAD THE OPPORTUNITY TO EXPERIENCE FIVE DAYS AT THE HOSPITAL [LAUGHTER] TWO MONTHS AGO BUT THE CURRENT TECHNOLOGY TO ATTRACT NEW HEALTH CARE PROFESSIONALS INTO FLAGSTAFF IN THE HOSPITAL IS CHALLENGING BECAUSE IT'S OUTDATED ENOUGH THAT NEW HEALTH CARE PROFESSIONALS AREN'T TRAINED IN THE TECHNOLOGY THAT YOU ARE USING TODAY. IS THAT CORRECT?

>> THAT IS CORRECT TO SOME EXTENT.

I THINK THE COMMENT THAT WAS MADE WAS THAT WE NEED TO BE BUILDING AND PROCURING EQUIPMENT FOR WHAT STUDENTS ARE LEARNING IN SCHOOL RIGHT NOW AND NOT WHAT PHYSICIANS ARE USING RIGHT NOW, AND WE DO NOT HAVE THE CAPACITY FROM A ROOM PERSPECTIVE.

WE DON'T HAVE THE INFRASTRUCTURE FROM A DATA POWER COOLING PERSPECTIVE, SO IT IS A LIMITING FACTOR OF OUR ABILITY TO BE ABLE TO GROW OUR TECHNOLOGY.

>> THANK YOU. THEN I HAVE A QUESTION FOR TIFFANY.

I DON'T MEAN TO [BACKGROUND] THIS ONE OUR TIFFANY.

I'M SORRY TO KEEP ASKING THIS QUESTION, BUT IT IS GOING TO BE AN ISSUE THAT WE HAVE TO RESOLVE MOVING FORWARD, SO I'M GOING TO GO BACK TO THE PURPLE SAGE.

I UNDERPASS. WHEN WE DO THE UNDERPASS, WHAT IS THE ESTIMATED COST IF WE WERE TO DO IT? LET'S SEE, IN THE NEXT FIVE YEARS BECAUSE I KNOW CONSTRUCTION COSTS KEEP GOING UP, BUT JUST AN ESTIMATE TODAY.

>> I CAN WORK ON GETTING A NUMBER FOR YOU.

A ROUGH ESTIMATE THAT'S NOT SOMETHING I COULD PRODUCE.

>> IS IT FIVE MILLION OR 40 MILLION OR I MEAN, JUST A ROUGH ESTIMATE AND I'LL GET TO A POINT IF YOU'D GIVE ME.

>> FIFTY. IT'S THE HIGHER END OF THE 50 ISH.

>> JUST COMING OUT OF THE BUDGET RETREATS, I DON'T PREDICT THAT WILL PULL THAT OUT OF THE GENERAL FUND AND SO WE WOULD LOOK FOR GRANT MONEY OR PARTNERSHIP MONEY.

>> YEAH. PART OF I DON'T HAVE THAT ANSWER TO THE QUESTION RIGHT NOW.

>> WHERE I WAS GOING WITH THAT WAS I WAS JUST CURIOUS FOR MY OWN BENEFIT WHEN WE HAD THIS DISCUSSION THAT IF WE HAD TO GO FOR SOME TYPE OF FEDERAL ESTATE AND ASSISTANCE, THE GRADING AND THE WHOLE DEVELOPMENT WOULD BE INCLUDED IN THAT PROPOSAL TO GET GRANT FUNDING. IS THAT CORRECT?

>> WELL, RIGHT NOW, WE HAVE A COMMITMENT FROM NADH THAT IF AND WHEN WE HAVE THE REMAINDER OF THE FUNDING TO COVER THE UNDERPASS, THAT THEY WOULD COVER THE LOWERING OF THE INTERSECTION ON WITHIN THEIR PROJECT BOUNDARIES.

>> FAIR ENOUGH. TYPICALLY, IT'S A BIG PROJECT, BUT I UNDERSTAND WHAT YOU'RE SAYING.

>> COUNCIL MEMBER HARRIS?

>> I'M GOING TO THINK I'M GOING TO TAKE US IN ANOTHER DIRECTION, SO TIFFANY FROM THE HOSPITAL [LAUGHTER].

HI, TIFFANY.

>> HI.

>> THANK YOU. I HAD THE OCCASION TO BE IN YOUR NICU UNIT A FEW DAYS AGO.

I WANT YOU TO TALK A LITTLE BIT ABOUT HOW MANY BITS YOU HAVE IN THAT UNIT, HOW IT'S SET UP, AND HOW THE NEW HOSPITAL IS GOING TO CHANGE THAT.

>> THANK YOU.

>> CAN YOU TALK ABOUT THAT?

>> SURE. THAT'S A GREAT OPPORTUNITY.

CURRENTLY, IT'S AN OPEN FORUM, SO ALL OF THE BEDS AND FAMILIES SPACES.

>> I'M SORRY. MAYBE I SHOULD ASK YOU TO TELL PEOPLE WHAT NICU MEANS.

>> GREAT. NEONATAL INTENSIVE CARE UNIT.

[04:00:02]

IT'S WHERE OUR SICKEST MOST YOUNG PATIENTS GO.

TINY LITTLE BABIES, PREMATURE BABIES, BABIES THAT STAY WITH US FOR A COUPLE OF MONTHS, WILL STAY IN THAT SPACE, AND IT'S CURRENTLY AN OPEN SPACE.

JUST THIS ROOM IS SIMILAR TO HOW THAT SPACE IS CURRENTLY SET UP.

THERE ARE NO WALLS THAT DEFINE EACH PATIENT'S SPACE.

IF I'M A FAMILY MEMBER AND I'M THERE WITH MY BABY, I MIGHT BE JUST AS CLOSE AS THIS GENTLEMAN RIGHT HERE WITH A SMALL PARTITION THAT COMES UP ABOUT THIS HIGH, SO WE CAN STILL MAKE EYE CONTACT WITH ONE ANOTHER.

TO SAY THERE'S NO PRIVACY CURRENTLY IS A SIGNIFICANT UNDERSTATEMENT.

IN THE NEW FACILITY, ALL ROOMS WILL BE PRIVATE, WHICH WILL ALLOW FAMILIES TO BE ABLE TO ROOM AND STAY WITH THEIR BABIES, WHICH MAKES A SIGNIFICANT DIFFERENCE IN HEALING AND BEING ABLE TO DISCHARGE BABIES SOONER AND ALLOW FOR FAMILIES TO HAVE BETTER TIME SPENT WITH THEIR BABIES OPPOSED TO WHAT WE HAVE NOW WITH THE OPEN SPACE.

>> HOW MANY SPACES DO YOU HAVE NOW?

>> I THINK WE HAVE 16 CURRENTLY.

>> HOW MANY WILL YOU HAVE WITH THE NEW HOSPITAL?

>> TWENTY WITH TWINS AND TRIPLETS.

>> WE'LL GO FROM 16 TO 20.

>> BUT THEN YOU CAN ADD TWO OR THREE MORE BABIES WHEN YOU HAVE TWINS OR TRIPLETS.

CAN YOU CONSIDER THAT?

>> WHEN WE GO TO OUR NEW SPACE, YOU'LL BE ABLE TO HAVE ADDITIONAL ROOMS FOR TWINS AND TRIPLETS, WHICH WE CAN NOT CURRENTLY FACILITATE AT OUR CURRENT LOCATION.

>> THEY TYPICALLY ARE WHEN THEY'RE BORN TWINS OR TRIPLETS, WOULD IT BE FAIR TO SAY THAT THEY NEEDED A LITTLE BIT MORE CARE BECAUSE SOMETIMES THEY MIGHT BE EARLY OR WHATEVER.

>> I WOULD SAY, BEING ABLE TO FACILITATE THAT, WOULD MAKE A SIGNIFICANT DIFFERENCE FOR THE PATIENT AND FAMILY EXPERIENCE.

CURRENTLY RIGHT NOW, IF WE HAD TO SHIP A FAMILY AND THEY WERE TWINS, THAT WOULD BE A SIGNIFICANT IMPACT ON THAT FAMILY COMPARED TO BEING ABLE TO KEEP THEM CLOSER TO HOME AND CARE FOR THEM IN A SPACE THAT WE COULD HAVE MORE TIME SPENT WITH FAMILY.

>> IF I MAY JUST ADD TO THE CAPACITY.

THIS IS A UNIT THAT SO BADLY NEEDS THE CAPACITY THAT WE ACTUALLY HAVE PERMISSION FROM THE ARIZONA DEPARTMENT OF HEALTH SERVICES TO USE THESE TINY LITTLE OVERFLOW SPACES THAT ARE IN A WALKWAY TO HOUSE TWO EXTRA BABIES, SO WE OFTEN GO TO 18.

IT'S EVERYTHING TIFFANY SAID ABOUT NOT IDEAL CARE AND IT'S MADE WORSE, BUT THE DEMAND IS THAT HIGH FOR THAT UNIT IN PARTICULAR.

>> CAN YOU ALSO TALK ABOUT, AND THIS MAY BE SOME DATA THAT OTHER PEOPLE DON'T HAVE, BUT TYPICALLY WOMEN OF COLOR HAVE A HIGHER RISK OF PREMATURE BABIES THAN ANY OTHER GROUP, AND ESPECIALLY AFRICAN-AMERICAN WOMEN.

CAN YOU TALK ABOUT THE QUALITY OF CARE THAT WE WOULD HAVE WITH HAVING MORE SPACE AND BEING MORE PRIVATE?

>> YEAH, I THINK THAT'S AN EXCELLENT QUESTION AND A VERY TRUE STATISTIC, UNFORTUNATELY.

WHERE I WOULD GO WITH THAT IS FAMILY INTEGRATED CARE AND MAKING SURE THAT WE'RE ABLE TO KEEP FAMILIES AT THE BEDSIDE WITH THEIR NEWBORN, MAKING SURE THAT WE COULD PROVIDE THE NECESSARY EDUCATION TO FAMILIES AND THAT WE'RE NOT SENDING THEM HOME WHEN THE LIGHTS GO DARK AND VISITING HOURS ARE OVER.

THE IMPORTANCE OF BEING ABLE TO KEEP A FAMILY UNIT, NOT JUST MOM, DAD, AUNTY, UNCLE, GRANDMA, WHOEVER IT MIGHT BE, AND THAT'S GOING TO BE CARING FOR THAT CHILD AT THE BEDSIDE WITH THE CHILD, AND ALLOWING FOR THAT EDUCATION 24/7, NOT JUST DURING VISITING HOURS, WILL MAKE A SIGNIFICANT DIFFERENCE FOR ALL OF OUR PATIENT POPULATIONS.

>> THANK YOU SO MUCH, I APPRECIATE THAT.

>> THANK YOU.

>> STEVE, I'M GOING TO ASK YOU TO, IN JUST A FEW MINUTES, TALK A LITTLE BIT ABOUT WHY OR WHY NOT DOES IT MAKE SENSE TO NOT SELL THIS NEW HOSPITAL WHEN IT'S FINISHED?

>> I DON'T THINK IT WOULD BE POSSIBLE TO SELL, QUITE HONESTLY, NOT FOR A REALISTIC VALUATION.

I DON'T THINK WE'RE GOING TO FIND A PARTNER THAT WOULD HAVE THE COMMITMENT THAT NIH HAS TO FLAGSTAFF AND TO THE REGION.

I THINK WE'VE DISPLAYED IT THROUGH THE EVENING.

WE MAKE A LOT OF FINANCIAL ACCOMMODATIONS FOR THE COMMUNITY.

WE RUN SERVICES THAT OTHER HEALTHCARE SYSTEMS MIGHT

[04:05:03]

CHOOSE NOT TO OFFER BECAUSE WE KNOW WE OPERATE THEM AT A FINANCIAL LOSS.

BUT WE ALSO UNDERSTAND THAT WE'RE THE ONLY OPPORTUNITY FOR THE COMMUNITY TO HAVE THOSE SERVICES.

I THINK IF SOMEONE ELSE WERE DOING THIS WITH A DIFFERENT VALUE SYSTEM, THEY WOULDN'T BE BUILDING WHAT WE'RE BUILDING AND WHAT WE'RE PROPOSING.

THEY WOULD USE IT MORE AS A REGIONAL REFERRAL CENTER, MORE THAN A REGIONAL MEDICAL CENTER THAT CARES FOR THE ENTIRE HALF OF THE STATE.

>> BASICALLY, THEY WOULD JUST SEND ME DOWN TO PHOENIX.

>> I THINK THAT'S WHAT YOU WOULD SEE IN SOME CASES, YES.

>> THAT'S NOT A FUN THING.

>> IT'S NOT.

>> GREAT COUNSEL, ANY ADDITIONAL QUESTIONS? WE'RE GOING TO TAKE A 20-MINUTE BREAK AND WE'LL BE BACK AT 07:32.

ER IS STILL IN THE PUBLIC HEARING PORTION OF OUR MEETING, WHICH I OPENED FOR ITEM 12A ONE AND TWO.

WE'RE NOW GOING TO TAKE PUBLIC COMMENT ON ITEM 12A ONE AND TWO.

WE SAW EARLIER THAT WHEN ONE PERSON SPEAKS ON BEHALF OF 10, THOSE 10 PERSONS MUST STAND BRIEFLY TO IDENTIFY THEMSELVES.

IF WE HAVE A SIMILAR REQUEST TONIGHT, UNDER OUR RULES OF PROCEDURE, THE 10-PLUS PERSONS WHO STAND ARE PRECLUDED FROM SPEAKING DURING THE PUBLIC HEARING.

THE SPOKESPERSON FOR THOSE 10 WILL HAVE 10 MINUTES. FOR THOSE ONLINE, IF YOU HAVE A TECHNOLOGY GLITCH, WE'RE JUST GOING TO MOVE ON TO THE NEXT PERSON AND THEN CIRCLE BACK TO YOU AND SEE IF YOU'VE BEEN ABLE TO GET YOUR TECHNOLOGY WORKING AND IF WE ARE STILL UNABLE TO HEAR YOU, WE'LL JUST HAVE YOU EMAIL US YOUR COMMENTS.

I WANT TO LET THE PUBLIC KNOW THAT THIS COUNCIL IS GOING TO TAKE THE TIME WE NEED TO DELIBERATE ON THIS PROJECT.

AS YOU'VE ALL HEARD, IT'S A REALLY BIG PROJECT AND IT DESERVES THOUGHTFUL CONSIDERATION AND WE'RE GOING TO GIVE IT THAT.

I WANTED TO SAY THAT BEFORE WE START, AND ALSO WE HAVE A LOT OF PUBLIC COMMENT AND AS THOSE OF YOU WHO HAVE BEEN HERE PREVIOUSLY TO SPEAK TO COUNCIL KNOW, I BELIEVE FIRMLY IN PEOPLE FEELING COMFORTABLE AND SAFE TO EXPRESS THEIR OPINIONS IN THIS SPACE.

I JUST ASK FOR RESPECT FROM THE LISTENING AUDIENCE TO REFRAIN FROM ANY OUTWARD EXPRESSION OF SUPPORT OR OPPOSITION TO WHATEVER SOMEONE IS SAYING.

WITH THAT, WE'RE GOING TO GET TO PUBLIC COMMENT.

[13. PUBLIC PARTICIPATION]

JERONIMO VASQUEZ.

>> GOOD EVENING, EVERYONE. MY NAME IS JERONIMO VASQUEZ.

I'M SUPERVISOR FOR THE COCONINO COUNTY BOARD OF SUPERVISORS DISTRICT 2 AND CURRENT VICE-CHAIR.

I AM ALSO A VICE-CHAIR OF METROPLAN GREATER FLAGSTAFF TRANSPORTATION AUTHORITY, AND THE METROPLAN REPRESENTATIVE ON THE RURAL TRANSPORTATION ADVOCACY COMMITTEE OR COUNCIL, ALSO ON THE NORTHERN ARIZONA COUNCIL OF GOVERNMENTS TRANSPORTATION COMMITTEE AND EXECUTIVE COMMITTEE MEMBER FOR MOUNTAIN LINE.

I'M ALSO A LONG-TIME FLAGSTAFF RESIDENT.

LIVED HERE FOR 30 YEARS.

I HAVE FOUR CHILDREN AND TWO GRANDCHILDREN THAT WERE BORN AT FMC.

I UNDERSTAND THE NEED TO ENVISION THE BEST HEALTH CARE AVAILABLE FOR THE NEXT 50 YEARS.

WHEN MY FATHER HAD CANCER, IT WAS DEFINITELY LESS STRESSFUL BEING ABLE TO HAVE HIS TREATMENT HERE RATHER THAN IN PHOENIX AND WE HAD TO DO BOTH.

YET WE IN COCONINO COUNTY, CONTINUE TO HAVE SOME UNANSWERED QUESTIONS WITH THE TRANSPORTATION STUDY THAT SEEMS ONLY TO ADDRESS THE IMPACT OF PHASE 1 AND NOT THE IMPACT OF THE ENTIRE PROJECT.

ONE OF THE REQUIREMENTS OF THE PARK'S MANAGEMENT PLAN IS THAT

[04:10:02]

THE PARK MUST BE MANAGED WITH AN EMPHASIS ON PUBLIC SAFETY.

WHAT DOES THE ANALYSIS AFTER ALL THREE PHASES ARE COMPLETED, AND HOW WILL THIS IMPACT TRAFFIC FLOW, INCLUDING EMERGENCY VEHICLE ACCESS DURING SPECIAL EVENTS? NAH SAYS THEY HAVE NO CONCERNS, BUT HAS A COMPREHENSIVE TRAFFIC ANALYSIS BEING DONE, ESPECIALLY AFTER ALL THREE PHASES ARE COMPLETED.

SECOND, NAH NOTED THAT THEY ARE SUPPORTIVE OF EXPANSION OF THE PUBLIC TRANSIT SYSTEM AND THE SYSTEM PROVIDING SERVICE TO FORT TUTHILL COUNTY PARK AND FLAGSTAFF PULLIAM AIRPORT.

BUT THAT SUPPORT COMES WITH NO FINANCIAL COMMITMENT TO PROVIDE OR CONTRIBUTE TO THAT TRANSPORTATION SERVICE.

THIRD, NAH SUGGESTS THAT THEY WILL HONOR THE HISTORICAL USE OF THE PARK AND ACCEPT THE CURRENT USES AND NOISE CREATED BY THE CURRENT USES OF THE PARK.

HOWEVER, ONCE IT'S ESTABLISHED, WILL THE HOSPITAL HAVE EXPECTATIONS AFTER THE FACT OF QUIET WITH CONCERTS, THE COUNTY FAIR, AND OTHER EVENTS? THIS IS VERY IMPORTANT DECISION FOR OUR COMMUNITY.

WE ALL WANT THE BEST HEALTH CARE FOR NORTHERN ARIZONA.

THIS MOVE WILL FUNDAMENTALLY SHIFTS THE CENTER OF GRAVITY OF MEDICINE IN FLAGSTAFF FOR HEALTH CARE.

WE NEED TO TAKE THE TIME TO GET IT RIGHT.

THERE ARE STILL SOME FACTORS THAT NEED TO BE DEFINED.

IF THIS PROJECT HAS TO GO THROUGH, AT LEAST MAKE SURE THAT ALL THE COMMUNITY'S CONCERNS HAVE BEEN ADDRESSED PRIOR TO MAKING THAT DECISION. THANK YOU.

>> THANK YOU, JERONIMO.

SOMETHING THAT I DID FORGET TO SAY IS THAT I'M GOING TO ALLOW THE APPLICANT AND STAFF AT THE END OF PUBLIC COMMENTS TO TO PROVIDE CLARIFICATION ON ANY POINTS THAT WERE MADE THIS EVENING. MATT RYAN.

>> GOOD EVENING, MAYOR AND COUNCIL.

MATT RYAN, COCONINO COUNTY SUPERVISOR.

FOR FULL DISCLOSURE, ALSO, A RESIDENT AT MOUNTAIN DELL 1235 WEST COCONINO AVENUE.

I'M HERE IN THE ROLE AS A SUPERVISOR REPRESENTING THE AREA.

BUT ALSO OUR DISCUSSIONS THAT WE'VE HAD, AREAS THAT WE HAVE EXPRESSED CONCERN ABOUT.

OUR STAFF HAS BEEN WORKING WITH THE APPLICANT PERIODICALLY AND WE'RE TRYING TO MOVE TOWARD MORE AGREEABLE OPPORTUNITIES.

PIECES OF POINT AND JUST A NOTE, WERE IN YOUR HOUSE WITH RESPECT.

WHATEVER YOUR DECISION IS, WE DON'T DO LAND PLANNING WITHIN THE CITY ITSELF IN RESPECTING THAT BOUNDARY.

HOWEVER, WE DO HAVE, AS NOTED, COUNTY ISLAND OF MOUNTAIN DELL DO NOTE THAT THE APPLICANT HAD STATED THAT THEY WILL CORRECT THE INTERSECTION TO MOUNTAIN DELL ROAD.

FURTHER INTO MOUNTAIN DELL, IT'S CALLED PALMER AVENUE, MAKING A 90 DEGREE EXPRESSION FROM THE COMMUNITY HAD BEEN THOSE THAT HAD SEEN THE PLANT'S CONCERN ABOUT SLOPE, CREATING 7% SLOPE ON A NORTH FACE FROM THE COMMUNITY THERE IN THAT WAY.

ALSO, THERE WAS A DESIRE FOR SIGNALIZATION.

IT'S BEEN NOTED BY THE APPLICANT THAT THEY'LL PUT IN THE BASE INFRASTRUCTURE TO PROVIDE FOR THAT AS A POTENTIAL FOR THE FUTURE.

AS FAR AS FORT TUTHILL IN THE BOUNDARY, IT SHOULD BE NOTED, THIS LAND WAS THROUGH FLAGSTAFF TO LAND EXCHANGE AND PURPLE SAGE ROAD, ACTUALLY IS A FOREST SERVICE ROAD.

WE'RE TRYING TO RETROFIT ON A ROAD THAT WASN'T DESIGNED FOR THE PRIMARY ARTERY THAT IS TO SERVE OVER [INAUDIBLE] MOUNTAIN ROAD AND ROUTE 66.

THERE IS THAT STEEP CURVE AS YOU HEAD WEST ON PURPLE SAGE AND THEN IT BEGINS TO HEAD NORTH.

I WOULD HAVE THOUGHT THAT THAT COULD HAVE BEEN PULLED OUT AND STRAIGHTENED OUT FROM A PRIMARY CAR DOOR DESIGN PERSPECTIVE.

IT WOULD HAVE CREATED MORE OF A GAP, AND INSTEAD OF HAVING A ROADWAY, A PRIMARY CARD, OR ADJACENT TO THE PARK AND THE OPEN SPACE, IT COULD HAVE BEEN MITIGATED IN THAT WAY.

IT'S LATENT IN DESIGN PROCESS, BUT THAT'S WHERE A LOT OF OUR NEGOTIATIONS ARE ASSOCIATED WITH OUR ACCESS AND THE CONCERN FOR THE IMPACT TO THE PARK.

WITH THAT THREE MINUTES,

[04:15:01]

I THINK I'M GOOD FOR COMMENT AT THIS POINT.

BUT WE WANT TO CONTINUE OUR DIALOGUE WITH THE CITY AS WELL AS WITH THE APPLICANT TO SHOW IF THIS MOVES FORWARD, THAT WE COULD ATTEMPT TO MITIGATE THE IMPACTS THAT ARE OCCURRING WITH THESE AREAS.

>> THANK YOU, SUPERVISOR.

>> THANK YOU.

>> WE HAVE PATRICE HORSTMAN AND THEN LUANN MACE.

>> GOOD EVENING, MAYOR AND CITY COUNCIL.

IT'S GREAT TO BE HERE WITH YOU THIS EVENING.

MY NAME IS PATRICE HORSTMAN AND I'M THE CHAIR OF THE BOARD OF SUPERVISORS, AND ALSO THE SUPERVISOR FOR DISTRICT 1.

I'M 50-YEAR FLAGSTAFF RESIDENT, 40 OF THOSE I'VE LIVED IN THE NOHO AREA.

MANY OF US WHO RESIDE HERE IN NORTHERN ARIZONA CERTAINLY HAVE A PERSONAL CONNECTION AND EXPERIENCE WITH OUR FLAGSTAFF HOSPITAL.

I AGREE THAT THE ACCESS TO HIGH-QUALITY HEALTH CARE IS ESSENTIAL FOR THE WELL-BEING OF NORTHERN ARIZONA.

NEW HOSPITAL FACILITY IS NEEDED THAT OFFERS STATE OF THE ART TREATMENTS FOR ALL OF US AND OUR FAMILY MEMBERS TO RECEIVE HIGH-QUALITY MEDICAL CARE IN OUR COMMUNITY.

THE DECISION THAT THE COUNCIL MAKES AND NAH'S REQUEST, WILL AFFECT OUR LIVES NOW AND INTO THE FUTURE.

IT IS IMPORTANT THAT NAH IN THIS COMMUNITY WORKS TOGETHER TO MAKE SURE THAT WE GET IT RIGHT.

AS A SUPERVISOR OF COCONINO COUNTY, THIS ALSO MEANS ENSURING THE REGIONAL PARK FOR TUTHILL IS PROTECTED, AND THE RURAL NEIGHBORHOODS AROUND THE NEW DEVELOPMENT AS WELL AS HOSPITAL HILL NEIGHBORHOODS.

THEY GREW UP IN PROSPERED AROUND THE CURRENT MEDICAL CENTER, ARE ALSO NOT NEGATIVELY AFFECTED BY NAH'S PLANS.

FOR TUTHILL HILL IS OUR COUNTY JAM AND OFFERS OUTDOOR RECREATIONAL OPPORTUNITIES FOR FAMILIES AND TOURISTS ALIKE.

THE COUNTIES RECENTLY FINALIZED ITS MANAGEMENT PLAN THAT LOOKS TO GROW AND ENHANCE THESE ACTIVITIES AND EXPAND FESTIVALS, AND THE USE OF THE AMPHITHEATER.

IN DECEMBER OF THIS YEAR, COCONINO COUNTY SENT A LETTER TO NAH LAYING OUT OUR CONCERNS.

LAST WEEK, THE COUNTY RECEIVED A WRITTEN RESPONSE AND WE RECEIVED FOR THE FIRST TIME A MAP OF THE PROPOSED SITE WITH THE OVERLAY OF NAH PLANS DEVELOPMENT AT FORT TUTHILL.

THE MAP SHOWS THAT FORT TUTHILL WILL BE ENCASED BY THE PROPOSED DEVELOPMENT ON THE NORTH AND EAST SIDE.

WE NEED TO KNOW WHAT DOES THIS MEAN FOR A PROPOSED MEDICAL CENTER IN HOSPITAL NEXT TO A COUNTY PARK? WHAT DOES IT MEAN IN TERMS OF TRAFFIC NOISE, AND HOW WE'LL FAMILIES WITH EMERGENCY TRIPS OR AMBULANCE TRIPS TO THE HOSPITAL BE HANDLED DURING A MAJOR EVENT AT THE PARK, FOR EXAMPLE, THE COUNTY FAIR.

WHAT DOES IT MEAN IN TERMS OF THE FUTURE OF OUR MUSIC VENUE AND OUR OUTDOOR DOOR EVENTS AND ON THE FUTURE ENHANCEMENT IN BUILD-OUT OF OUR REGIONAL COUNTY PARK.

WHEN NAH WAS ASKED ABOUT THE COUNTY'S CONCERNS ABOUT ENHANCING AND BUILDING FUTURE OPPORTUNITIES AT THE PARK, NAH RESPONDED THAT THEY WENT ON AT THE HISTORICAL USE OF THE PARK AND ACCEPT THE CURRENT USES AND NOISE CREATED BY THE CURRENT USE OF THE PARK.

THIS IS SIMPLY NOT ACCEPTABLE, AND NOT APPROPRIATE FOR THE FUTURE OF A VIBRANT REGIONAL PARK.